1.CERN Hotel 2.Mobility 3.Storage 4.Hazardous waste 5.Green spaces 6.AOB 2 Contents.

Slides:



Advertisements
Similar presentations
Unit 7a Travel Arrangements
Advertisements

CERN Car Usage Dos and Donts. General Principles Overall rules can be found in Operational Circular (OC) 4:Conditions for use by members of the CERN personnel.
Report from Accommodation Facilities meeting ACCU A.Rozanov Outlook Accommodation Facilities meeting Patrick Geeraert, Chris Onions,
Service Management Status 107 th ACCU Meeting 10 March 2015.
1 Welcome to Thistle Hotel Welcome To Thistle Hotel Enter maximum price of room/night in GBP Type of room No of rooms Check in Date Check out Date Smoking.
1 Log in Hotel In Your Palm address Password Are you are looking for a place to stay in comfort? You have arrived to the right site! Thistle hotels.
Data collection on homelessness in statistical offices in France 1. National Institute of Statistics and Economic Studies (INSEE) 2. Statistical Office.
CERN IT Department CH-1211 Genève 23 Switzerland t Evolution of telecom services GTPA November 27 th 2014 IT Dept. CS group.
1. Contents I. GS Action list following the 98th meeting held on 7 December 2012 II. CERN Hotel III. LS1 i. Increased car fleet IV. Restaurant & Snack.
Mobility plan for Geneva Airport employees. Constraints and needs for the mobility of Geneva airport staff Airport staff: all employees working in the.
Graduation Project Shared Electrical Vehicle for University Campuses
Service Management Status 108 th ACCU Meeting 09 June 2015.
The Civic Recommendations: some informations Out of 42 draft recommendations, 18 showed an average value exceeding 50% of high priority. These Civic Recommendations.
CERNAccommodation Facilities (FAC) meeting A.Rozanov CERN ACCU Outlook Accommodation Facilities meetings Sigurd Lettow, Thomas Pettersson,
People First Programme Social Care & Inclusion – Adult Services.
ACCU Meeting - M. Tiirakari March GS_SEM new structure 2.Consolidation Program 3.CERN regular shuttle services 4.CERN Hostel services a.Web booking,
TAG 2012 Survey Data. Survey sent to 16, responded.
Housing Service Review Service Report 24 November 2014.
CERN TRIP (GENEVA) 2014 Parents’ Information Evening Monday, 10 th November 2014 You are very welcome. Please take your seat and we will start shortly.
U.S. LHC Users Meeting, Sept.26, 2009 ACCU Report ~ Darin Acosta 1 ACCU Report Darin Acosta (Non-member state representative)
CERNAccommodation Facilities (FAC) meeting A.Rozanov CERN ACCU Outlook Report on Accommodation Facilities meetings Sigurd Lettow, Catherine.
Slide 1 WP D Integrating Mobility Management and Land Use Planning A good example of integration: Sihlcity, Zürich, Switzerland (D2a)
M. Tiirakari 9 December2009. CERN regular shuttle services CERN Hostel services and WWW booking Miscellaneous 9 December 2009 M. Tiirakari 2 Summary.
Brisbane City Council Trial of Bike Racks on Buses Nov 2003.
Service Management Status 106 th ACCU Meeting 02 December 2014.
The car of the future!. A few questions Hands up if…
1.CERN Hotel 2.Mobility 3.Long-term parking 4.AOB 2 Contents.
1.Building 42 2.Mobility and Transport – on-going actions 3.CERN Hotel a Program of work b.Statistics c.Ongoing improvements 4.CERN Master Plan.
Accommodation Single occupancy 24-hour internet access and Wifi. Internet password and username has attached with your key.
