24.05.11Petra HaefnerSCT Expert Training SCT Expert Training Data Quality 1.

Slides:



Advertisements
Similar presentations
Welcome to eDMR This PowerPoint presentation is designed to show eDMR users how to login and begin using the eDMR system.
Advertisements

“The Honeywell Web-based Corrective Action Solution”
E-Portfolio July2014 Managing Multi-source Feedback.
Logging In Go to web site:
ECATS “The Honeywell Web-based Corrective Action Solution” CAR Process Last Revised: August 19 th 2008 Honeywell Confidential & Proprietary.
Copyright Autoliv Inc., All Rights Reserved AEU Ariba Direct Material Suppliers training Offline version May 2011.
Prezentacja systemu składania wniosków EPSS (Electronic Proposal Submission System) Mikołaj Pyczak Krajowy Punkt Kontaktowy Dzień informacyjny.
Trent’s ROMEO e-System
Purchasing Goods and Services. Overview In this session you will learn how to utilize the eProcurement Module to create requisitions for purchasing goods.
TFACTS Private Provider Financial/Invoicing Overview 1.
Calendar Browser is a groupware used for booking all kinds of resources within an organization. Calendar Browser is installed on a file server and in a.
Software to Manage EEP Vegetation Plot Data A design proposal Michael Lee January 31, 2011.
Early Registration System Version 1.1 Student’s Manual Developed by Ovais Khan.
HP Asset Hub Support through Service Central
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
Application Process USAJOBS – Application Manager USA STAFFING ® —OPM’S AUTOMATED HIRING TOOL FOR FEDERAL AGENCIES.
Virtual Health & Safety Management System (VHSMS) A Brief Guide for Head Teachers.
FireRMS SQL Audit, Archiving & Purging Presented by Laura Small FireRMS Quality Assurance.
WORKS ALLOCATION AND SIGN OFF OF EXPENSEWORKS ALLOCATION AND SIGN OFF OF EXPENSE Works users can allocate and/or sign off as soon as transactions appears.
WORKS LOGIN:
Washington Campus Compact New Time Log Database Note to users: You should use Internet Explorer to use this database. In other programs (i.e. Firefox)
Offline Tracker DQM Shift Tutorial. 29/19/20152 Tracker Shifts Overview Online Shifts at P5 (3/day for 24 hours coverage) – One Pixel shifter and one.
Online Reporting Guide
A SIR web based leave/absence management system. By Dave Doulton University of Southampton.
For Users : Username & Password for logging in to system : CME proposal to be added in system For System Configuration : Initial budget or latest updated.
Lead Management Tool Partner User Guide March 15, 2013
Support Training Module. Support Manual 1.“On The Lot” – How it all works… 2.Craigslist Settings 3.Post to Craigslist 4.Backpage Settings 5.Post to Backpage.
Accessing E-DRIVER File for the first time Critical Steps to Assuring Success O nline S afety & C ompliance E lectronic R eporting System.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
Processing Exempt Submissions 1-page Reference Guides.
Payment Services Supplier Portal Training Vittoria Falbo (FSS Global Service Management)
ABI/Aeries Training Part II (Gradebook, Reports, & Grade Reporting) Presented by Steve Sankey (Mt. Diablo High), Ryan Clason (Concord High), and Shauna.
Mtivity Client Support System Quick start guide. Mtivity Client Support System We are very pleased to announce the launch of a new Client Support System.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
Qualifications Portal Guide Personal Development and Employability Qualification.
At the Workforce Development and Continuing Education Student Menu select Register for Noncredit course(s) under Registration.
Steps for posting a training (single event or series) to the regional calendar R&C Regional Calendar.
8 th CIC on Duty meeting Krakow /2006 Enabling Grids for E-sciencE Feedback from SEE first COD shift Emanoil Atanassov Todor Gurov.
SCT DQ Training DQ Training 2011 Dr. Petra Haefner.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Prompt Calibration Loop 11 February Overview Prompt calibration loop in SCT –Provides ATLAS with conditions data used for the bulk reconstruction.
P&G Supplier Portal Training
ID Week 13 th of October 2014 Per Johansson Sheffield University.
ALSMS Upgrade Configuration Example Alcatel-Lucent Security Products Configuration Example Series.
Sponsor MCLE Online System Instructions. Login here: Tip: You may want to bookmark the link for future reference.
Orders and Invoices Supply Chain Platform: Rolls-Royce Training for Indirect Suppliers March 2016.
How to Create eInvoices in SCP-RR Training Presentation for Supply Chain Platform: Rolls-Royce January 2016.
American Diploma Project Administrative Site Training.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
Muon Week DQ Meeting Dr. Petra Haefner, Bonn1 Data Quality Concept of tolerable vs. intolerable defects.
American Diploma Project Administrative Site Training New Jersey.
SchoolSuccess for Coordinators
PeopleSoft HR eRecruit Changes
Advantech AE Siebel 8.1 SOP
Single Sample Registration
At the Workforce Development and Continuing Education Student Menu select Register for Noncredit course(s) under Registration.
PIC + TransNet.
Unit4 Customer Portal Submitting & Managing Cases.
Unit4 Partner Portal for Case Creator
[insert Module title here]
CMS Pixel Data Quality Monitoring
Distributor Want aka. Dis-WAnt
Qualifications Portal Guide
Queries Training Module.
SOP 3: Submit New User Request
CMS Pixel Data Quality Monitoring
Purchasing Department Works Training for the Approver
Presentation transcript:

