Iliso Consulting (Pty) Ltd Outer West Strategic Evaluation 1 Outer West Development Area Strategic Evaluation Traffic and Transportation Issues February.

Slides:



Advertisements
Similar presentations
Urban Problems in Developed World Traffic issues: Roads influence land zoning, & affect the shape & direction of urban expansion. 3 main factors influencing.
Advertisements

GETTING THE BALANCE RIGHT: Breaking the Link Between Economic and Traffic Growth Graham Riley Influencing Travel Behaviour Team.
Consultation on key routes which run parallel to Oxford Road corridor September 2012 Bus priority package.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
RTS Re-fresh North East Transport Consultative Forum Tuesday 30th October 2012.
Economic Geography, Linkages and Low Carbon Economy Business Geographies and Linkages John McCreadie – 6 th July 2010.
Changing Residential and Employment Distributions in Guangzhou An Analysis of Commuting Flows.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
London Streets...The Way Ahead Garrett Emmerson Chief Operating Officer: London Streets.
Twin Cities Case Study: Northstar Corridor. ●By 2030, region expected to grow by nearly 1 million, with 91% to 95% of new growth forecast to be located.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
Sidewalk Strategic Plan City of Peterborough. About Peterborough  Pop. 75,000  Surrounding land is agricultural with Canadian Shield just to the north.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
The SoCoMMS Model Paul Read Dan Jones. The Presentation Outline of the Study The Modelling Framework Accessibility Model.
The City of Gdynia City rights in 1926 With Sopot and Gdańsk forms the Tri-City agglomeration It has inhabitants Port city, employment structure:
2040 Metropolitan Transportation Plan Final Approval GVMC Board May 7, 2015.
Virpi PastinenSCATTER WORKSHOP SCATTER SPRAWLING CITIES AND TRANSPORT: FROM EVALUATION TO RECOMMENDATIONS SCATTER WORKSHOP MILAN OCTOBER 24.
Urban Transport in the Developing World. Elements of Urban Transport Sector Urban public transport: Urban public transport: On-street systems (for buses,
London Transport Policy, Planning and Strategies Towards clean and sustainable transport By Lucy Hayward-Speight, TfL Principal Policy Advisor.
Formation of Multi-habitat for a Sustainable City 1.Introduction-Participatory Process-oriented Planning Prof. Toshinobu FUJII Faculty of Regional Development.
TOWN OF CALEDON Identifying Strategic Employment Lands along the GTA West Corridor – an OPPORTUNITY Open House Presentation June 29, 2015.
Outer West Spatial Development Plan Public Meeting Hillcrest 14 th February 2004.
MAV Rural and Regional Conference 2013 Prue Digby Deputy Secretary Planning Building and Heritage Planning Reform and Rural and Regional Victoria 5 July.
Welcome. Challenges  Overcoming perceptions, some real, that  Gardner is not open for business  We aren’t consistent in the application of our codes.
Chapter 8 – The Comprehensive Plan 10/3/ The Goals of Comprehensive Planning  Comprehensive plans are usually prepared for a period of 20 years.
Regional Centre Transport Vision 2013 Presentation to Salford City Council Members - 19 August 2008.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
Public Consultation A RE YENG REVIEW LINE 2B 13 August 2015.
PRESENTATION TO THE ROAD PAVEMENT FORUM 09 November 2010 Progress & Update since the Road Construction & Maintenance Summit.
RPS Modeling Results Presentation to RPS Policy Committee Brian Gregor Transportation Planning Analysis Unit June 6,
The impact of traffic on the Catherine Hill Bay area.
1 Integrated development planning – a strategic tool for embedding sustainable practices in local government: the experiences of the eThekwini Municipality,
Considering land use as a transport policy tool: A London perspective Isabel Dedring, Transport for London IMPACTS Vienna, March 2006.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
1 What If… The Washington Region Grew Differently? February 2005 Public Meeting on Alternative Transportation and Land-Use Scenarios National Capital Region.
Traffic Management and Transport Demand Management Gladys Frame Consultant Traffic Engineer The World Bank Module 4: Urban Transport Planning.
ECONOMY OF GHANA GROUP (12) PRESENTATION 1 TOPIC: “ THE CONTRIBUTIONS OF THE U.S $547 MILLION MILLENNUIM CHALLENGE ACCOUNT(MCA) TO THE GROWTH OF THE GHANAIAN.
Managing the Local Government Transport Infrastructure Gap Warren Sharpe DIRECTOR INFRASTRUCTURE SERVICES SEATS Meeting - 18 May 2012.
June 14th, 2006 Henk Taale Regional Traffic Management Method and Tool.
PRESENTATION TO NATIONAL TRANSPORT PORTFOLIO MEETING 15 February 2011
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
C OMMITTEE FOR A DELAIDE R OADS Adelaide’s Missing North-South Link.
1 What If… The Washington Region Grew Differently? Results to Date of The TPB Regional Mobility and Accessibility Study February 8, 2006.
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
Newquay & St Columb Community Network Meeting Transport update Vicky Fraser & Rebecca Lyle Cornwall Council 20 th October 2015.
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
Urbanization Key Issue #4: Why do suburbs have distinctive problems?
© CT Management Group Pty Ltd 2015 Municipal Association of Victoria Rate Cap Forum 25 th November 2015 Ian Mann CT Management Group
Design Aducation Forum for Africa Conference, Pretoria, June 2004 How design links with NEPAD strategies and requirements The air transport infrastructure.
Integrated Strategic Development Framework KNYSNA | STATUS QUO | OCTOBER 2013 Spatial Planning KNYSNA | INTEGRATED STRATEGIC DEVELOPMENT FRAMEWORK | OCTOBER.
1 What If… The Washington Region Grew Differently? The TPB Regional Mobility and Accessibility Study Ronald F. Kirby Director, COG Department of Transportation.
Gerald Jennings President Leeds Chamber of Commerce 18 th February 2016 HS2 Leeds The right place for the station in Leeds.
Regina Bypass Project Information Session. Saskatchewan.ca Outline Background –The need for a bypass –Selecting the route –P3 delivery and procurement.
Transportation System Comments Santolina Level ‘A’ Master Plan.
MHPP Forum James Shuttleworth Planning and Infrastructure Manager, MCC 9 December 2015 Greater Manchester Spatial Framework.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
1.Background 2.Approach 3.Methodology 4.Outcomes 5.Summary & conclusion 6.Acknowledgement.
Andrew Pritchard Director of Policy & Infrastructure East Midlands Councils 24 TH FEBRUARY 2016.
An Assessment Of Traffic Impacts Upon Kensington And Parts Of Kingsford 13/07/09.
Deryck Shaw, APR Consultants Ltd May 24, 2016 May 24, 2016 Rotorua Perspective: Economic Market Outlook
Planning Overview, Newbury Gary Lugg Head of Planning and Countryside.
West of England Joint Transport Study
RPS Modeling Results Second Round
NGTA Halton Planning and Public Works Committee
SESSION 2B – TRAFFIC MANAGEMENT, SAFETY AND SECURITY 9 JULY 2019
FREEWAY MANAGEMENT SYSTEMS:
Travel demand forecasting tools and spatial change
Presentation transcript:

