Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

LR Summary and LQ Plan Jesse Schmalzle w/ contributions from: J. Muratore (BNL) P. Ferracin (LBNL) October 18, 2007.
Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.
Ladybugs spending the Winter on the brake hub and inside the wheel rim.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
ATLAS End-Cap C Proposed Transport Box P Cooke 15 June 2005.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
SQXF Shell & Yoke Assembly Procedure
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
How To De-Wing A Weedhopper By: Mike Schweim. Remove wing ribs, starting from the wingtips;
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
Tools you will need #8 Torx driver #10 Torx driver Standard Phillips screwdriver Small (jewelers)Phillips screwdriver Small standard screwdriver.
The analysis runs in the following slides are based on a W8 x 58.0 wide beam with dimensions shown bellow.
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
1 MOMENTUM 3800 RC ASSEMBLY INSTRUCTIONS PART NUMBER
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
1 2 Remove side trim panel Pop out plug Remove recline lever Unplug power seat Remove side trim panel.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Baby-MIND Modules & Services
ProtoDUNE – DSS Installation, Alignment and QA
TQS Structure Design and Modeling
Support structure and target pre-stress
826YD 21/2”-10”.
Endcap shielding senarios:
Installation step 4. (3 days)
FRESCA2 Update on the dipole design and new calculations
Discussion session on day 1
MQXF updates P. Ferracin October 9th, 2014.
Mounting a BalanceBox®650 to a brick wall
המחשב הנייד ערך והכין: אלי סומר.
007DCDA 2”.
Caring Hands Cocoon Page 1 of 5 15” cocoon 2” test square 13” cocoon
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
850 (LF) ½”- 2”.
Bottom view of top of cage 1 - mark on other cage half explains which half we’re looking at 2 - Dents travel along a line of latitude of the ball spin,
WASP Science CCD Assembly Fixture No Guiders
3000B 2”.
C400, C400N, C400Z 21/2”-10”.
M400, M400N, M400Z 21/2”-10”.
Step 1:Disassemble battery case
007DCDA 2”.
3000B 2”.
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Presentation transcript:

Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009

Outline Procedure Coil-pack assembly with dummy-practice coils Next steps 07/28/2009 Paolo Ferracin2

After bladder operation Slide out the coil pack Unbolt the top-side pad screws Remove top pad Partially open (tilt) side pads Remove top dummy coils (by hand) Leave bottom dummy coils resting on bottom pad 07/28/2009 Paolo Ferracin3

Inner strong back Attach inner strong back to coil #5 Attach inner strong back to coil #6 Lift inner strong back with coil #5 and coil #6 07/28/2009 Paolo Ferracin4

Rotation Place rotating wheels Rotate inner strong back with coil #5 and coil #6 Secure inner strong back with coil #5 and coil #6 in upside-down position Remove top half of rotating wheels, so that the outer strong back can be bolted 07/28/2009 Paolo Ferracin5

Outer strong back Attach outer strong back to coil #5 and coil #6 Unbolt inner strong back Lift outer strong back with coil #5 and coil #6 07/28/2009 Paolo Ferracin6

Coil-pack Place outer strong back with coil #5 and coil #6 on top of dummy coils – Use a coil bore alignment donuts at the ends Place side pads 07/28/2009 Paolo Ferracin7

LQSD coil-pack disassembly 07/28/2009 Paolo Ferracin8

Load test of coil lifting beams 07/28/2009 Paolo Ferracin9

Bolting of inner lifting beam to first practice coil 07/28/2009 Paolo Ferracin10

Bolting of inner lifting beam to first practice coil 07/28/2009 Paolo Ferracin11

Lifting of first practice coil 07/28/2009 Paolo Ferracin12

Bolting of inner lifting beam to second practice coil 07/28/2009 Paolo Ferracin13

Lifting of both practice coils with inner lifting beam 07/28/2009 Paolo Ferracin14

Rotation of both practice coils 07/28/2009 Paolo Ferracin15

Bolting of outer lifting beam to both practice coils 07/28/2009 Paolo Ferracin16

Unbolting of inner lifting beam and lifting of both practice coils 07/28/2009 Paolo Ferracin17

Placing practice coils on top of dummy coils 07/28/2009 Paolo Ferracin18

Removing outer lifting beam 07/28/2009 Paolo Ferracin19

Coil-pack practice assembly 07/28/2009 Paolo Ferracin20

Next steps Secure the leads to the lifting beams Fabricate support brackets Fabricate new donuts 07/28/2009 Paolo Ferracin21