Petra HaefnerSCT Expert Training SCT Expert Training Data Quality 1

SCT Expert Training Petra Haefner Data Quality Group Link between Detector, CP and Physics Groups Detector flag data flaws caused by hardware / operation issues Combined Performance judge quality of reconstruction objects Physics: “Users” Use only “good” quality data for a specific analysis Feedback what is “good” quality for their analysis 2

SCT Expert Training Petra Haefner The Idea of “Defects” 2010: the DQ shifters had to flag the data green or red for their system / CP object Green: used for physics analysis Red: bad for physics, should not be used Problem There are analyses which are very sensitive to certain data flaws (e.g. little inefficiencies in tracking) No way to find these “little flaws” as no information available after the DQ checks Data is not black or white – There are a lot of shades of grey in-between! Solution Put everything out of the ordinary (defect = primary flag) directly into a database Decide further downstream (virtual flags) if it is good for physics (tolerable) or not (intolerable) 3

SCT Expert Training Petra Haefner Defect Database Tolerable defects Keep track of all the little issues in data Not bad enough to exclude data But: data that comes with a warning! Defects vs. Virtual Flags Shifter only decides IF and WHEN a defect is present Severity of an issue is decided by experts beforehand Severity can be changed easily with more experience and back in time (e.g. tolerable  intolerable) Experts need to know which defects are (in)tolerable! Defects can be set automatically by external information (e.g. DCS flags, DQMF flags) Not implemented yet, Standby defect first use case!? 4

SCT Expert Training Petra Haefner An SCT Example 5 SCT cooling loop failure Combined tracking looks fine SCT >= 7 Hits clearly shows affected region Pretty sure that few analyses very sensitive to tracking will see an effect Tolerable defect

SCT Expert Training Petra Haefner The SCT Defects Based on 2010 experience Dropped DQ regions (in coordination with InnerDetector groups) Include new defects case-by-case (~24 h) Sign-off: needed to distinguish “no defects” from “unchecked run” Set by SCT remote shifters, helped by experts 6

SCT Expert Training Petra Haefner Duties of DQ Shifters Check operation elogs Participate in SCT daily meetings Set defects for each run (announced by DQ group) Contact expert in case of “unknown” defect Sign-off each run (week: DQ meeting, weekend: sharepoint) Write elog for each run Info about all defects set (or “no defects set”) Anything special observed in DQ plots List of problem modules Prepare talk for ID day (Tue, 16:30) summarizing the week of SCT DQ 7

SCT Expert Training Petra Haefner Duties of DQ Experts Provide shifter with any information about special running conditions you have Help shifter in case of uncertainty which defects to set Resolve “unknown” defects Change to already existing defect or Request new defect Confirm with SCT DQ coordination (Dan, PH) Request to DQ Coordination (Helen, Tobias) Sign-off data periods Resolve any pending issues (e.g. recoverable defects, unknown defects, Savannah bug reports) Check bulk processing (pass 2) Pass on relevant information about possible tracking issues to ID DQ experts (Thijs, Adrian, Alex) Present Weekly report at ID day, in case of problematic timezone of remote shifter 8

Petra HaefnerSCT Expert Training The SCT DQ Tools 9

SCT Expert Training Petra Haefner SctDQWebDisplay 10  SCT SCT part mantained by Graham Sellers Includes links to all relevant tools & DCS flags in run query Summarizes SCT status for each run (tracks, efficiencies, module status) DCS

SCT Expert Training Petra Haefner DCS Flags (Run Query) 11 Direct link from WebDisplay to run query search f r and det sct / sh r and t and allev and dq DCSOFL sct and ptag Use to find lumiblocks for STANDBY defect Ramping (yellow) ranges get defect as well! Double-Check if there is a discrepancy between SCT standby and Atlas Ready! Use Voltage Tracker as backup for cross-check Might be automated in the (near) future!

