Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 G4 Design.

Slides:



Advertisements
Similar presentations
PHYSICS 1401 JEFFERY DING ALAN JONES
Advertisements

Project Scheduling for Load Testing Bridges for ENCE 667 Course Project Spring 2001 Justin Myers.
 Each student has a file in their folder that will help guide the project. The file contains a rubric that explains how it will be graded. The project.
By : Prof.Dr.\Nabil Mahmoud
The Effect of Bridge Design on Weight Bearing Capacity
TODAY ADD LEGO rubric to end of your lab write-up for LEGO NXT
POWERPOINT PRESENTATION
Popsicle Bridges. The Challenge Attention aspiring engineers! The state of Michigan needs your help. The Mackinaw Bridge is beginning to deteriorate and.
Chapter 5 Fatigue.
Bridge Report By Jenny. Gina. Eunji. Matt Team 5.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
Bridge Design Report Jeremy Hennings Matt Kilmer Tim Williams Nina Mairena.
 Dennis H. Mahan Memorial Bridge  Project ID: 00055A-  Iteration #32 (Thu, 7 Feb 2013, 10:42:45)  Type of CostItemCost CalculationCost  Material.
Much of the material from: COL Stephen Ressler, P.E., Ph.D.
There are many types of bridges including:
Fatigue in Concrete Structures Raquib Ahsan, Ph.D. Professor Department of Civil Engineering BUET.
A Bridge Too Plain To Be Original
Spaghetti Bridges The Pasta Sensations! Take a look at some designs…….
Bridge Design and Construction
Critical Thinking in Engineering Process
Group N Chris Jones Ella Feekins Nikoline Hong
Bridge Project Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials.
Introduction of Open Web Steel Joist, Deck and Composite Steel Joist
Elevated Bridge Building New York State Coaches Clinic October th 2009 Fishkill, New York.
World’s Tallest Tower Case Study #1 Northern Highlands Regional High School Applied Technology Department Real World Engineering List Design/Build Engineering.
Bridging the Gap: Building Bridges 101, It Is Time to Get To Work
BRIDGE BASICS THERE ARE THREE MAIN TYPES OF BRIDGES: BEAM BRIDGE
I. Truss Bridge Gussets Background
Open the software and click “close” after reading the tip. The screen below will come up. You may want to load a sample bridge design for starters. You.
ME31B: CHAPTERTHREE INTRODUCTION TO STRUCTURAL DESIGN.
Tom Canfield Engineering Technologies and Design POE Medina County Career Center 1/3/2011.
BRIDGE BREAKDOWN: EVALUATING THE ARCOLA BRIDGE ANNA GEORGE GRADE 12 METHACTON HIGH SCHOOL 3 RD YEAR AT PJAS.
ENGR 211 Bridge Design Project
Introduction to Towers. What is a tower? A man-made structure, higher than its diameter, generally used for observation, storage, or electronic transmission.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Armadillo.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 The Bleeding.
Structures What things do I need to find out in order to predict if what I design will stand up to the use I intend to put it through?
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Money.
Structural Loads.
+ Structural engineering and How to reinforce the design of a structure to hold more weight Spring Technical English Program Санкт-Петербург, Рассия.
Engineering Structures
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section Girls 1.
BRIDGES CAD 449. Design It is the essence of engineering! “… the process of devising a system, component or process to meet desired needs. It is a decision-making.
8 th Grade Applied Technology Mr. Giannone. In this unit we will study structures and the forces that affect them.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design: EDGSN 100 Section 002 Team Ultra-Truss.
Replacement of Vehicle Bridge over Spring Creek
CIVI 6061-Strengthening of bridges using FRP
Posting Bridges for Specialized Single-Unit Trucks
Replacement of Vehicle Bridge over Spring Creek
Design Project #1 Prof. Berezniak Presented to: Spring 2017
Replacement of Vehicle Bridge over Spring Creek
Advisor: Dr. Bilal El Ariss
Replacement of Vehicle Bridge over Spring Creek Centre County, PA
Replacement of Vehicle Bridge over Spring Creek
Tim Wyckoff David Cenidoza Sachin Narvekar Felix Liu Weston Wells
Ben, Jonathan, Mason, Kambriea Design Team 1
Replacement of Vehicle Bridge over Spring Creek
POPSICLE STICK BRIDGE PROJECT
Stick Together & Civil Structures
Replacement of Vechicle Bridge over Spring Creek Centre County, PA
Rafael Moran San Diego State University MSP
Bridge Project: Team Truss-Arch
Introduction to Engineering Design
Bridge Report Team Total Domination. Bridge Report Team Total Domination.
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials. Bridge Project.
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
Presentation transcript:

Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 G4 Design Team 4 Will Peterson Cierra Lawrence Fuyang Zou Zhou Xiaxuan Presented to: Prof. Berezniak Fall 2015

Statement of Problem A vital bridge located in Pennsylvania Department of Transportation (PennDOT) Engineering District 2-0 for vehicle access to the Mount Nittany Medical Center located in State College, PA has been completely destroyed by a recent 100-year flood event. All traffic now must be re- route more than 10 miles around the destroyed bridge. State College’s traffic flow, local commerce, as well as residential safety have been influenced. 2

Objective To design a replacement vehicle bridge over Spring Creek as an emergency project. 3

Design Criteria PennDOT established design criteria for the bridge to include (for both Warren through truss bridge and Howe through truss bridge): standard abutments, no piers (one span), deck material shall be medium strength concrete (0.23 meters thick), no cable anchorages and designed for the load of two AASHTO H20-44 trucks (225kN) with one in each traffic lane. The bridge deck elevation shall be set at 20 meters and the deck span shall be exactly 40 meters. Steel member type, steel cross section type, and steel member size can be selected by the design team. 4

Technical Approach Phase 1: Economic Efficiency Economic efficiency can be determined by Engineering Encounters Bridge Design 2015 (EEBD 2015) software based on the requirements, constraints, and performance criteria specified herein. While the bridge can support the dead load (its own weight) and the live load (weight of a standard truck loading), the cost needs to be as low as possible. 5

Technical Approach Phase 2: Structural Efficiency A prototype bridge shall be designed and built for both Warren through truss bridge and Howe through truss bridge. Each prototype bridge is required to accomplish load test for the catastrophic failure in the lab. Structural efficiency (SE) is calculated by the load of bridge support at failure divided by the weight of the prototype bridge. The prototype bridges are constructed using standard (4-1/2 x 3/8 x 1/12 inch) wooden (white birch) Popsicle (craft) sticks, Elmer’s white glue, and hot glue (only to attach beams between the two adjacent truss sections). For each bridge, a maximum of 60 Popsicle sticks is allowed to be used. All of the prototype bridges are accurately weighed prior to the loading test. The load at failure is measured and recorded in order to be analyzed later. A forensic engineering investigation to determine the cause of bridge failure including why did it fail; where did it fail; and how did it fail is performed by the design team for each bridge. The location of failure is determined by the structural members and joints labeled prior to the load test. 6

Results Phase 1: Economic Efficiency The cost of Howe Truss Bridge is $289, while the cost of Warren Truss Bridge is $272,664.59; the cost of Howe Truss Bridge is slightly more expensive than the Warren Truss Bridge. 7

Results Phase 2: Structural Efficiency According to the load test in the lab, the load at failure of Howe Truss Bridge is 65.4, and the structural efficiency is However, the load at failure of Warren Truss Bridge is 38.2, and the structural efficiency is Apparently the structural efficiency of Howe Truss Bridge is much higher than the structural efficiency of Warren Truss Bridge. 8

Best Solution Comparing and contrasting the economic efficiency and structural efficiency of Howe Truss Bridge and Warren Truss Bridge, the best solution of the problem is to build a Howe Truss Bridge. The reasons are as follows: 1. Even though the total cost of Warren Truss Bridge is lower than the total cost of Howe Truss Bridge, but the difference of cost is only $17, Considering other factors such as Structural Efficiency, a slightly higher cost would not be a problem. 2. The Structural Efficiency of Howe Truss Bridge is 378.0, while the mean of Structural Efficiency of all eight teams is 370, which means it is above average. The maximum Howe Structural Efficiency is 570, the minimum is 238, and the range is 332 (Table 7). However, the Structural Efficiency of Warren Truss Bridge is 228.7, while the mean of Structural Efficiency of all eight team is 358, which is 100 less than the average value. The maximum Warren Structural Efficiency is 581, the minimum is 201, and the range is 358 (Table 8). Since the difference between economic efficiencies is much smaller than the difference between structural efficiencies, Howe Truss Bridge is the best solution. 9

Conclusions Based on both the economic efficiency factor and structural factor, a Howe Truss Bridge shall be built to replace the bridge destroyed by the recent extreme flood event 10

Recommendations Some suggestions to advance the project include: making the structure to by asymmetric, as a result the bridge would be more stable; strengthen the solid bar and hollow tube on the sides of the bridge which would significantly increase the strength of the bridge 11