Scoping Study Process  Survey of mines currently using gas drainage and/or Outburst Management Plans  Outburst Research Needs Workshop attended by 20.

Slides:



Advertisements
Similar presentations
Systems Managers Forum Comments from Systems Survey November 2004 Compiled by Liz Barton.
Advertisements

Gender and Safe Motherhood
Accident and Incident Investigation
Water Purification with Complete Remote Monitoring System.
YOUR ROLE IN REALISING THE AUSTRALIAN CHARTER OF HEALTHCARE RIGHTS A TRAINING GUIDE FOR HEALTHCARE PROFESSIONALS.
Standard 6: Clinical Handover
TOTAL MINING MANAGEMENT SERVICES Front Line Supervisor ACARP Presentation PO Box 1225 Newcastle NSW 2300 Phone Fax
Manchester Occupational Health & Safety Group Noise as a Health & Safety Issue in Cash in Transit Vehicles Dave Y Marsden, MSc, MIOSH, MCMI Regional Services.
Geothermal Energy Technology and International Development Forum ThermaSource, Inc.: A Drilling Point of View Louis Capuano, Jr Chief Executive Officer.
Outburst Research Needs Hanes ACARP Workshop DMR Wollongong 12 th February 2003 Ray Williams.
Environmental Management Systems An Overview With Practical Applications.
Security Controls – What Works
Dr Chris Harvey.  First reported outburst: Metropolitan Colliery; 30 th September 1895  First fatal outburst: Metropolitan Colliery; 10 th June 1896.
Outburst Workshop A new operator’s perspective Scott Langley BHP Billiton Illawarra Coal.
OUTBURST SEMINAR Work Force Perspective Management of Outburst Potential Southern District.
Quality evaluation and improvement for Internal Audit
Computer Security: Principles and Practice
Roles and Responsibilities of the Fire Officer. IFCF - MANAGEMENT 12 Management Areas Involving the Fire Officer Fiscal Management –Economic aspect of.
Monitoring Requirements Virginia Department of Health Summer Food Service Program (SFSP) 2014.
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
Research Update Automated Bolting and Meshing Project.
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
ROADWAY DEVELOPMENT IMPROVEMENT PROJECT
Dear User, This presentation has been designed for you by the Hearts and Minds Support Team It provides a guideline for conducting a Seeing Yourself As.
Dear User, This presentation has been designed for you by the Hearts and Minds Support Team. It provides a template for presenting the results of the SAFE.
DEMT Seminar and Final Meeting DEMT Activities in Cambodia Heng Kunleang Deputy Director Energy Development Department Ministry of Industry, Mines and.
The New CQC Inspection Regime
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
INTOSAI Public Debt Working Group Updating of the Strategic Plan Richard Domingue Office of the Auditor General of Canada June 14, 2010.
Chapter 1 Introduction to the Help Desk Introduction to Help Desk Concepts & Skills Mike Meyers’ Computer Skills.
III Hemispheric Workshop on Occupational Health and Safety. Cuzco, Peru. Occupational Health and Safety Self- management and Strengthening Consultation.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
Technologies and Equipment to Control and Improve UNDERGROUND MINE SAFETY Lunagas Pty Limited Beijing, CHINA, Beijing, CHINA, April 2004 Les Lunarzewski.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
May 2010 Berlin Patient perspectives Alison Bowes University of Stirling.
Copyright © 2010 Pearson Education, Inc. Leadership in Organizations publishing as Prentice Hall 4-1 Chapter 4 Participative Leadership, Delegation, and.
October  The Economic and Social Council (ESC) is “the civil parliament” of Bulgaria. It unites a variety of Bulgarian civil society organisations.
IT Technical Support 1. Introduction Technical support personnel offer support for individual and organizations in a variety of ways. This module focuses.
A Review of the Standing Committee of Caribbean Statisticians (SCCS) as a Mechanism for Statistical Development and Harmonisation The Second Meeting of.
Electrical Remote Control Working Group Progress Status As at June 2000.
PPA 502 – Program Evaluation Lecture 2c – Process Evaluation.
SURVEILLANCE & OPTIMIZATION PROCESSES ASME/API GAS LIFT WORKSHOP ASME/API Gas Lift Workshop ExxonMobil Production Organization U. S. West Artificial Lift.
D1.HRD.CL9.06 D1.HHR.CL8.07 D2.TRD.CL8.09 Slide 1.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
The Peer Review Process Presented by: Alan Ash, City Auditor Gainesville, FL Region Coordinator for N.A.L.G.A. Peer Reviews Florida West Coast Chapter.
Hazard Management Plans Moura Mine’s Highwall Mining Approach.
Campus Representative Activities that Promote Engagement and Active Participation in ASEE North Dakota State University June 2007 Charles McIntyre.
Data Report July Collect and analyze RtI data Determine effectiveness of RtI in South Dakota in Guide.
WELDINGH_DK_AUTHOR_6.2_12 Barcelona May Impact of the Deregulation on the Safety H. Weldingh –DEFU I.R. Ludvigsen –The Danish Electricity.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
Copyright © 2010 Pearson Education, Inc. Leadership in Organizations 5-1 Chapter 5 Participative Leadership, Delegation, and Empowerment.
Feb , Gas-Lift Workshop1 Gas-Lift Diagnostics Breakout Session 20 Participants: 13-Oil Producers, 7–Consultants & Manufacturers Session.
Performance Evaluation
Southern Coal Fields Outburst Seminar
Russell Thomas Gas Drainage Coordinator – Appin Colliery November 2014
Experience with Mining through Surface to Seam Large Diameter Boreholes. 26/11/14 Scott Dennis – Appin Mine.
Grunching Through Potential Outburst Zones Jack Borg – Tahmoor Underground Colliery.
Welcoming, caring, respectful, and safe learning and working environments and student code of conduct A presentation for EIPS leadership, COSC, EIPS staff,
PharmacoVigilance: Development of PhV systems and processes VICH Workshop, Dar Es Salaam, Tanzania, 24 June 2015.
Safety Leadership Defining a World Class Safety and Health Program – An Industry Perspective* *Special thanks to GE Global Nuclear Fuels – for the use.
Chapter 29 Conducting Market Research. Objectives  Explain the steps in designing and conducting market research  Compare primary and secondary data.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Computer Security: Principles and Practice First Edition by William Stallings and Lawrie Brown Lecture slides by Lawrie Brown Chapter 17 – IT Security.
Claims Leakage Control
CONDITIONS OF SERVICE AS DEEMED IMPORTANT TO PERMANENT STAFF MEMBERS
The role of the Designated Safeguarding Lead (DSL)
Outburst Threshold Limits Current Research Outcomes
Roles and Responsibilities of an External Examiner
Daughter Groundwater Directive
ACARP Project C16022 undergroundcoal.com.au
Presentation transcript:

Scoping Study Process  Survey of mines currently using gas drainage and/or Outburst Management Plans  Outburst Research Needs Workshop attended by 20 invited operations leaders, regulators and researchers, and  Discussions with experienced individuals.  Survey of mines, technical staff, researchers, consultants and government personnel regarding their perceptions of the needs for research, development and application,

Most Australian mines successfully drain gas to below the threshold limits for safe mining. Approximately 370,000 m of drainage holes drilled per year at a cost of around $37M. Where drainage is not successful, grunching or other means of mining has to be conducted adding say an extra $10M per year. Outburst avoidance by the Australian coal industry is expensive, effective but not very cost efficient. THE COST OF OB MANAGEMENT

OB Management Basis Gas content is the basis for management There is an abundance of gas content data There is a serious lack of other data Current outburst management is based on only one parameter - gas content. This is poor science.

OBMP FAILURES In recent years, 5 outbursts have been recorded. 4 occurred as failures of the OBMP’s 2 unexpected on a longwall face at West Cliff, 1 on a dyke at Appin, 1 on faulting at Central and 1 controlled OB on remotely mined face at Tower.

OB RESEARCH NEEDS 1 Review and specify the outburst mechanism and the roles of the various parameters. The parameters must be practically measurable. Once the researchers have defined the OB mechanism, it will have to be communicated to all players.

OB RESEARCH NEEDS 2 Understand the (structural) conditions which cause zones of poor drainability or drillability and which therefore, increase outburst proness, and to confidently locate these zones with adequate response time.

OB RESEARCH NEEDS 3 Develop and apply tools (methods) to rapidly, efficiently, and preferably economically reduce gas content/pressure as a routine and as a last resort.

Seminars/Workshops Technical staff at the mines also place a high priority on the need for: Continuing gas and outburst seminars, A web site with Papers on gas and outbursts and A forum for active discussion and debate and refinement of procedures.

ACARP GAS/DRILLING RESEARCH $

To Improve the Reliability of Structure Detection Use automated drill rig monitoring on each drill rig Use a monitored rotary drill Support a trial of the Sigra torque/thrust tool Trial the CSIRO dielectric tool Trial the Lunagas/AMT drill fluid logging system Trial the Sigra bore pressurisation system/sampler Instal piezometers or packers to demonstrate that gas pressure gradients are benign.

Ownership Longer term goals can only be achieved if mines take ownership of the necessary R&D and conduct their own investigations and measurements of gas and outburst parameters. ACARP, researchers and service providers can assist, but active and enthusiastic mine site support is required as is mine site innovation.

Who Has the Time? Lack of time to think, analyse etc surely is a symptom of one of the prime problems facing OB management and other aspects of mining. If personnel lack the time, encouragement or resources to fully analyse problems, including collecting appropriate data, they will act on instinct or gut feelings and this can be fatal in respect to outbursts.

Outburst Aftermath

500 tonnes + 2 young men

Comments by Alan Fisher to June 2003 OB Seminar