Iliso Consulting (Pty) Ltd Outer West Strategic Evaluation 1 Outer West Development Area Strategic Evaluation Traffic and Transportation Issues February 2004 eThekwini Municipality

Iliso Consulting (Pty) Ltd Outer West Strategic Evaluation 2 Background The development of key nodes utilizing public and private resources forms part of the broader strategy to achieve the development objectives of the eThekwini Municipality Outer West Area Terms of Reference Investigation of traffic and transportation issues related to increased residential and commercial development in the Outer West Area. Scope of investigation: –Outer West Local Operational Entity. –Local road network. –Analyse existing infrastructure with existing traffic. –Analyse existing infrastructure with approved developments –Develop and analyse improvements required to cater for approved developments. –Develop and analyse improvements required to cater for planned (not approved) developments. –Develop ultimate network to cater for vision for the area. Rapidly developing residential node some 40km west of Durban CBD. Development type includes greenfield and redevelopment of existing developed sites. Employment nodes to the east include Pinetown, Durban, SIB and Northern areas. Increased east-west tidal flows exacerbates current traffic problems on local and larger metropolitan road network Package of improvements with implementation plan to optimise development release and capital expenditure

Iliso Consulting (Pty) Ltd Outer West Strategic Evaluation 3 Transportation Status Quo The Outer West area largely functions as a residential feeder to the eastern employment nodes and hence is subject to tidal flows with the major direction of travel to and from the Durban central business area. B 18 A 8 C 22 E 73 C 34 B – Operating Level of Service 18 - Average Delay/ Veh (Secs) M13 OLD MAIN INANDA Kassier Stonewall Shongweni Ashley Durban Network operating adequately as a whole. Service levels similar to other high income suburban areas in municipal area. Congestion at key points in network: –Old Main Road/ Inanda Road Intersection –Side street delays on Acutts, Fischer, Wishart, Shongweni M13 Bothas Hill

Iliso Consulting (Pty) Ltd Outer West Strategic Evaluation 4 Approved Developments on Existing Infrastructure System failure occurs when traffic flow becomes unstable and unacceptable delays are experienced on an area wide basis and not at isolated points of congestion F 443 C 25 F 163 F 737 D 35 B – Operating Level of Service 18 - Average Delay/ Veh (Secs) M13 OLD MAIN INANDA Kassier Stonewall Shongweni Ashley Durban Network breaks down on Old Main Road Congestion experienced elsewhere on network. Side street delays on Inanda intolerable and could lead to safety problems without intervention. M13 Bothas Hill

Iliso Consulting (Pty) Ltd Outer West Strategic Evaluation 5 Approved Developments on Proposed Improvements System performance improves to match status quo although localised areas of congestion will remain. C 21 A 9 D 43 D 53 D 35 B – Operating Level of Service 18 - Average Delay/ Veh (Secs) M13 OLD MAIN INANDA Kassier Stonewall Shongweni Ashley Durban Package of improvements at R26 million including; –Intersection upgrades on Old Main road –Additional lanes on Inanda Road –4 th ramp at Shongweni Road Interchange Network operation improves to current status quo levels Service levels similar to other high income suburban areas in municipal area. Congestion at key points in network. Side street delays on Inanda resolved by signalisation and widening. M13 Bothas Hill

Iliso Consulting (Pty) Ltd Outer West Strategic Evaluation 6 Planned Developments with Further Improvements Further improvements aimed at extending system capacity to cater for increased level of activity and a possible shift in spatial patterns of development C 21 C 24 D 53 D 46 D 42 B – Operating Level of Service 18 - Average Delay/ Veh (Secs) M13 OLD MAIN INANDA Kassier Stonewall Shongweni Ashley Durban Package of improvements at R33 million including; –Further widening on Inanda Road. –Additional lanes on Kassier Road. –New Link between Kassier and Inanda. Network operation improves to current status quo levels Service levels similar to other high income suburban areas in municipal area. Congestion at key points in network. System more balanced and geared towards future growth and possible spatial patterns. M13 Bothas Hill