FESS - OPS SHUTDOWN UPDATE. ELECTRICAL Feeder 46A Cable tie in - COMP. A0,C0, E0 CRYO Transformers & Switchgear - Not Complete Master Substation - COMP.

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks.
Substation L1/ MCC L1 Update March 21 st, Current Location.
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
Total HVAC Control from anywhere Easy control that can save a fortune
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
FoamPro 1600 Series Fully automatic Class A foam ONLY
Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Power Status Thomas Nehring Conventional Facilities Advisory Committee Review October 5-6, 2010.
1B-1 Fire Engine Maintenance Unit 1B – Pump Inspections and Maintenance.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Electrical & High Temperature Utility Distribution Upgrade.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
Section 703 Apparatus Inspection. Procedures The driver/operator should follow a systematic procedure for inspecting apparatus This ensures that all important.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini TE-EPC TEEPC.
May 06, 2013 Photo by Greg Vogel. Thursday, April 18, some tunnel work had to be suspended and many planned jobs had to be postponed due to the flooding.
PowerIT Air Insulated Cubicle Uniswitch
Utility Engineers, PC.  Generation  Transmission  Distribution.
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
March 4, 2013 Photo by Martin Murphy. Shutdown 2012 Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning.
N FAB Entry 1 Entry 2 Entry 3 #3 (Intake) Check Curtain Caved Tight #2 (Intake) #1 (exhaust) Bear E. Bill E. Continuous Miner T-4 Haul Truck W/bed up On.
FESS/Ops Shut Down Summary Week Ending 9/7/12. – FESS needs a CUB Cooling Outage for installation of Barriers in the CUB Chiller 4160 Volt Starter Cabinet.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
March 7 th Shutdown Shutdown Begins: Monday morning, March 7 th :00 Beam OFF Safety System Testing 08:00 Rack out KRSS, switch MI house power to.
FESS/Ops Week Ending 1/20/13. CUB Status – Boiler #1 ON LINE CB Kramer due in to Wire in second recirculating Pump and install NFPA 70E mitigations –
FESS/Ops Shutdown Summary Nov 9 th, CUB Status – Boiler #1 ON Primary Recirculating Pump repaired Second Belly Pump to be Wired – Boiler #2 OFF.
7 A/C System Components, Operation, and Service.
FESS/Ops Shutdown Summary Week Ending 3Aug12. CUB Shut-Down Activities Shut Down Plant on July 21 hrs. Electrical – High Voltage Air Switch/Fuse.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
This talk is not a summary of costs for conventional facilities This talk is Review of conventional facilities used by CDF Discussion of status of systems.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Friday 5/1/ meeting. I wish to lock in the power outage onTuesday 5/5/09 at the end of the 0930 lab scheduling meeting speak now or :
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
S A Griffiths CM42 June 2015 Electrical & Control.
About us: We have many residential and commercial customers, we provide them complete sales, services and installation services with premium quality of.
HVAC Replacement Case Study
Automotive Heating And Air Conditioning
CUB Outage Schedule April 21, 2006.
1.3-GHz Cavity Vacuum Furnace at IB4
NuMI - Shutdown – Week 9 Horn 2 Repair – Successfully Tested the Repaired RAW Leak Drained and Refilled Horn 1 and 2 RAW Systems Changed Horn 2 DI Bottle.
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Presentation transcript:

FESS - OPS SHUTDOWN UPDATE

ELECTRICAL Feeder 46A Cable tie in - COMP. A0,C0, E0 CRYO Transformers & Switchgear - Not Complete Master Substation - COMP Kautz Road Substation - OFF - Buss Duct Maintenance Continues Feeder 24 Pbar - COMP ODH Fan Repairs – 75 % - COMP Feeder 44 Partial Outage - COMP “Wilson Hall in October” Sat. 8/7 Feeder 49 CDF- B0 & D0 - OFF 10 Hours FCC on Generator Sump Pumps & ODH Fans - on going Casey’s Pond Village/FDR 35 XFER Switch - installed Lighting Arrestors

MECHANICAL Sump Pump SY ENC “C” - Piping repaired - comp Sump Pump - AO10,waiting on stair cart AP0TH - Evaluating a Safe way to remove pump. Exhaust Fan AP0TH - Next week TEV Pond Pumps “repack” - 50 % COMP Booster Sump Pump – COMP

HVAC MI – Repair DesertAire - COMP BOOSTER – Economizer on B288 - COMP MI – Revisit MarvAires - in construction areas before end of shutdown Linac Pre Acc EDPac unit – COMP MI65 Multistack Chiller Cleaned & Reassembled – Need to Load Test AP-0 Split Systems – WIP MINIBOONE Split System (New Liebert) – COMP MI31 Marvairs & Chiller – COMP MI31 TRANE Economizer Repairs - COMP

OP’S ENGINEERING Booster East/West Dual Temp Piping – COMP Booster Sump Pump Discharge Upgrade - COMP X-Gallery Mechanical Room Piping - COMP CUB HE2 Valve CUB - COMP PIV13 Replacement – Valve Replaced - COMP Cathodic MESON Beamline Upgrade - COMP Tev Ring Silt Mitigation – 12 intake boxes cleaned out ~24” deep - COMP - No 0 Buildings have been done

CUB CUB Shutdown – COMP & Back on line Chiller Epoxy coatings – COMP – Chiller Reassembly WIP Chiller #5 control transformer Repair (4160 V outage) Additional outage request on Tuesday Process Chiller Water Flow Sensor – Cleaned

CASEY’S POND Sump Inspection & Zebra Mussel Evaluation – COMP Intake Piping Inspection & Zebra Mussel Evaluation - WIP

FINDINGS High Silt levels at the suction boxes Zebra Mussels found in simplex basket strainers and Intake Screens in TEV Ring Last week two unexpected power outages 5700 LBS of Zebra Mussels removed from Casey’s Pond Sump – Looking for market maybe with the Asian Carp

PIV 13 Stuck in this position for years

Diver Dan

Delivery Truck

De-watering Process

Ready For Market

Silt Removal