I.GS Action List following the 94 th meeting held on 7 December 2011 II.CERN Hotel I.Program of Work II.Accommodation :Future Evolution III.Ongoing Improvements.
Effective solutions for green urban transport – Learning from CIVITAS cities 16 April 2013 Geneva Dipl. biol. Regina Lüdert, City of Stuttgart.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Report from Accommodation Facilities meeting ACCU A.Rozanov Outlook Accommodation Facilities meeting Patrick Geeraert, Chris Onions,
Users’ Office News Doris Chromek-Burckhart Head of Users Office Changes to Procedures and Forms Action item.
Users’ Office. 8.December 2015 ACCU meeting - D.Chromek-Burckhart – Users’ Office 2 Users’ Office news Web Site Recognition of Partnership Team Leader.
Departure Formalities Leaving CERN – Quitter le CERN2 Formalités de départSybille SALTER.
100 th ACCU meeting – 25 Years of ACCU Michael Hauschild - CERN - 4 June 2013, page 1 25 Years of ACCU Some historical view back in time.
Change of Mobile Telephony Operator Tony Cass ACCU, 8 th September 2015.
Service Management Status 104 th ACCU Meeting 03 June 2014.
M. Tiirakari 1 9 September CERN Hostel Service 2 As requested by ACCU and the Management -Implementation of the WWW booking -New deals with hotels.
Santander Cycle Hire Presentation by: David Eddington Cycle Hire Operations Manager Transport for London.
SMB Service Status 111 th ACCU Meeting Tuesday, 8 march 2016.
Welcome Liz Kitchener, Head of Strategic FM 12 May 2016
ACCU Report News and User Issues Darin Acosta (Non-Member State representative) U.S. LHC Users Meeting, Oct.20, 2012ACCU Report ~ Darin Acosta 1.
ACCU Meeting - M. Tiirakari June Civil engineering projects 2.Construction and work maintenance 3.HVAC and electricity 4.Design Office and Patrimony.
I.GS Action List following the 96 th meeting held on 15 June 2012 II.CERN Hotel III.Shuttle IV.Bicycle entries V.NOVAE snack service improvement VI.Parking.
1.CERN Hotel 2.Mobility 3.AOB 2 Contents B. 38 (In progress) 1.Formulate and implement a safety plan for the whole building (In progress); Replacement.
When you are on a budget trip to Singapore, the easiest way to save money is by cutting short your expenses on travel and accommodation. These are the.
INTEGRATION OF RURAL DEMAND-RESPONSIVE TRANSPORT SERVICES IN THE PUBLIC TRANSPORT CHAIN: A STRATEGIC APPROACH Centro Algoritmi / University of Minho.
Housing Service Review Service Report 1 June 2015.
SMB Service Status 113th ACCU Meeting
GS-SEM Group ACCU Meeting 10 June 2009 M. Tiirakari EDMS:
SMB Service Status 114th ACCU Meeting
89th ACCU Meeting 8th September 2010
European Library Automation Group Welcome All to the 29th ELAG Seminar
Mobility service Presentation to EN
Title of Presentation Bike Sharing System CE 635 Huang Liu.
Our Bus Service Konrad Pulé – October 2016.
José Salicio – Physics Department – User Office
Good to know about the Dormitories
Campus Safety For Parents and Families
SMB Service Status 116th ACCU Meeting
85th ACCU Meeting of 9 September 2009
SMB Service Status 112th ACCU Meeting
Handout 2: Organising business travel
SMB Service Status 118th ACCU Meeting
Call Now How to Search a Good Taxi Service in Udaipur.
Welcome to Texas January 2019 FSAN and ITU-T Q2/SG15 Meeting
Car Pooling at Tata Power
Car Pooling at Tata Power
Presentation transcript:

1.CERN Hotel 2.Mobility 3.Storage 4.Hazardous waste 5.Green spaces 6.AOB 2 Contents

B. 38 Nov May 2013; 1.Consolidation and refurbishment of the whole building forecast closure Nov May 2013; 2.Replacement of old furniture in the rooms: Dec/Jan.2012;  Office chairs and desks Dec/Jan.2012; Done  Bedside lamps (Done); Done  Telephones (Done); Dec/Jan.2012  Bedding (Dec/Jan.2012). B. 39 Dec/Jan.2012 Done 1.Renovation of the rooms: replacement of old furniture (chairs, bedding (Dec/Jan.2012);, office lamps (Done), telephones); Creation of 5 additional hotel rooms (2012); Replacement of the wall to wall carpeting in the corridors and the lounges (2013); B. 41 December Painting in the rooms (December 2011) December Coat racks (December 2011) APPARTMENTS Renewal of furniture (2013) 3 CERN Hotel program of work Building 38 will be closed between November 2012-May 2013

A. Computing related enhancements Feb Long Term waiting list [expected Feb. 2012]; 2.Booking modifications to be checked by Fidelio B. On-going deals with external hotels - Other enhancements June On-going collaboration with the “Foyer de Saint Genis”: 70 additional rooms (June 2012); 2.On going negotiations with hotels in the centre of Geneva (Manotel Hotels); Price enquiry to be launched with hotels in the local areas including shuttle service to/from CERN C. NEW services  laundry service for CERN hotel residents - Done  Washing powder provided with laundry cards- Done  Short term waiting list (via to avoid queuing at the reception desk) - Done  Prepaid telephone cards available at CERN Hotel reception (Jan. 2012) 4 CERN Hotel On-going improvements Saint Genis Foyer: price increase under negotiation - No price revision until end of 2014 requested.

5 Mobility strategy CERN CAR SHARING LAUNCH: 1 st December 2011! 1.OPENED 1.OPENED to the entire CERN community with 3 specific conditions: 1. a CERN valid contract 2. a CERN address 3. a CERN vehicle driving license (V) (EDH document); 2.Conditions governing the use of CERN car sharing: Operational Circular no.4;Operational Circular no.4 3.CARDS 3.CARDS available at GS car pool (B.130); BOOKING 4.Easy BOOKING via web application. CERN BIKE SHARING since MAY 2011 ONE STATION Building bikes 370 bike sharing users! 27’845 hours of usage 370 bike sharing users! 27’845 hours of usage 3002 bookings since May Average use: 9h15 Future stations coming! 512 RFID cards already distributed

Shuttle service a.Persons transported in 2011 b.Groups transported in 2011 IMPROVED MOBILITY, INCREASED FREQUENCY c.Since October 2011, optimization of CERN shuttle routes IMPROVED MOBILITY, INCREASED FREQUENCY d.For on demand transportation: please contact CERN service desk:  Price enquiry for taxi service to be launched If no CERN shuttle available: 2 options: - External transportation contract (Helvetie) - Credit voucher for a single journey taxi : ask your departmental /group secretariat Telephone number Taxi Phone If CERN shuttle availability: CERN shuttle (budget code)

7 Greek Mobility Survey More than answers 564 fully completed questionnaires! o Residents of France generally have a car available on a daily basis for their trips to/from CERN, regardless of the distance between CERN and their home. o 30% of both CERN Hostel residents and those living in Switzerland have no car available on a daily basis. Swiss residents for distances up to 10km use equally both private and public transport.

8 Greek Mobility Survey o Majority of TRIPS: within Zone D, then between Zone C and Zone D, and between Zone D and the Restaurant; o 50% of respondents conduct 2 to 4 trips per day within CERN; o 60% of the trips inside CERN are being conducted on foot; o Morning peak: 09:45 to 10:00, midday peak from 12:45 to 13:00 and night peak from 00:00-00:15.

9 Mobility Survey

10 Mobility Survey – Possible strategic measures

11 Mobility Survey - Possible strategic measures

12 Storage Areas Management HELP US with cleaning up of storage areas Contact: Marc Chataigneau 73865

13 Hazardous waste o Elimination of 15 PCB polluted transformers by a specialized company ; o The quality of the sorting of special waste by CERN has been heralded by the recycling company CTDS SA o Elimination of 200 containers with radioactive water/hydrocarbon from building 954 o Elimination of NAK Development of specific projects and strategies for the sorting and elimination of various types of waste on CERN sites in conformity with the professional study of BIRD SA realized together with GS-IS and based on official rules and regulations concerning waste management and traceability. Contacts: Claudia Bruggmann Perez Dominique Gyor Attila

14 CERN forests Management o Convention CERN /ONF o Works for safety and embellishment of CERN French Forests (56.43 ha)

15 Improving the gardens in and around the Main Building

Many thanks for your attention Q&A and Discussion 16