LLRF 15 Daresbury Andrew Moss ASTeC, STFC Daresbury Laboratory.

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Synchronization system for CLIC crab cavities Amos Dexter, Ben Woolley, Igor Syratchev. LCWS12, UTA October 2012.
Particle Accelerator Engineering, London, October 2014 Phase Synchronisation Systems Dr A.C. Dexter Overview Accelerator Synchronisation Examples Categories.
RF controls for MICE Andrew Moss Sept 06. What we need A flexible easy to use solution to control the amplitude, phase and timing of the MICE RF amplifiers.
RF Synchronisation Issues
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
DESY MHF-p 1 Layout of the Synchronisation System for the VUV-FEL Dipl. Ing. Henning Christof Weddig DESY Hamburg.
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
RF Synchronization Activity at SPARC A.Gallo and D. Alesini, M. Bellaveglia, R. Boni, G. Di Pirro, A. Drago, A.Ghigo P. Baldini, L. Cacciotti, M. Scampati,
LLRF System for Pulsed Linacs (modeling, simulation, design and implementation) Hooman Hassanzadegan ESS, Beam Instrumentation Group 1.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
Grzegorz Jablonski, Technical University of Lodz, Department of Microelectronics and Computer Science XFEL-LLRF-ATCA Meeting, 3-4 December 2007 XFEL The.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
LLRF for EUCARD Crab Cavities Graeme Burt (on behalf of Amos Dexter) Paris May 2011.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
WELCOME TO IHEP. RF Phase Control for BEPCII Linac Accelerator Wenchun Gao.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
Commissioning and Utilisation of ERLP David Holder ASTeC, Daresbury Laboratory.
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
ALBA RF Systems Francis Perez.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
Andrew Moss STFC, ASTeC Example amplifier control system Example of current STFC copper cavity in operation –Using SF6 insulated waveguide –Conditioning.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
Design of a direct conversion 200 MHz non-IQ scheme using the Dimtel LLRF4 card Bob Anderson.
Digital LLRF plans at the Australian Synchrotron P.Corlett, K.Zingre, G. LeBlanc Australian Synchrotron, 800 Blackburn Road, Clayton 3168, Victoria, Australia.
LLRF for PXIE Brian Chase For the Project X LLRF Collaboration 1 PX Collaboration Meeting, April 2012 Berkeley - B. Chase.
ESS LLRF and Beam Interaction
Test of the dressed spoke cavity
UK FEL development package WP6:
UK X FEL Kick-off Meeting
UK-XFEL WP1 – Electron Injector Development
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Progress on the MICE LLRF System
An X-band system for phase space linearisation on CLARA
ILC LLRF Status Ruben Carcagno, Brian Chase
Timing and synchronization at SPARC
RF Synchronisation Issues
WP02 PRR: Master Oscillator and RF Reference Distribution
CEPC RF Power Sources System
Low Level RF Status Outline LLRF controls system overview
Low Level RF Status Outline LLRF controls system overview
LCLS RF Stability Requirements
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Coherent Light Source (LCLS) Low Level RF Status
Operational Experience with LCLS RF systems
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
RF introduction Anders Sunesson RF group leader
Presentation transcript:

LLRF 15 Daresbury Andrew Moss ASTeC, STFC Daresbury Laboratory

 Description of why and how we started  Early test results and methods  Specific LLRF installations on ALICE and VELA  EMMA commercial LLRF  CLARA LLRF  Recent developments Contents

 The original ALICE energy recovery linac used FZR Rossendorf analog LLRF cards based on Op Amps and mixers  Very fast operation and still in use on the ALICE booster  Limited by being inside the accelerator hall with no possibility to adjust parameters quickly- changes to capacitor and resistor values to tune loop response  During 2009 the group took part on an USPAS course on LLRF and experienced Digital LLRF working as part of the hands on work  We recognised the need for the cavity control to be able to adapt quickly, to use feedback and feed-forward to compensate for beam loading and to be able to remove/measure environmental effects  We already had a number of digital boards including the LLRF4 and so work concentrated on this on our return  All of our work so far has used connectorised components – off board mixers  We very quickly found that temperature changes were to be avoided at all costs to get a stable system Our beginning

Initial tests Slow phase loop to lock FPGA to master oscillator 1.3GHz During 2011 tests made using developed software and LLRF4 board on ALICE Buncher NC 1.3GHz cavity Analog card response to beam in buncher cavity – notice phase error is not eliminated Digital system response to beam in Buncher cavity with feedback and with feedback and feed forward 84uS beam at 40 pC Cavity probe response in comparison with MO using Hittite phase detector Hittite phase detector HMC439QS16G

Daresbury LLRF Conversion to/from IF of 50MHz via connectorised components Temperature regulation to improve stability EPICS interface to control LLRF4 card Open loop Calibration mode Closed loop Closed loop with ramped fill P & I constants, amplitude and phase Software programs Self excited loop Feedback/feedforward Ramped filling mode to reduce high peak power Control over overshoot and filling time for SCRF cavities

