AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Basic Refrigeration Cycle
Cryogenic discussion and update 30 October 2014Neutrino platform.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
Current status Arkadiy Klebaner November 21, 2012
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Vapor and Combined Power Cycles (2)
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
N.Delruelle (CERN)31-May-2007 Cryogenics for ATLAS and CMS Experimets N. Delruelle on behalf of AT-ECR group.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
So Far: Conservation of Mass and Energy Pressure Drop in Pipes Flow Measurement Instruments Flow Control (Valves) Types of Pumps and Pump Sizing This Week:
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
GLA2011 The cryogenic systems of the LHC experiments Johan Bremer on behalf of TE/CRG, ATLAS collaboration and CMS collaboration.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
Installation of the T600 at Fermilab CSN2, September 22,
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
SIS 100 Vacuum chamber Recooler String system Components
Installation of the T600 at Fermilab
Status of work (cryostat, control Dewar, cooling system)
Magnet cryogenic system update.
He Plant, LN2 Systems and Commissioing
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
IT-4189 Supply and installation of a cryogenic distribution system
Proximity Cryogenics P&IDs Meeting
HFM Test Station Main Cryostat
Proximity Cryogenics P&IDs meeting
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Aachen Status Report: CO2 Cooling for the CMS Tracker
CRYOGENICS OPERATIONS 2008 Organized by CERN
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
Recirculating CO2 System
Aachen Status Report: CO2 Cooling for the CMS Tracker
ILC Experimental Hall Cryogenics An Overview
Cryogenic System Commissioning Summary Report
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
as a prototype for Super c-tau factory
Presentation transcript:

AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration

AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters CONTENTS: 1.The ATLAS liquid argon calorimeters 2.Main requirements for the associated cryogenic system 3.The LAr cryogenic system: adopted solutions and results 4.Special features 5.Conclusion

AT-ECR/C.FabreMay 31, 2007 The ATLAS Liquid Argon Calorimeters (1) Barrel Calorimeter:  D: 4.3 m; L:6.5 m  Weight: 120 t  Argon volume: 40 m 3 Electromagnetic barrel half-wheel

AT-ECR/C.FabreMay 31, 2007 End-cap Calorimeter:  D: 4.3 m; L: 3 m  Weight: 219 t  Ar volume: 19 m 3 Calorimeters are highly complicated composite structures made of copper, lead, stainless-steel and glass-epoxy… placed in aluminium cryostats The ATLAS Liquid Argon Calorimeters (2)

AT-ECR/C.FabreMay 31, 2007 Cool-down criteria: ∆T must be kept within strict limits to avoid excessive stresses or displacements In total: 7 criteria defined for the barrel 11 criteria defined for the end-cap (T dependence) Steady-state requirements:  No gas bubble formation  Liquid argon bath temperature constant at about 88.4 K  Temperature gradient across bath < 0.7 K  Argon purity < 2 ppmv of O2-equivalent Main Cooling Requirements Energy measurement sensitivity: 2 % per K

AT-ECR/C.FabreMay 31, 2007 The LAr Cryogenic System (1) Nov. 2004: Barrel lowering in ATLAS pit Project stages: : Cold performance test and calibration in particle beam of the 128 individual detector modules : Cryostat and detector integration Individual cryogenic test, at operating temperature of the 3 calorimeters Sept. 2005: Transport of an end-cap calorimeter towards Point 1

AT-ECR/C.FabreMay 31, 2007 The LAr Cryogenic System (2) N 2 refrigerator 2x50m 3 LAr storage tanks 2x50m 3 LN 2 storage tanks 1x80m 3 GN 2 Buffer 15m 3 N 2 Phase Separator Dewar 1.3 km interconnecting LAr & LN 2 transfer-lines 11 distribution valve boxes (picture J.Metselaar)

AT-ECR/C.FabreMay 31, bar End-cap LAr Tanks LN 2 tank LN 2 pump Expansion vessel 1.25 bar 5.3 bar Barrel End-Caps LN 2 phase separator Procedures during cool-down: 1.Rinsing cycles 2.Gas cooling: forced convection of GN 2 in heat exchangers inlet T decreased on a ramp 3.Liquid cooling: circulation of vaporizing LN 2 4.Condensing of argon Cool-down rate limited by an interlock triggered by the cooling criteria The LAr Cryogenic System / Solutions (3)

