Available at: hwy53relocation/sco ping.html hwy53relocation/sco ping.html.

Slides:



Advertisements
Similar presentations
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
Advertisements

expansion-to-claim-vital-Iron-Range-highway KARE 11 News Story 2.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Best Practices in IEP writing September 26, 2012.
Highway 1/169 Improvements Six Mile Lake Road to Bradach Road “Eagles Nest” October 10, 2014 Project Update Meeting Eagles Nest Town Hall.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
Port St. Lucie City of Crosstown Parkway Extension Project Development and Environment (PD&E) Study & Environmental Impact Statement (EIS) Substantial.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
Environmental Assessment Public Meeting
district development Tanzania – Lake Victoria Greenstone Belt.
Welcome Domestic Well Owners Workshop Sponsored by The Nevada Water Resources Association Spring 2011.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
ENVIRONMENTAL MANAGEMENT PLAN
1 Project Management & Project Management Software Yale Braunstein School of Information Management & Systems UC Berkeley.
Geophysical and Geochemical Exploration Techniques  The specification sates that you should be able to:  Describe the geophysical exploration techniques.
BUILDING STRONG ® Greater New Orleans Hurricane and Storm Damage Risk Reduction System Lake Pontchartrain & Vicinity LPV- 03.2B, West Return Floodwall,
Montgomery County Transit Task Force Meeting August 17, 2011.
SMART Feasibility Study Process
Well Systems. Well System Capacity Well system capacity needs to be large enough to supply daily water need in 10 to 12 hours. Some designers assume 5.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
January 30, 2014 Kurt Parkan, External Affairs Manager Industry Outlook Forum Kenai Peninsula Economic Development District.
Kindergarten Individual Development Survey (KIDS) District 97 pilot involvement December 11, 2012.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
An Education for Sustainable Development and Global Citizenship Toolkit for WBL Providers in Wales Katie Elmer, Associate WSP Environmental 25 th June.
LCWDBoardMtg_ pptx/1 LCWD Board Meeting January 14, Carneros Avenue, Napa Los Carneros Water District.
School Improvement Planning and Reporting for Cohort 2 and Cohort 3 Schools June 8, 2015June 8, 2015.
Project Life Cycle.
Geophysical and Geochemical Exploration Techniques  The specification sates that you should be able to:  Describe the geophysical exploration techniques.
AQUAINT Program Programmatics Dr. John D. Prange AQUAINT Program Director December 2001.
Office of National Transportation Update Presented to: Spent Fuel Project Office Presented by: Gary Lanthrum, Director Office of National Transportation.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Welcome to Construction of Open Space RWHS Orientation.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
EDS 2 Early Delivery Systems Release 3 – Workshop August 16, 2007.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Montana Resources Conceptual Plans for Permitting Continued Mining September 15, 2015.
FORM 1003A – NOTICE OF TEMPORARY EXEMPTION FROM PLUGGING.
Lake Okeechobee Regulation Schedule
November, 2013 TH 53 Realignment: E-1A Preliminary RSS Design GALE-TEC ENGINEERING, INC/Dr. B.R. Christopher November, 2013 Gale-Tec Engineering, Inc.
Fall 2012 The Glen Rock Elementary Report Card Committee.
ECNM Meeting October 1, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects.
 Working with FHWA on review.  Submit to Cooperating Agencies (EPA and Corp of Engineers)  45 day review May  Respond to agency comments  Publish.
FHWA CMGC Workshop October 23, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
 Add potential impacts for a 53/135 interchange  Meeting with FHWA to resolve issues  Do not have a plan/timetable from FHWA for review.  Submit to.
 HDR, Ott Constructability, Dan Brown  Visit and boat tour of Rouchleau pit ◦ Access better than potrayed ◦ Challenging geotechnically 
 HDR, Ott Constructability, Dan Brown  Visit and boat tour of Rouchleau pit ◦ Access better than potrayed ◦ Challenging geotechnically 
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
Upper Middle Road Grade Separation Construction Project Status Update February 2009.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
City Council Meeting Tuesday, October 22, Background March 5, 2013: Marinship 101 to Council May 7, 2013: Council formed Steering Committee to work.
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Update for the Citizens Advisory Committee February 22, 2017
Status Report PEIR for Discretionary Well Permitting and Management Program, Stanislaus County, CA May 31, 2017.
Cost of Service Analysis & Rate Design
Overall Project RAG Status:
Vermillion River Greenway - Hastings MASTER PLAN
Harbour Island Force Main Replacement
SP TH 169 Redefine Informational Meeting July 25, 2019
Presentation transcript:

Available at: hwy53relocation/sco ping.html hwy53relocation/sco ping.html  Public Libraries in Eveleth, Gilbert, Mountain Iron, Virginia, and Duluth  MnDOT – District 1 Offices in Duluth and Virginia

 Phase 1 survey complete - 6,332 respondents  Phase 2 survey complete – 76 respondents  Record numbers of returns  Analysis in progress  Study Report will summarize findings  Meeting scheduled for September 17 to release findings.

Cliffs evaluating alignment and Air Quality Alignment may shift slightly Need bathymetric survey! E-1A Analysis

Updated Drilling Plan 5

Two rigs – 24/7  One in pit on barge  Second on the west side of the pit Initial borings along E-1A in pit  Mostly backfill and rock  Minimal amount of formation (no value) at bottom East side – Landfill road – no resources E – high grade resources west side – high value ore  Lower grades toward pit Drilling Results

Vermillion Gold holds leases for gold in Section 16 (School Trust land) August 28 meeting – requested drilling for gold exploration  500’ depth at an angle – 750’ drilling (scissor style)  Cost is $44/ft  Sample and test every 5’  Assay at a cost of $40-50/hole Use Canadian Institute of Mining standards Need to decide today due to barge in pit being done. Gold Lease Drilling

P6 Schedule  255 negative float  Cultural Resources and R/W on critical path Project Delivery Workshop – October 10 Layouts/Cost Estimates Hydrogeology in Rouchleau pit  City of Virginia Water Supply  Minorca Mine pumping Ongoing Activities

Anticipated EIS Schedule Milestone TasksTarget Dates Scoping Document/Draft Scoping Decision Document February 2012 Public Scoping MeetingMarch 2012 Scoping Decision DocumentSeptember 2012 Amended Scoping Decision DocumentSeptember 2013 Draft EIS and Public HearingSpring 2014 Identification of Preferred AlternativeSpring/Summer 2014 Final EISWinter 2014 FHWA Record of DecisionSpring 2015 MnDOT Adequacy DeterminationSpring 2015