1 Energy Storage Settlements Consistent with PUCT Project 39917 & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.

Slides:



Advertisements
Similar presentations
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Advertisements

1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Raine Cotton  Registered DG settlement is in accordance with Protocol Section as Real-Time Energy Imbalance at a Load.
TPTF Presentation Registration of PUN Facilities December 19, 2007.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Hurricane Rita. 2 ERCOT Preparation ERCOT started alerts to QSEs and TOs on 9/21 Did a site failover of EMMS system Austin Taylor Procured satellite voice.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
NPRR 209 Presentation Adrian Pieniazek – NRG Texas Technical Advisory Committee May 6, 2010.
ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE Emerging Technology Working Group, September 17 th, 2015 Cyrus Reed, Lone Star Chapter, Sierra.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
ERCOT MARKET EDUCATION
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
0 The Basics –There are 4 POLR customer classes: Residential, Small Non-Res. (
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Calculation of Net Energy for Load COPS. 2 2 Outline  Definition of Net Energy for Load  How Net Energy for Load is calculated in ERCOT.
Southern California Edison SM Southern California Edison Company Proposed AB920 Net Surplus Compensation Rate [NSCR] July 9, 2010.
GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007.
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
SPP Presentation Stakeholder Meeting April 16, 2008 Austin, Texas UPDATE: Retail Open Access for ETI within SPP.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
ERS Update – DSWG Presentation September 21, 2012.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
RMS Update to TAC October 5, RMS Activity Summary 2008 Test Flight Schedule Update on TAC directive relating to identifying issues with net metering.
Distributed Generation Registration June 30, 2008.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Philippine Feed-In Tariff System Implementation 1.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
October 13, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements Task.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Analysis of Load Reductions Associated with 4-CP Transmission Charges in ERCOT Carl L Raish Principal Load Profiling and Modeling Demand Side Working Group.
1 RMS Update to RMWG June 6, Market Process for Solar & Wind Devices Retail customers are purchasing and installing wind and solar equipment on.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
ERCOT MARKET EDUCATION
LPGRR060, Load Profiling Guide Clean Up Related to LPGRR057
Fuel Cost Components in the Fuel Adder
Fuel Cost Components in the Fuel Adder
Hurricane Rita.
John Dumas Director, Wholesale Market Operations
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Fuel Cost Components in the Fuel Adder
Settlement Update Austin Rosel ERCOT October 11, 2017.
Narragansett Electric Rate Classes
Reflecting Losses in DR within ERCOT August 22, 2012
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
31st USAEE/IAEE North American Conference
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting

2 Agenda Guiding Principles –References to the preamble for Project –References to the rule language –Commission Staff direction on the rule intent Implementation Concepts –Metering Configurations –Data Aggregation –Settlements Spreadsheet Examples –Separate file attached to meeting materials

3 Guiding Principle 1 An energy storage resource has the option of receiving wholesale storage load treatment. –Excerpt from Commission Response to question 1 in the preamble “…. the storage facility could choose not to separately meter the storage facility and treat all energy purchased from the ERCOT system as retail sales.”

4 Guiding Principle 2 Wholesale Storage Load is defined in NPRR461 as – “Energy that is separately metered from all other Facilities to charge a technology that is capable of storing energy and releasing that energy at a later time to generate electric energy”. –Excerpt from § (m) (2) “Wholesale storage occurs when electricity is used to charge a storage facility; the storage facility is separately metered from all other facilities including auxiliary facilities; and energy from the electricity is stored in the storage facility and subsequently re- generated and sold at wholesale as energy or ancillary services.” –Storage facility energy that is re-generated is treated as a wholesale sale in the same manner as non-storage generation. The re-generated energy can self-serve associated Load behind the same POI at the generation site and/or be valued as an injection to the ERCOT system.

5 Guiding Principle 3 Load for an energy storage Load Resource must be separately metered to be considered wholesale storage load –Excerpt from § (m) (2) “Wholesale storage occurs when electricity is used to charge a storage facility; the storage facility is separately metered from all other facilities including auxiliary facilities; and energy from the electricity is stored in the storage facility and subsequently re- generated and sold at wholesale as energy or ancillary services.”

6 Guiding Principle 4 All generation output can be netted with generation site auxiliary loads and associated loads. –Commission staff direction on the intent of the rule the preamble reference provided was an excerpt from the Commission Response to question 1 in the preamble –“PURA § provides that a storage facility is entitled to be treated like other generation facilities in the sale of energy and ancillary services at wholesale.” –Wholesale Storage Load is not considered generation site auxiliary load or associated load. –Storage facility energy that is re-generated is treated as a wholesale sale in the same manner as non-storage generation. The re-generated energy can self-serve associated Load behind the same POI at the generation site and/or be valued as an injection to the ERCOT system.

7 Guiding Principle 5 Wholesale storage load is exempt from charges and credits based on Load Ratio Share or per MWH basis –Excerpt from § (m) (2) “… Wholesale storage is not subject to retail tariffs, rates, and charges or fees assessed in conjunction with the retail purchase of electricity. Wholesale storage shall not be subject to ERCOT charges and credits associated with ancillary service obligations, or other load ratio share or per megawatt-hour based charges and allocations....”

8 Guiding Principle 6 Wholesale storage load will not be included in the ERCOT 4CP calculations. –Excerpt from §25.192,Transmission Service Rates (b) (1) “… A TSP’s transmission rate shall be calculated as its commission- approved transmission cost of service divided by the average of ERCOT coincident peak demand for the months of June, July, August and September (4CP), excluding the portion of coincident peak demand attributable to wholesale storage load….”

9 Guiding Principle 7 Settlement for a storage facility that has more than one delivery point shall be based on the net impact of those delivery points on ERCOT system. –Excerpt from § (m) (1) “For a storage facility that has more than one delivery point, ERCOT shall net the impact of those delivery points on the ERCOT system for settlement purposes”

10 Guiding Principle 8 Wholesale storage load pricing shall be based on the LMP at the electrical bus –Excerpt from § (m) (2) “… Wholesale storage is wholesale load and ERCOT shall settle it accordingly, except that ERCOT shall settle wholesale storage using the nodal energy price at the electrical bus that connects the storage facility to the transmission system, or if the storage facility is connected at distribution voltage, the nodal price of the nearest electrical bus that connects to the transmission system. …”

11 Implementation Concepts Metering configurations –will be based on ERCOT system design and capabilities for accounting for the wholesale storage load and site generation have separate wholesale storage load metering for each energy storage Load Resource –will NOT be allowed if they do not conform to a design that allows ERCOT to settle the site

12 Implementation Concepts Data Aggregation processes –wholesale storage load will –be included to determine total UFE will NOT –be assigned Unaccounted for Energy (UFE) –be included in Adjusted Metered Load (AML) –be included in ERCOT 4CP calculations –be included in TRE fee calculations –have transmission and/or distribution losses added

13 Implementation Concepts Settlement processes –wholesale storage load will –be settled by QSE and Settlement Point –be settled through Real-Time Energy Imbalance at a Resource Node –be settled using an energy-weighted price at the bus (ESR load is LMP weighted average by telemeter ESR load) will NOT –be included in any Load-shared charges and credits –be settled using a Load Zone Settlement Point Price

14 Questions and Discussion