SCT Expert Training Petra Haefner Voltage Tracker 12 Direct Link from WebDisplay ATTENTION: there are missing LB ranges! Cannot rely on finding LB when ramping happened!

SCT Expert Training Petra Haefner SCT Report 13 Include standardized information into DQ elog Source: cron job that gets list of problem modules (runs only every 4 h) Provides problem module information to calibration If the module list is not present send to Helen, PH immediately to get script restarted! Should move to central SCT ressource soon (webserver?)

SCT Expert Training Petra Haefner DQ Monitoring 14 Main tool for monitoring data quality Check “include non-stable-beam runs” to see cosmic / special runs Unfinished run streams are marked with “ *** ” Standard stream: express_express (click on it to get to plots) We do not have a daily bulk signoff (yet), but bulk needs to be checked for period signoff!

SCT Expert Training Petra Haefner Express stream Pass 1 (bulk processed after 36h calibration loop) Entire run 15 Daily Run Signoff

SCT Expert Training Petra Haefner Reference Run 16 So far manual for SCT, follows general recommendations from DQ group (currently: run ) DQ centrally managed reference also available Switch to automated reference soon!? No info on reference run in web display unfortunately, lengthy procedure to find this: If you need to find which run is used as CentrallyManagedReference for a given run, go to the DQM web display of the run in question At the very bottom you will see a line such as "SVNInfo/Revision$Revision: $” Click on the revision number and you will go to svn web interface Click on "downloading" and open the file with your favorite editor. At the top of the file you will see the path of the file used as CentrallyManagedReference. ID is pushing to have this info in the web display, no success with developers, yet

SCT Expert Training Petra Haefner Defect Entry Tool 17 Overview of current SCT defects

SCT Expert Training Petra Haefner Defect Entry Tool 18 Step 1: check defects of a run (filter “SCT”) There will only be the “unchecked” & automatic defects at the start Set filter “GLOBAL” to see Atlas ready defect

SCT Expert Training Petra Haefner Defect Entry Tool 19 Step 2: Set defects for a run If no defects, go to Step 3 directly Check defect from menu on the left Put run, LB range, comment, password in (required fields) Check “expected recoverable” if applicable Choose “present” to add defect, “absent” to remove one from the database Removing defects is expert work! Give comment why defect was removed

SCT Expert Training Petra Haefner Defect Entry Tool 20 After all defects were uploaded / removed check under “show defects” if everything is correct For removed / overwritten defects only the last comment will be visible (e.g. removal reason) Always put a useful comment in! “No comment” is no comment! xxxx

SCT Expert Training Petra Haefner Defect Entry Tool 21 Step 3: signoff the run Distinguish runs without defects from unchecked runs Automatically makes “unchecked” defect “absent” This is shifter’s work! Needs to be done until 16:30 DQ meeting Check before the deadline if runs were checked, send reminder to shifter if not!

SCT Expert Training Petra Haefner Defect Corrections Most common corrections Add / remove LBs from standby defect Remove “unknown” defect, set newly created one Remove “preliminary” defects that needed further investigations (e.g. wronly reported efficiencies) In case of corrections to several runs Stay on “upload” tab Check defect box Fill comment field Put in run number, submit, put in 2 nd run number, submit,… (avoids retyping comment all the time) 22

SCT Expert Training Petra Haefner Points of Attention For data period signoffs (at latest) check that standby defect ranges are correct especially look for discrepancies with Atlas Ready Atlas Ready should be after SCT turned on Atlas Ready should be removed before SCT went to standby In the run query, only defects during Atlas ready are shown  standby will only show up if there is something wrong! Finding lumiblocks for operation issues often requires interaction with operations team Inform ID team about any defects that can affect the tracking Please follow standardized comments as given on the shifter’s Twiki (and remind shifter’s about that) The low efficiency defect is always set for the full run (1-End) although the efficiencies are different during standby Defects are only relevant during Atlas ready Do not want to make one defect (LB range) depending on another (e.g. standby) 23

SCT Expert Training Petra Haefner Contact List SCT DQ Coordination Petra Haefner Dan Damiani Atlas DQ Coordination Helen Hayward Tobias Golling ID DQ Experts Thijs Cornelissen Adrian Vogel Alex Kastanas 24

SCT Expert Training Petra Haefner Documentation & Links SCT DQ Shifter Twiki onitoringShifts General DQ information alRecipes AQ Savannah Bug Tracker Data Period Signoff dSignoff SCTDQRunList (Overview of 2011 defects) 25