EGGC4214 Systems Engineering & Economy Lecture 6 Rate of Return Analysis 1.

Slides:



Advertisements
Similar presentations
Chapter 7 Rate of Return Analysis
Advertisements

Other Analysis Techniques
INTEREST AND CASH FLOW DIAGRAM
FI3300 Corporate Finance Spring Semester 2010 Dr. Isabel Tkatch Assistant Professor of Finance 1.
Chapter 2 The Time Value of Money.
Discounted Cash Flow Valuation Chapter 5 2 Topics Be able to compute the future value of multiple cash flows Be able to compute the present value of.
1 Finance: Net Present Value 8.1 ECON 201 Summer 2009.
Chapter 4: Time Value of Money
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Valuation Under Certainty Investors must be concerned with: - Time - Uncertainty First, examine the effects of time for one-period assets. Money has time.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 7-1 Developed.
Multiple Cash Flows –Future Value Example 6.1
Other Analysis Techniques
Comparison Methods Part 2. Copyright © 2006 Pearson Education Canada Inc Introduction Chapter 4 introduced the Present Worth and Annual Worth.
Chapter 7 - Rate of Return Analysis Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
Internal Rate of Return (Multiple Rates of Return Problem) ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering.
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis.
(c) 2001 Contemporary Engineering Economics 1 Chapter 9 Rate of Return Analysis Rate of Return Methods for Finding ROR Internal Rate of Return (IRR) Criterion.
Internal Rate of Return (Multiple Rates of Return Problem) Lecture No. 20 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
(c) 2001 Contemporary Engineering Economics 1 Chapter 9 Rate of Return Analysis Rate of Return Methods for Finding ROR Internal Rate of Return (IRR) Criterion.
Fin 351: lectures 3-4 Time Value of Money Present value of future cash flows or payments.
Interest Rates and Rates of Return
Contemporary Engineering Economics, 4 th edition, © 2007 Rate of Return Analysis Lecture No. 24 Chapter 7 Contemporary Engineering Economics Copyright.
(c) 2001 Contemporary Engineering Economics 1 Chapter 9 Rate of Return Analysis Rate of Return Methods for Finding ROR Internal Rate of Return (IRR) Criterion.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Lecture 2 Engineering Economics ENGR 3300 Department of Mechanical Engineering Inter American University of Puerto Rico Bayamon Campus Dr. Omar E. Meza.
Rate of Return Analysis Lecture No. 19 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
5.0 Chapter 5 Discounte d Cash Flow Valuation. 5.1 Key Concepts and Skills Be able to compute the future value of multiple cash flows Be able to compute.
5.0 Chapter 4 Time Value of Money: Valuing Cash Flows.
Valuation of Cash Flows
Multiple Cash Flows –Future Value Example
CHAPTER 6 Discounted Cash Flow Valuation. Key Concepts and Skills Be able to compute the future value of multiple cash flows Be able to compute the present.
The Time Value of Money.
Copyright © 2003 McGraw Hill Ryerson Limited 4-1 prepared by: Carol Edwards BA, MBA, CFA Instructor, Finance British Columbia Institute of Technology Fundamentals.
9 - 1 The financial (monetary) value of any asset (investment) is based on future cash flows. However, the value of a dollar to be received in the future.
Chapter 7 Rate of Return Analysis
IEN255 Chapter 6 - Rate of Return Analysis
Lecture 3 Managerial Finance FINA 6335 Ronald F. Singer.
Chapter 4 The Time Value of Money
1 Microeconomics Lecture 11 Capital market Institute of Economic Theories - University of Miskolc Mónika Orloczki Assistant lecturer Andrea Gubik Safrany,
Rate of Return Analysis
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 RATE OF RETURN ANALYSIS Course Outline 7.
Chapter 5 Rate of Return Analysis: Single Alternative 5-1.
Example [1] Time Value of Money
Financial management: Lecture 3 Time value of money Some important concepts.
Interest ratesslide 1 INTEREST RATE DETERMINATION The rate of interest is the price of money to borrow and lend. Rates of interest are expressed as decimals.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
© 2003 McGraw-Hill Ryerson Limited 9 9 Chapter The Time Value of Money-Part 1 McGraw-Hill Ryerson©2003 McGraw-Hill Ryerson Limited Based on: Terry Fegarty.
1 Slides for BAII+ Calculator Training Videos. 2 Slides for Lesson 1 There are no corresponding slides for Lesson 1, “Introduction to the Calculator”
1 THE INTERNAL RATE OF RETURN (IRR) is the discount rate that forces the NPV of the project to zero.
NPV and the Time Value of Money
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
ISU CCEE CE 203 Rate of Return Analysis (EEA Chapter 7)
EGR Rate of Return Analysis Rate of Return (ROR) is the rate paid on the unpaid balance of borrowed money, or the rate earned on the unrecovered.
McGraw-Hill/Irwin ©2001 The McGraw-Hill Companies All Rights Reserved 5.0 Chapter 5 Discounte d Cash Flow Valuation.
1 Chapter 7 Rate of Return Analysis. 2 Recall the $5,000 debt example in chapter 3. Each of the four plans were used to repay the amount of $5000. At.
The Time Value of Money Lecture 3 and 4 Corporate Finance Ronald F. Singer Fall, 2010.
Lecture 2 Managerial Finance FINA 6335 Ronald F. Singer.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Incremental Analysis Lecture No.
12/17/2015rd1 Engineering Economic Analysis Chapter 15  Selection of a MARR.
Lecture Outline Basic time value of money (TVM) relationship
Oleh : Arwan Apriyono Paulus Setyo Nugroho. I NTRODUCTION Decision making methods -NPV/NPW -ROR/IRR -B/C Fundamental knowledge -Value of money (PV, FV,
L:21 Incremental Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Chapter 5 Interest Rates. Chapter Outline 5.1 Interest Rate Quotes and Adjustments 5.2 Application: Discount Rates and Loans 5.3 The Determinants of Interest.
1 Simple interest, Compound Interests & Time Value of Money Lesson 1 – Simple Interest.
Chapter 9 Rate of Return Analysis
Rate of Return Analysis
RATE OF RETURN ANALYSIS CHAPTER 7
Engineering Economic Analysis
Engineering Economic Analysis
Presentation transcript:

EGGC4214 Systems Engineering & Economy Lecture 6 Rate of Return Analysis 1

Internal Rate of Return Lender ’ s Viewpoint The interest rate on the balance of a loan such that the unpaid loan balance equals zero when the final payment is made. 2 Year Cash Flow We know that the PW of five payments of $1252 are equivalent to $5000 when interest rate is 8%. 2. At the end of 5 years, the payments exactly repaid the $5000 debt with interest rate 8%. We say the lender received 8% rate of return.

Internal Rate of Return Investor ’ s Viewpoint The interest rate earned on the unrecovered investment such that the unrecovered investment equals zero at the end of the life of the investment. 3 1.Investment $5000 in a machine with lift time 5 years and an EUAB of $1252, what is the interest rate we receive on this investment? 2. The cash flow stream is with 8% rate of return. Year Cash Flow

Internal Rate of Return (IRR) By definition: – Given a cash flow stream, IRR is the interest rate i at which the benefits are equivalent to the costs or the NPW=0 NPW = 0 PW of benefits - PW of costs = 0 PW of benefits = PW of costs PW of benefits / PW of costs = 1 EUAB - EUAC = 0 4

Internal Rate of Return (IRR) = 100/(1+i) + 175/(1+i) /(1+i) /(1+i) 4. It turns out that i = 6.09 % Suppose you have the following cash flow stream. You invest $700, and then receive $100, $175, $250, and $325 at the end of years 1, 2, 3 and 4 respectively. What is the IRR for your investment? 0 1 $700 $100 time 234 $175 $250 $325 How to calculate IRR?

Calculating IRR Ways to find the IRR Compound Interest Tables Interest Tables and Interpolation Graphically (see the graph of f(c)) Numerically (Excel’s IRR, or other root finding methods). If you have a CFS with an investment (-P) followed by benefits (non negative) from the investment. The graph of NPW versus i will have the same general form. It will decrease at a decreasing rate and have a value 0 at some unique value i*. Where the graph has a value 0 defines the IRR 6 NPW = /(1+i) + 175/(1+i) /(1+i) /(1+i) 4. $ $100 time 234 $175 $250 $325 If we have a CFS with borrowed money involved, e.g., (P,-A,-A,-A), the NPW plot would be “flipped around” and would look something like the following one:

Example $5000 $1252 time 234 $ PWB/PWC = (P/A,i,5)/5000 = 1 (P/A,i,5) = 5000/1252 = % % % (P/A,i,5)Interest Rate From Compound Interest Tables I = 8%

Example 8

9

10

Example 11

Example 12

Example 2: Graphical Solution 13 PW of costs = PW of benefits 100=20/(1+i)+30/(1+i) 2 +20/(1+i) 3 +40/(1+i) 4 +40/(1+i) 5 i = 13.5% NPW= /(1+i)+30/(1+i)2+20/(1+i)3+40/(1+i)4+40/(1+i)5

