Rob Thompson, Director of Engineering April 7, 2016 Orange County Sanitation District.

Slides:



Advertisements
Similar presentations
Government Affairs Strategic Initiatives for Member Benefit and Retention 1. Industry Defense 2. Economic Stimulus (Proactive Government Affairs Strategies)
Advertisements

Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
Capital Improvement Program (CIP) Overview Jim Herberg, P.E., BCEE June 14, 2012.
Presented by: Ronald O. Nichols LADWP General Manager
“Strangled by Disposables” An Update on Flushable but Not Dispersible Products Nick J. Arhontes, P.E. Nick J. Arhontes, P.E. Director Facilities Support.
Where does the sludge go? grams per person per day Sludge handling/disposal accounts for 25-50% of the cost –Sludge treatment:- Convert organics.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Orange County Sanitation District Infrastructure Committee Update OCBC – Aug 9, 2011 Nick Arhontes, P.E. Director of Facilities Support Services Orange.
June 1, 2001 Public Workshop Orange County MS4 Permit, Urban Storm Water Runoff Management Program Order No (NPDES No. CAS ) Mark Smythe Chief,
OCSD Case Study Hydrogen from Sewage
Capital Improvement Program (CIP) Overview Nick Kanetis, P.E. June 14, 2013.
Presentation Overview
Waste Discharge Requirements (WDR) Orange County Sanitation District WDR Awareness Training Revision September 30, 2005.
The City of North Bend Sanitary Sewer System
1 Stormwater and Wastewater in Halifax Regional Municipality Presentation to Halifax Watershed Advisory Board John Sheppard, P.Eng. Manager of Environmental.
1 Nassau County NY United Water Partnership The US Conference of Mayors Mayors Water Council April 30 – May 1, 2015 Rob Walker Chief Deputy County Executive,
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Flushables Update Nick Arhontes, P.E. Director of Facilities Support Services Orange County Sanitation District, California Nick Arhontes,
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Carlsbad Desalination Plant Aerial 1. Carlsbad Desalination Project Aerial (Plant & Pipeline) 2 Desal Conveyance Pipeline 10-miles of new 54-inch pipe.
City of Rehoboth Beach Wastewater Treatment Facilities A Historical Narrative June 16, 2008 Presented by Bob Stenger, Superintendent Rehoboth Beach Wastewater.
A sustainable Santa Ana Watershed is drought-proofed, salt balanced, and supports economic and environmental vitality in the year Vision.
January 6,  INTRODUCTION  OVERVIEW OF FUNDS  SUMMARY  QUESTIONS  SUPPLEMENTAL INFORMATION ◦ Background Information and Capital Projects ◦
Public-Private Partnering for Local Market Development Orange County Sanitation District Michael D. Moore Association of Compost Producers Board Member.
Rich Haller, P.E. Program Manager, Santa Ana Watershed Project Authority (SAWPA) April 2, 2004 Brine Disposal Strategies in Inland Southern California.
San Gabriel Valley Water Forum Mike Sullivan Monitoring Section Head, Los Angeles County Sanitation Districts x2801.
SCAP Collection Systems Committee
ORANGE COUNTY BUSINESS COUNCIL Unemployment Rate Comparisons Source: California EDD Orange County’s unemployment has been under 7 percent since February.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
The Energy Network: An Integrated Approach to Delivering Energy Savings to Public Agencies.
Wisler Pierre-Louis, P.E., LEED AP BD+C, CFM, PMP Public Works Director Public Works Department.
Frederick A. Laskey Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority.
Welcome to our Open House!. We Are Our Proud of Our History Originally Family owned and operated. Established in 1969 Largest ambulance provider in the.
1 Your Utility Services: The Bottom Line Facilities Managers Meeting November 5, 2015.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Orange County Sanitation District Orange County Sanitation District Example Title Slide Example Title Slide.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
1 Department of Public Works 08/09 Capital Improvement Program City of Newport Beach.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Protecting the Lives of our Community Every single day, much of what we do goes by without much notice. Without fail, we work hard to protect the lives.
Emerging Technologies for Biosolids Management
1 CTC 450 Review WW Sludge Processes. 2 Objectives Understand the basics with respect to operation of wastewater systems.
Analysis of the 2014 Elections in Orange County Keys to Victory Union Members Communications to General Public Field Million More Voters.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
CTC 450 Review WW Sludge Processes.
Wastewater Fee Increases
Ellie Nedry Community Programs Manager Community Programs Department
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Capital Improvement Program (CIP) Overview
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Gull lake sewer + water authority
Public Hearing Sanitary Sewer Fees
Wastewater Facilities Upgrade Project
FEE INCREASES Public Work Shop June 2, 2018.
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
Delta Water Supply Project
WDR Steering Committee
Capital Improvement Plan April 9, 2018 Status Update
Draft Fiscal Year Bus Service Plan
Presentation transcript:

Rob Thompson, Director of Engineering April 7, 2016 Orange County Sanitation District

OCSD Mission To protect public health and the environment by providing effective wastewater collection, treatment, and recycling.

Who is OCSD? Regional Water Treatment/ Resource Recovery System We receive 185 mil gal/day of enriched water We make water, power, and fertilizer Orange County Pacific Ocean Ocean Pipeline Reclamation Plant No. 1 Treatment Plant No. 2 Newport Beach Fountain Valley Santa Ana Los Alamitos Buena Park Fullerton Tustin Garden Grove La Habra Brea Placentia Yorba Linda Anaheim Orange La Palma Cypress Westminster Irvine Villa Park Costa Mesa Huntington Beach Seal Beach

Wastewater Collection System City Local Sewer Manhole Private Lateral OCSD Regional Trunkline Ocean Outfall OCSD Treatment Plants Manhole To OCWD

Capital Improvement Program Overview

Background EPA Consent Decree Secondary Treatment Full Secondary December 2012 Maximizing Reclamation through OCWD Future Renewal, Replacement and Rehabilitation

Strong Financial Position Revenues from user fees and connection fees Proactive forecasting and planning AAA Bond Rating

More than $2 billion in capital will be invested over the next 10 years.

Major Projects in Design District 6 Trunk Sewer Relief Consolidated Demolition at Plant 2 Ocean Outfall System Rehabilitation Headworks Rehabilitation at Plant 1 Rehabilitation of Western Regional Sewers Seal Beach Pump Station Rehabilitation SCADA System and Network Upgrades at Plant 2 Newhope Placentia Trunk Replacement – Package B Headquarters Complex Replacement

Major Projects in Construction Digester Rehabilitation at Plant 1 Sludge Dewatering and Odor Control at Plant 1 Sludge Dewatering and Odor Control at Plant 2 Gisler Redhill Trunk Improvements Newhope Placentia Trunk Replacement – Pkg. A Trunk Line Odor Control Improvements at Plant 1 Final Effluent Sampler Upgrades at Plant 2

Upcoming Design Requests for Proposal Project Name RFP Date Construction Estimate SARI Rock Stabilizers RemovalMar-16$1,800,000 P2-98Plant No.2 Primary Treatment System Rehabilitation Mar-16$92,600,000 J-127Natural Gas Pipelines Replacement at Plant Nos. 1 and 2 Aug-16$600,000 J-126Safety Improvement at Plant Nos. 1 and 2Aug-16$800,000 J-124Digester Gas Facilities RehabilitationSep-16$51,600, Southwest Costa Mesa Trunk SewerSep-16$8,900,000

Upcoming Construction Project Bids Project Name Bid Date Construction Estimate 6-17District 6 Trunk Sewer ReliefMar-16$4,300, SARI Rock Stabilizers RemovalJul-16$1,800,000 P2-110Consolidated Demolition and Utility Improvements at Plant 2 Oct-16$26,300,000 P2-92ATruck Loading Bay Odor ControlDec-16$3,000, BNewhope-Placentia Trunk ReplacementApr-17$40,000,000 P2-107SCADA System and Network UpgradesOct-17$15,800,000

Thank You