Finnish Road Enterprise HDM-4 TUTORIAL FOR THE 5 TH INTERNATIONAL CONFERENCE ON MANAGING PAVEMENTS Case Study: Network Level Strategy for Paved Roads in.

Slides:



Advertisements
Similar presentations
Estonian Pilot Action on Technology Assessment Rene Tõnnisson Institute of Baltic Studies.
Advertisements

ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Executive Session Office of Asset Management
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
A Connected Vehicle-Based Application to Estimate Road Roughness Transportation agencies devote significant resources towards collection of highly detailed.
1 Luis Rodriguez, P.E. Federal Highway Administration Life Cycle Cost Analysis Virginia Concrete Conference March 6-7, 2014.
Wyoming County Paved Roads Management and Monitoring Khaled Ksaibati, Ph.D., P.E. STIC June, 2014.
Software Quality Assurance Plan
ESTONIAN ROAD ADMINISTRATION Pärnu mnt. 463a Tallinn, Estonia Tel (0) Fax (0)
States’ Action Plans and Assistance to States
MEPDG Overview & National Perspective CRSI Expert Task Group Meeting July 29, 2008 Gary Crawford Federal Highway Administration Office of Pavement Technology.
OPTIMIZATION Lecture 24. Optimization Uses sophisticated mathematical modeling techniques for the analysis Multi-step process Provides improved benefit.
CE577_Spring 2007 Pavement Management and Rehabilitation Dr. Fouad Bayomy, PE Professor of Civil Engineering
Life Cycle Cost Analysis in Pavement Design - In Search of Better Investment Decisions - Office of Asset Management Federal Highway Administration Executive.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
/ MRae Road Data Management in Finnish National Road Administration Matti Raekallio Data Manager, M.Sc (Civ. Eng) Finnra, Central Administration.
Section 4 – Supplement Maintenance Management System (MMS) (WAC 136 – 11) Larry Pearson, Maintenance Programs Manager.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Geoinfosys Technologies New Delhi 9 th February 2012 Development of ‘Geographical Information System’ (GIS) based “Decision Support System for Transport”
Federal Aviation Administration Presented to: Pennsylvania State University 2010 Airports Conference By:Al Larkin, Project Manager for Non- Destructive.
DEVELOPING A BUSINESS PLAN
1 Corporate Average Fuel Economy Rulemaking National Highway Traffic Safety Administration Informal Document No. WP th session, June.
M aintenance Efficiency & Cost Effectiveness Initiative Robert M. Peda, P.E. Director, Bureau of Maintenance & Operations, PennDOT MQA Peer Exchange October.
HDM-4 Inputs and Options
Developing a ‘Rapid’ Strategic Land-Use and Transport Policy Model using EMME/2 Marwan AL-Azzawi Senior Transport Planner PDC Consultants, UK Also at Napier.
Estonian Road Administration. Estonian Main, Basic and Secondary Roads 2 The total length of national roads as of is km i.e. 28.1% of.
Henry Kerali Lead Transport Specialist The World Bank
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
ROADS AND BRIDGES (RESEARCH-DEVELOPMENT) Dr. László Gáspár research professor ERTRAC National Platforms Workshop 5 September 2008, Budapest ERTRAC National.
Portfolio Committee on Transport 9 th March 2005 SANRAL 2005/2006 BUDGET DOCS_NRA-#
Knowledge Transfer Programme: An Overview Marc Fleetham Director Business Solutions.
WATER AND SANITATION SECTOR (WSS) IN ESTERN EUROPE AND CAUCASUS Strategic Approach of KfW Development Bank Dr. K. Gevorgyan KfW Representative in Armenia.
HDM-4 Institutionalization. 2 HDM is for decision-support tool; not decision- making Institutionalization process should ensure that outcome is:  sustainable,
SEEP Minimum Economic Recovery Standards ( MERS ): Overview MBRRR Training Session 1.3 Source: SEEP MERS training materials, 2014.
Introduction ICEexpert – an expert system to provide academic assistance to students and staffs. Used at the Instructional Center (IC) located in the University.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
HDM-4 Calibration Henry Kerali Lead Transport Specialist The World Bank.
International Atomic Energy Agency Irina Sanda Education and Training in the Area of Safety Assessment Irina Sanda Safety Assessment Section Division of.
Fourth IABIN Council Meeting Support to Building the Inter-American Biodiversity Information Network.
Evaluation of Low Volume Roads Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR January 10, 2008 The World Bank.
EVALUATION HELPDESK Quality assessment of Evaluation Plans Evaluation Network Meeting 5-6 November 2015.
Road Information System / Road Data Bank 10 April 2013 Lars Bergman M. Sc. In Civil Engineering Long Term Planning Swedish Transport Administration.
UPGRADATION PLANNING OF RURAL ROADS IN G.I.S. ENVIRONMENT UNDER PMGSY.
1 Asset Management and Multi-Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
The World Road Association Development of HDM-4 Neil Robertson PIARC ISOHDM Project Coordinator.
HDM-4 Analysis Options The World Bank Christopher R. Bennett Director - Data Collection Ltd.
1 Library management ‘A clear policy must be formulated defining objectives, priorities and services in relation to the local community needs. The public.
1 The HDM Approach to Multi- Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
Pavement Management in Developing Countries Christopher R. Bennett Senior Transport Specialist East Asia Transport Unit
Implementing a National Pavement Management System: New Zealand’s Pragmatic Approach Dr. Christopher R. Bennett HTC Infrastructure Management Ltd.
Road Investment Decision Framework
Overview of dTIMS Input, Analysis and Reporting HTC INFRASTRUCTURE MANAGEMENT LTD.
The University of Birmingham Role of HDM-4 in Road Management Professor Henry Kerali The University of Birmingham England, UK.
Road Owners and PMS Christopher R. Bennett Senior Transport Specialist East Asia and Pacific Transport The World Bank Washington, D.C.
Building an ENI CBC project
Understanding the Asset Management/TAM Regulations
Multi-Year Programming and Predictive Modelling
Implementation Subprogramme
INTEGRATED AND PLANNED ENFORCEMENT
The main orientations, plans and problems when implementing the
Life Cycle Cost Analysis
PROPOSED ROAD USER CHARGING SYSTEMS - ESTONIA
Introduction and Applications
Introduction and Applications
CIS12-3 IT Project Management
EXPERIENCES FROM LONG-TERM
European Institute of Public Administration (NL)
National level Objective:
Presentation transcript:

Finnish Road Enterprise HDM-4 TUTORIAL FOR THE 5 TH INTERNATIONAL CONFERENCE ON MANAGING PAVEMENTS Case Study: Network Level Strategy for Paved Roads in Estonia Mr. Ari Kalliokoski, Finnish Road Enterprise

Finnish Road Enterprise Introduction The study has been prepared by the Estonian National Road Administration and Technical Center of the Estonian Roads Ltd. with the technical assistance funded and accomplished by the Finnish National Road Administration. Technical guidance: Finnish Road Enterprise Inframan Ltd. The project was completed in February No chances to consider any details in-depth, because of the short of time and funding.

Finnish Road Enterprise The goals of the project The grounds for the need of money. Training of the local experts. The development of the Estonian PMS. The comparison between the previous analysis.

Finnish Road Enterprise FINLAND ESTONIA

Finnish Road Enterprise The Estonian PMS -system Road Data Bank RDB HDM-4 Estonian PMS EPMS Strategic Level Analysis Works Programming Level Analysis

Finnish Road Enterprise Basic Input Data and Assumptions Subnetworks: All the road and traffic data used in the analysis was collected by Estonian PMS experts.

Finnish Road Enterprise Basic Input Data and Assumptions Road Condition Classes: The road condition classes has been determined by local experts. The resulting road network matrix is comprised of (8 x 3 x 3 = ) 72 representative pavement sections DS = Defect Sum

Finnish Road Enterprise Basic Input Data and Assumptions Paved Road Network in Estonia:

Finnish Road Enterprise Basic Input Data and Assumptions Work Standards Maintenance and rehabilitation alternatives, average costs (1000 EEK/km): 1000 EEK = 50 USD SAC = Soft Asphalt Concrete

Finnish Road Enterprise Basic Input Data and Assumptions Work Standards The intervention criteria:

Finnish Road Enterprise Basic Input Data and Assumptions Work Standards Intervention levels, example 1

Finnish Road Enterprise Basic Input Data and Assumptions Work Standards Intervention levels, example 2

Finnish Road Enterprise Basic Input Data and Assumptions Vehicle Fleet 1. Car Medium (passenger cars and vans) 2. Truck Medium 3. Truck Articulated The Level 1 -calibration was carried out for the Road User Effects

Finnish Road Enterprise Examples of Results Analysis Alternatives The following alternatives were analysed: 1. Unconstrained strategy 2. Budget constraint 350 MEEK/year ”Maximise NPV” -optimisation method 20 years, 5 % To show examples of the results To give data for the comparison to HIPS/GIM results (HIPS = Highway Investment Programming System, GIM = Generations Information Manager) HIPS/GIM -analysis has been conducted in 2000 in co- operation with: Estonian National Road Administration Finnish National Road Administration Two finnish companies (100Gen Ltd. & Inframan Ltd.)

Finnish Road Enterprise Examples of Results Unconstrained Programme A summary of the most urgent works (ten representative sections):

Finnish Road Enterprise Examples of Results Unconstrained Programme

Finnish Road Enterprise Examples of Results Budget constraint of 350 MEEK

Finnish Road Enterprise Examples of Results Budget constraint of 350 MEEK

Finnish Road Enterprise Conclusions This study was the first test of HDM-4 Strategy Analysis for Estonia and it was executed in order to gain information, whether HDM-4 would be suitable as strategic analysis part of the Estonian PMS. Calibration at level 1 was also executed succesfully. Estonian partners were trained for use of this tool. Data existing in local databases could be easily converted to HDM-4. The first results were very close to those of the previous strategy analysis (GIM), BUT the NPV/C -rates were very high?? HDM-4 deterministic methodology is rather comparable to the probabilistic one of the GIM. This approach is applicable to Estonian conditions.

Finnish Road Enterprise Problems, difficulties and findings The implementation of the HDM-4 is easy, when following elements exist: MEASURING equipment methods ROAD DATA BANK data input maintaining SKILLED STAFF The data transfer should be easier The more appropriate format of the database is needed. More development of the calibration instructions of the HDM-4 is also needed.