AT-ECR/C.FabreMay 31, 2007 The LAr Cryogenic System / Solutions (4) Ar triple point T = 83.8 K P = 0.69 bar 89.3 Pmin N 2 = 2.1 bar 2.9 Steady state K 7 K Steady state: Ar and N 2 saturation curves (End-Cap A)

AT-ECR/C.FabreMay 31, 2007 Barrel mean temperature and ∆T variation during cool-down Between 140K and 100K: LN 2 cooling From 100K to 90K: Argon condensing Sub-cooling Cryostat filling & heat load to the cryostat:1.9 kW 6.9 GJ - heat extracted during cool-down: From 295K to 140K : GN 2 cooling Average cooling rate 0.22 K/h The LAr Cryogenic System / Results (5)

AT-ECR/C.FabreMay 31, 2007 End-cap A mean temperature and ∆T variation during cool-down The LAr Cryogenic System / Results (6) 15.7 GJ 2.1 kW 88.3 Average cooling rate 0.13 K/h - heat extracted during cool-down: - heat load to the cryostat: Between 125K and 100K: LN 2 cooling Between 100K and 90K: Argon condensing Purges Cryostat filling & Sub-cooling From 295K to 125K : GN 2 cooling

AT-ECR/C.FabreMay 31, 2007 Steady state :  Temperature uniformity: < 0.3 K  Temperature stability: < 0.02 K  LAr bath sub-cooled with 4.2 K to 7.7 K  Argon purity: between 0.1 and 0.3 ppm of O2-equivalent The LAr Cryogenic System / Results (7) Detector temperature stability: < 0.02 K 0.07 K drop due to change in LN2 pressure (Barrel) (plot P.Puzo)

AT-ECR/C.FabreMay 31, meter longitudinal movement of the end-cap cryostats : Cryogenic lines between expansion vessel and cryostat Transfer-line supplying LN 2 to the heat exchangers Signal cables and compressed air pipes Uninterrupted Functioning over 15 Years (1) designed to follow this movement LAr expansion vessels LN2 heat exchangers regulation valve boxes End-cap A End-cap C 12 m displacement (picture P.Petit) LAr flexible line between expansion vessel and cryostat and associated displacement system Inner diameter: DN150 Outer diameter: DN300 Length: 35 m Bending radius: 1.5 m

AT-ECR/C.FabreMay 31, 2007 First displacements of end-cap A to its extreme opening position with all services connected: cold & empty on filled with LAr on Uninterrupted Functioning over 15 Years (2) © Copyright CERN

AT-ECR/C.FabreMay 31, 2007 End-cap LAr Tanks LN 2 tanks LN 2 pump Expansion vessel 1.25 bar 5.3 bar Barrel End-Caps LN 2 PSD Refri- gerator 2x 50 m 3 15 m 3 End-cap LAr Tanks LN 2 tanks LN 2 pump Expansion vessel 1.25 bar 5.3 bar Barrel End-Caps LN 2 PSD 2x 50 m 3 15 m 3 Uninterrupted Functioning over 15 Years (3) Redundancies :  LN 2 pumps (x3)  LN 2 supply services (x3)  all essential devices on backed-up electrical power system: -EDF/EOS network -diesel generators -UPS  compressed air and cooling water backed up

AT-ECR/C.FabreMay 31, 2007 Special features related to safe handling of large volume of cryogenic liquids in underground area  Argon volume of the three cryostats can be emptied into 2 x 50 m 3 argon storage tanks by: -gravity -cryogenic pump  Argon tanks are: -equipped with LN 2 condenser and kept cold -entirely made of stainless steel  Items containing large volumes are: -equipped with safety valves collected to a dedicated DN 500 pipe going to surface -placed above retention pits  Gas constantly renewed from the retention pits by surface extraction system  Insulation vacuum levels are monitored  Oxygen detectors Safety Aspects

AT-ECR/C.FabreMay 31, 2007 Barrel and End-Cap A successfully cooled-down in 2006 and in stable situation for respectively 10 and 3 months: Argon bath purity, temperature homogeneity and stability fully satisfactory for detector operation purposes End-Cap C cold, to be filled mid- June: All three calorimeters fully operational from July onwards This achievement is the result of collaboration between: BNL, CEA, CERN, LAL, LPSC and NTNU © COPYRIGHT CERNConclusion Barrel Calorimeter in operation in its final position encircled by BT Magnets, Tile Calorimeter and Muon Chambers