Mitigation Devices External Interface ICS Nick Levchenko Lund Date: 2015-12-09.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
The applications of FA-M3 PLC used in SSRF ZHOU Dayong
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael. A. Clarke-Gayther RAL / ASTeC.
Operation Sabbath Mode - SELECT PROGRAM - Lights, alarms and fans Normal Sabbath Overview.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
LBDS Power Triggering Etienne CARLIER & Jean-Louis BRETIN AB/BT/EC.
November 18, 2002Richard Talaga1 Target Hall Instrumentation NuMI Neutrino Beam Devices Instrumentation Review Instrumentation &Communication Overview.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Kicker generator and controls installation in ECA5? Etienne CARLIER
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther RAL / ASTeC.
1394b Gigabit Ethernet The transmitter Group (G8) Design Proposal Mubin Ansari Zubair P. Siddiqui February 14, 2002.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
ELENA Fast Deflectors Generators N.Voumard, T. Gharsa.
FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Machine Protection: Status + Outlook Status of the fast protection system Beam.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
M. A. Clarke-GaytherRAL/FETS/HIPPICARE-07 October 30 th 2007 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
Tobias Stadlbauer Special Magnets MedAustron 7-8 October 2010 Special Magnets Controls Status and Plans IntroductionPower SupplySlow ControlsAOB.
Beam Interlock System Technology Evaluation and Design MACS Week 1, 2011 Hannes Pavetits 1 R. Gutleber PR a-HPA, March 28 th, 2011 H. Pavetits.
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
SNS chopper - Approach to the problem, past experience at SNS and proposal for ESS specific conditions. A. Aleksandrov Spallation Neutron Source Oak Ridge,
Status report on ICS interfaces (Accelerator, Target, NSS, CF) and related activities Miha Reščič Deputy Project Manager, ICS
Page Beam Instrumentation mini- workshop Conclusions from the Hardware, Timing and MPS mini-workshop Lund, Miha Reščič Deputy Head of
Start of Sales MSI-XXXB Safety Relays Plugable screw or spring-cage terminal blocks.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
The ESS high intensity proton source and the LEBT: status, planning & open points L. Celona on behalf the LNS team Istituto Nazionale di Fisica Nucleare.
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
ESS Front End diagnostic
Machine Protection Requirements and Concept Annika Nordt et al. European Spallation Source ERIC Machine Protection Review, December 2015 Lund, Sweden.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
352MHz Klystron Control for the 3MeV Linac test stand
Proton Source and LEBT Luigi Celona & Lorenzo Neri
LHC BLM system: system overview
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Interlocking of CNGS (and other high intensity beams) at the SPS
RF Local Protection System
BCM-BIS Interface Szandra Kövecses
Ion Source and LEBT control system topology, Interlock strategy
Personnel Safety system 0 for the Ion Source and LEBT (PSS0)
ISRC and LEBT Vacuum System Design
PSS0 Scope Stuart Birch 8th February 2018.
PSS0 Design & Concept of Operations
MPS commissioning at ESS
LEBT water cooling system
PSS Verification and validation
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Safety Readiness Review (SRR) Thomas Hansson, ESH
UITF Conduct of Operations Review
Clement Derrez European Spallation Source ERIC Date
Operation of Target Safety System (TSS)
Hardware integration and interfaces
Critical Design Review Personnel Safety System: PSS0
ISrc & LEBT – ICS Installation Readiness Review
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Mitigation Devices External Interface ICS Nick Levchenko Lund Date:

Scope Magnetron LEBT Chopper 2

Magnetron (Overview) Provides microwaves to generate plasma in the plasma chamber Model: Sairem GMP 20 KE/D Disabling magnetron will stop microwaves generation, therefore collapsing plasma and stopping the beam production Beam stop time: relatively slow, approximately 100 µs Details of magnetron internal circuit boards drawings are expected from Sairem to be reviewed by ESS 3

Magnetron (Interfaces) Timing System (Triggering) Integrated Control System (Control & Monitoring) Beam Interlock System (Machine Protection) 4

Magnetron (Architecture) HV Fast Shutdown Rack Magnetron Head Magnetron HV Supply External Interfaces: Timing System ICS BIS 5 Modbus Gateway Fault Control HV Fast Shutdown Power Supply BIS

Magnetron(External Interfaces) 6 SignalTypeFormatConnector On/OffDigital InOptical FibreHFBR On/OffDigital OutOptical FibreHFBR Fast StopDigital InOptical FibreHFBR On/OffDigital OutM12 On/OffDigital OutM12 FaultDigital InM12 FaultDigital InM12 Control & Monitor VariousModbusRJ45

LEBT Chopper (Overview) Chops the beam pulses Custom made by INFN (Catania), based on the design for Spiral2 (France) Enabling high voltage (10 kV) will deviate the beam to the beam dump preventing it from travelling any further to the target Beam stop time: approximately 300 ns Using chopper to stop the beam is an additional measure to improve the slow response time of primary beam stop method (magnetron) Primary method (magnetron) must be deployed, as chopper will overheat beam dump Details of chopper external interface and internal circuit boards drawings had been provided by INFN and are being reviewed by ESS at the moment 7

LEBT Chopper (Interfaces) Timing System (Triggering) Integrated Control System (Control & Monitoring) Beam Interlock System (Machine Protection) 8

LEBT Chopper (Architecture) HV Module Beam Vacuum chamber with deflecting electrodes Feedthrough HV PS (0 – 10 kV) HV Switch LV Module PS Control, monitoring and alarm circuit boards External Interfaces: Timing System ICS BIS 9

LEBT Chopper (HV Module) 10

LEBT Chopper (External Connections) 11

LEBT Chopper (External Interfaces) 12