Some concept about Interest Interest Convention. If a lender says she is receiving 11% interest, it might seem reasonable to you to say that the borrower is faced with -11% interest. Interest is referred to in absolute terms without associating a positive or negative sign with it. A banker might say she pays 5% interest on savings accounts, and charges 11% on personal loans – no sign is associated with the rates. We implicitly recognize interest as a charge for the use of someone else’s money and as a receipt for letting others use our money. In determining the interest rate in a particular situation, we solve for a single unsigned value of it. We then view this value in the customary way, either as a – charge for borrowing money, or – as a receipt for lending money. 14

Internal Rate of Return (IRR) One can make up cash flow streams where no positive real root exists, or even where roots are complex numbers. To do so you must violate the hypotheses of the IRR Main Result. Note. Some entries in a CFS can be 0. Example. Buy a Merrill Lynch Ready Assets Trust for $5,000. Sell it two years later for $5926. Then CFS = (-5000,0,5926), and IRR = %. 15

Rate of Return Analysis Example statements about a project: 1.The net present worth of the project is $32, The equivalent uniform annual benefit is $2, The project will produce a 23% rate of return The third statement is perhaps most widely understood. Rate of return analysis is probably the most frequently used analysis technique in industry. Its major advantage is that it provides a figure of merit that is readily understood. 16

Rate of Return Analysis Rate of return analysis has another advantage. With NPW or EUAB one must choose an interest rate for using in the calculations. This choice may possibly be difficult or controversial. With RoR analysis no (exterior) interest rate is introduced into the calculations. Instead, we compute a RoR from the CFS. Warning. Relying only on RoR is not always a good idea. 17

Rate of Return Analysis Motivating Example. Banks 1 and 2 offer you the following Deals 1 and 2 respectively: 18 Deal 1. Invest $2,000 today. At the end of years 1, 2, and 3 get $100, $100, and $500 in interest; at the end of year 4, get $2,200 in principal and interest. Deal 2: Invest $2,000 today. At the end of years 1, 2, and 3 get $100, $100, and $100 in interest; at the end of year 4, get $2,000 in principal only. Question. Which deal is the best?

Rate of Return Analysis Deal 1: Find out the implicit interest rate you would be receiving; that is, solve for 2000 = 100/(1+i) /(1+i) /(1+i) /(1+i) 4 IRR: i = %. This is the interest rate for the PV of your payments to be $2,000. Deal 2: We find i for which 2000 = 100/(1+i) /(1+i) /(1+i) /(1+i) 4 IRR: i = %. Which deal would you prefer? 19

 CFS Analysis 20 We have two CFS’s. 1.Number them CFS 1 and CFS 2, with CFS 1 having the largest year 0 cost (in absolute value). 2.Compute  CFS = CFS 1 – CFS 2. (It’s year 0 entry must be negative.) 3.Find the IRR for  CFS, say  IRR. 4.If  IRR  MARR, choose CFS 1. If not, choose CFS 2. Example: there are two cash flows: (-20,28) and (-10,15). MARR = 6%. 1.CFS 1 = (-20,28), CFS 2 = (-10,15) 2.  CFS = CFS 1 -CFS 2 =(-10,13) 3.  IRR = 30%. 4.  IRR > MARR => we choose CFS 1 = (-20,28).

 CFS Analysis More generally, suppose you must choose between projects A or B. We can rewrite the CFS for B as B = A + (B – A). In this representation B has two CFS components: (1)the same CFS as A, and (2)the incremental component (B – A). B is preferred to A when the IRR on (B–A) exceeds the MARR. Thus, to choose one between B and A, IRR analysis is done by computing the IRR on the incremental investment (B-A) between the projects. 21

 CFS Analysis In summary, we compute the CFS for the difference between the projects by subtracting the cash flow for the lower investment-cost project (A) from that of the higher investment-cost project (B). Then, the decision rule is as follows: IF Δ IRR B-A > MARR, select B IF Δ IRR B-A = MARR, select either A or B IF Δ IRR B-A < MARR, select A. Here, B-A is an investment increment. 22

Why we use ΔIRR in IRR analysis 23 Years 0 1 A B B-A ΔIRR B-A 30%MARR < ΔIRR B-A Select B MARR=6% IRR 50% 40% NPV Select B Select A Although the rate of return of A is higher than B, B got $8 return from the $20 investment and A only got $5 return from $10 investment. Project B: you put $20 in project B to get a return $8. Project A: you put only $10 in project A to get a return only $5.

Example of Rate of Return Analyses 24

Example 7-4 A new corporate bond was initially sold by a stockbroker to an investor for $1000. The issuing corporation promised to pay the bond holder $40 interest on the $1000 face value of the bond every 6 months, and to repay the $1000 at the end of 10 years. After one year the bond was sold by the original buyer for $950. (a) What rate of return original buyer receive on his investment? (b) What rate of return can the new buyer (paying$950) expect to receive if he keeps the bond for its remaining 9- year life? 25

26

27

28

29

Example

31

32

33

Example

35

36