3 February 2005, J. Lettry 1 Task #3 100 kW direct targets “Development of targets and ion sources for radionuclide production that can accommodate up.

Slides:



Advertisements
Similar presentations
Paul Scherrer Institut 5232 Villigen PSI EURISOL Kick-off meeting, L. Zanini EURISOL DS Task 4 L. Zanini PSI Kick-off Meeting CERN,
Advertisements

EURISOL DS : Status and Future Yorick Blumenfeld CERN-ISOLDE* We acknowledge the financial support of the European Community under the FP6 Research Infrastructure.
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 1. N. Souchlas BNL (Oct. 5, 2010)
Yoro TALL Santiago de Compostela (Spain) June 7 – 10, Second IP EUROTRANS Internal Training Course on Nuclear Data for Transmutation: status, needs.
EURISOL DS Progress Meeting T2-03, CEA Saclay, France 27 – 28 October, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Adonai Herrera-Martínez.
The Heavy Ion Fusion Virtual National Laboratory UC Berkeley C.S. Debonnel 1,2, S.S. Yu 2, P.F. Peterson 1 (1) Thermal Hydraulics Laboratory Department.
Nuclear Physics: Radiation, Radioactivity & its Applications.
The need for cross section measurements for neutron- induced reactions If no cross section measurement exists, alternative strategies are: The cross section.
ISOLDE contribution to task 11 8.Prediction of secondary beam intensities Pierre Delahaye for the ISOLDE collaboration EURISOL DS Task 11 kick-off meeting,
Town meeting – Helsinki – 17 th September 2007 Overview on EURISOL targets Thierry Stora on behalf of the Target Tasks.
2 nd Oxford-Princeton High-Powered Target Workshop, Y. KadiNovember 6, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of the.
EURISOL Town Meeting October 2012 – Lisbon High-Power Targets High-Power Targets Developments and Testing of Spallation Neutron Sources Yacine Kadi,
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
High-Power Density Target Design and Analyses for Accelerator Production of Isotopes W. David Pointer Argonne National Laboratory Nuclear Engineering Division.
RAL/BENE meeting, April Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg.
Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.
H. Ravn CERN High-power Targetry for Future Accelerators 7/9/ H. L. Ravn/CERN, EP High power targets for EURISOL and Beta -beams.
Initiatives in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon. OX11 0QX, UK.
Welcome to the CHARMS See – Tea Sunday, October 11, 2015 Release of Light Alkalis (Li, Na, K) From ISOLDE Targets Strahinja Lukić,
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Radioactive ion beam facilities How does they work ? 2012 Student Practice in JINR Fields of Research 9.oct.2012 I. Sivacekflerovlab.jinr.ru.
Liquid targets for isotope production Jerry Nolen Physics Division, Argonne National Laboratory NuFact'11 XIIIth Workshop on Neutrino Factories, Superbeams.
26/3/03J.E Campagne LAL Horn R&D J.E Campagne, A. Caze (Ph. D), CNGS Horn: G. Macé, S. Wallon New persons: J. Bonis, M. Omesh,… Other IN2P3 members: J.
RADIOACTIVE ION BEAMS AT B.RANNOU W.MITTIG M.G.ST LAURENT (GANIL France)
24 January 2001J. Lettry1 ISOLDE Introduction –PSB-beam, Targets –Ion-sources Facility performance –Front-ends and robots –Target production –Safety.
05/02/08 EUROnu, Elena Wildner, CERN, 05/02/ EURO Beta Beams Kick-off meeting  Elena Wildner, CERN.
The ISOLDE yield database Measured secondary beams intensities at ISOLDE Pierre Delahaye for the ISOLDE collaboration EURISOL DS Task 11 kick-off meeting,
Radioactive ion beam production at other facilities
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
SPES. 1.Develop a Neutron Rich ISOL facility delivering Radioactive Ion Beams at 10AMeV using the LNL linear accelerator ALPI as re-accelerator. 2.Make.
Your Friend, the Periodic Table What it is, how it works, and how to use it.
FP6 Design study "DIRAC secondary beams" Project "NUSTAR":Experiments with stored radioactive beams Super-FRS high-power production target has to cover.
FP6 Design study "DIRACsecondary Beams" "NUSTAR":Experiments with stored radioactive beams Goals of Task 6: Research and development to handle the energy.
F. Negoita, Bucuresti, 28 Feb Participation of NIPNE-Bucharest in SPIRAL2 Project.
Materials Integration by Fission Reactor Irradiation and Essential Basic Studies for Overall Evaluation Presented by N.Yoshida and K.Abe At the J-US Meeting,
Elisa Rapisarda, CERN, PH Division
EURISOL – Task 11 meeting 2007S. Chabod 1 OUR CONTRIBUTION INSIDE EURISOL TASK 11 OPTIMIZATION OF IN-TARGET NUCLEI YIELDS Target parameters: material (Al.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Mitja Majerle for the “Energy Plus Transmutation” collaboration.
Slide 1 The Heavy Ion Fusion Science Virtual National Laboratory Why heavy ions? Target requires: 3.5 – 6 MJ in ~ 10 ns  500 TW Range ~ 0.02 – 0.20 g/cm.
Neutron production in Pb/U assembly irradiated by deuterons at 1.6 and 2.52 GeV Ondřej Svoboda Nuclear Physics Institute, Academy of Sciences of Czech.
Page Production and Release of Gas and Volatile Elements from Sodium- based Targets E. Noah, 38 th Meeting of the INTC, 4 th November 2010 Production and.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Welcome to the CHARMS See – Tea Saturday, March 05, 2016 Comparison of ISOLDE yields with calculated in- target production rates Strahinja Lukić,
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
NATIONAL INSTITUTE OF NUCLEAR PHYSICS Legnaro National Laboratories Numerical simulation strategy for the SPES FEBIAD ion source INFN – CISAS collaboration.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
Project X Energy Station Spallation Target March 20, 2012 D. Wootan, D. Asner 1.
Orsay, 03/Feb/05EURISOL - Beta Beam TaskM. Benedikt 1 The Beta-Beam Task Status and Planning 02/2005 to 01/2006 Michael Benedikt AB-Department, CERN.
T5: Safety & Radioprotection MB meeting, 7-8 July 2008, Lisbon, PortugalContact: Task 5: Participants and work plan Participants:role 1.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
Safety & Radioprotection 8 Jul. 2005, Liverpool, UK WP 5: Safety & Radioprotection Participants:role 1. GANIL, France - sub-task D 2.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Organization – Work Units General layout Neutronics Target design RIBO calculations Yields Beam optics Target handling Shielding Safety target Safety converter.
EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of Task#2 European.
Summary of IAP comments from 2007 EURISOL Town Meeting
P1 – GANIL P2 – CNRS/IN2P3 P3 – INFN P4 – CERN P6 – CEA Saclay P7 – NIPNE Bucarest P18 – PSI Switzerland P19 – IPUL Latvia C2 – BINP Novosibirsk C3 – VNIITF.
Lecture at the MEDICIS-PROMED Summer School
Studies for Developing the MW-station Ion Source
A “standard” ISOLDE target: ThO2-184, n-rich Cu
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
Guidance for hands-on exercise Neutron target
SEM monitors tests PSI February MeV protons
Superbeam Horn-Target Integration
Neutron production in Pb/U assembly irradiated by p+, d+ at 0. 7 – 2
The need for cross section measurements for neutron-induced reactions
Production Cross-Sections of Radionuclides in Proton- and Heavy Ion-Induced Reactions Strahinja Lukić.
What is μ-e Conversion ? μ μ-+(A,Z)→e-+(A,Z) muon decay in orbit
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Presentation transcript:

3 February 2005, J. Lettry 1 Task #3 100 kW direct targets “Development of targets and ion sources for radionuclide production that can accommodate up to 100 kW power from a beam of protons or light ions” Baseline 2005: 1 GeV proton driver, revision of the baseline end 2006

3 February 2005, J. Lettry 2 Strategy: 4 test cases Targets –Actinide target (carbide) UC 2 +C, ThC 2 +C W-converter, Moderator & Reflector –Metal foil target (solid) Ta, Nb –Oxide powder of fiber BeO + converter Insulating materials low dE/dx Low density –Molten metal (Liquid) Vapor condensation Ion-sources –Mono ECR –RILIS (Hg) –FEBIAD Deliverable: Engineering design of 100 kW targets Engineering design of 100 kW targets

3 February 2005, J. Lettry 3 Task #3, plan 2005 CERN –Basic geometry and energy deposition of the test cases TC-1 (Carbide) and TC-2 (metal foils) –Test of a UC-Converter prototype as a Bench mark for neutronics + fission simulation (overview of existing data) –List of material for neutronics codes calibration –Characterization of the ECR noble gas ion-source. –Design and test of an Alkali suppression system for RILIS PSI & CERN –Design of the probe irradiation support –Definition of the procedure for pre- and post-irradiation characterization / analysis PSI –Nuclear calculation for the design given by CERN in view of energy deposition, activation and dose rates. –Define the necessary modifications of the infrastructure to allow the irradiation –PSI will establish a safety report (March 06) and handling procedures for the experiments and start licensing activities. UCL –Literature study of the 6He and 18Ne production mechanism (including other primary beams such as MeV light nuclei). CEA & CERN –RILIS ionization scheme of Hg. Univ. Munchen & CERN –Estimation of the total ion-current and atomic flow through the ion-source outlet. –Ion-source optics: Emittance measurements and selection of the beam optics simulation codes.

3 February 2005, J. Lettry 4 P+M Projections 2005 Task 3, CERNPSILMUUCLCEAINFN TOTAL Personnel (k€)Req. Contr Consumable (k€)Req. Contr Travel and subsistence (k€)Req. Contr Cost Request (k€)Total FTE (man*year)Req. Contr FTE (man*year)Avail FTE (man*year)Total Costs 18%, FTE 17%2005CERNPSILMUUCLCEAINFN TOTAL Personnel (k€)Req. Contr Consumable (k€)Req. Contr Travel and subsistence (k€)Req. Contr Cost Request (k€)Total FTE (man*year)Req. Contr FTE (man*year)Avail FTE (man*year)Total

3 February 2005, J. Lettry 5 Planning TC 1-3

3 February 2005, J. Lettry 6 Planning TC 3-4, target station