ALICE ERL with FEL Installation of digital LLRF on Buncher cavity in 2012 – 1.3GHz 2kW solid state amplifier Phase rms error : degrees; amplitude rms error: 0.05%. Measured by a Hittite phase detector and Boonton power meter Test during 2014 on 1.3GHz SCRF booster showing ramped fill mode to reduce waveguide arc trips Stability was comparable with the figures above for operation with the Buncher RF system is at 1.3GHz and is pulsed at 2.5mSec 10Hz Peak power during beam loading Booster and Linac are Tesla type SCRF structures FEL

 During January 2015 digital LLRF was installed on both Linac cavities  LLRF systems share a common reference and clock system  1.3GHz master oscillator used by LLRF, preforms DDC to get reference phase, frequency control of VCO clock and LO to lock FPGA to MO ALICE LINAC Linac 1 Linac 2 MO

 Machine began a 3 month user run in Feb 2015 with digital LLRF installed  Physicist’s find the systems more stable and using ramped filling has removed waveguide arc trips  Energy recovery display (reduction in forward power during the beam on pulse)is harder to see however and a more user friendly LLRF screen is needed  Overall the performance of the machine is better and more reliable with increased FEL performance ALICE results

LLRF 4 MO RF systemLaser system FEL 1.3GHz 81MHz 1.3GHz CLK Photodiode ADC channels FEL stability has been an issue on ALICE, both fast changes and slow drifts LLRF 4 card was used to diagnose problem LLRF clocked at 1.3GHz and measure 81MHz I&Q of laser drive signal and then laser photodiode FEL output level is directly linked to laser phase changes Solution was to install a phase shifter in front of the laser and drive it from the LLRF4 to correct for phase changes FEL stability improved from 5-10% to 1-2% with long term stability much improved Laser has been fixed for the next run but monitoring will continue ALICE FEL stability 81MHz laser signal

 S – band 2.5 cell standing wave normal conducting gun  Photo injector laser at 81MHz  10MW modulator  3uS RF pulse at 10Hz  Temperature stabilised to 0.1 degrees at 35C Versatile Electron Linear Accelerator VELA

 VELA master oscillator is MHz with laser output at 81.04Mhz  LLRF4 board used with IF at 50MHz  Local oscillator at 2.948MHz controlled by LLRF4 in FM mode  Short pulse open loop operation  Calibration system for measurement of cable drifts has been built but not implemented so far VELA LLRF RF down/up conversion chassis on heated plate Testing ideas and performance limitations for future 3GHz machines Second identical LLRF system to drive 6MW Time Deflecting Cavity

VELA phase drift The VELA machine has always suffered from a phase drift. The LLRF is locked to the MO using the DDC process so that everything is locked together Both LLRF systems indicated that the phase reference was stable over many months Experiments were performed to locate this problem AD9914 DDS in programmable modulus mode AD8302 phase detectors Using the phase detectors we could monitor the system and found during a 24 hour period that the 81MHz driving the laser was slipping at 5 degrees per hour away from the 3GHz So the LLRF was correct that the 3GHz was stable, but everything driven by 81MHz from the MO was moving Short term solution is that the laser is now driven directly from the AD9914 DDS which is stable and jitter is no worse on the electron beam VELA MO

EMMA 19 NC cavities 19 forward and reflected power signals One 100kW IOT amplifier Waveguide power splitting to each cavity Waveguide phase shifter for each cavity Ability to operate off frequency -4MHz to +1MHz around 1.3 GHz synchronised to ALICE 1.3Ghz

EMMA Non Scaling FFAG Liberia LLRF system with master/slave units to get all RF channels monitored Global vector sum control of amplitude and phase Beam loading could be seeing in LLRF which helped us to set phase of each cavity 30 minutes required to change the frequency of all cavities using the Liberia Acceleration was achieved in the machine

 S band linear accelerator FEL at up to 250MeV  Aiming for 10fS stability for experiments  LLRF will be commercial product because Daresbury LLRF team is currently rebuilding and timescales mean this is the only option  Calibration systems will be needed for long term stability  Beam diagnostics will be used to stabilise the whole facility  CLARA is a test accelerator towards the next UK FEL project CLARA

 New LLRF person has started last month  So far he has written his own code to produce a VNA application via firmware and LLRF 4 and 4.6 boards (Spartan 6 version )  Also have IOxOS Spartan 6 boards as used at Swissfel, work will begin soon on these  Using a combination of commercial LLRF and our in house developments we intend to progress towards high quality systems for CLARA  We require a phase noise analyser and would welcome any advice on the available systems Recent developments

 We have show the ability to develop our own LLRF systems with a lot of help ! Thanks to Larry Doolittle and Dmitry Teytelman  Most of the what I have presented is the work of LiLi Ma and Peter Corlett over the last 5 years  We have used commercial LLRF and understand the depth of knowledge that is included to make these products and the value for money this offers  In the future we will use both solutions depending on timescales and availability of resources because LLRF takes a huge effort and we are a very small team  All of our accelerators are primarily test facilities and developing future technology is our task, our facilities are available to external companies and laboratories Conclusion