PEA POTENTIAL FUTURE SCARCITY PRICING JUNE 2013 (UNFINISHED BUSINESS OF APRIL 2013) Drafter Lewis Evans.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Energy Information Administration Markets, Hubs, Trading Places, and Capacity Release Markets by John H. Herbert.
1 Topic 3.c: Transferable emission permits We will start analyzing the last policy we will look at for pollution control. –Tradable/transferable emission.
1 Prof. Dr. Hans-Martin Niemeier Introduction and overview of ongoing research issues GAP Research Workshop Berlin, April Hans-Martin Niemeier.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Various methods of calculating price for your product or service
Copyright © 2011 Pearson Addison-Wesley. All rights reserved. Chapter 10 Exchange Rates and Exchange Rate Systems.
ECON 101: Introduction to Economics - I Lecture 3 – Demand and Supply.
Hedging Strategies Using Derivatives. 1. Basic Principles Goal: to neutralize the risk as far as possible. I. Derivatives A. Option: contract that gives.
Ch. 22 International Business Finance  2002, Prentice Hall, Inc.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
3 DEMAND AND SUPPLY.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Transfer & Trades Special Transmission Workstream
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
© 2012 Pearson Education, Inc. All rights reserved Transaction Exchange Risk Transaction exchange risk – possibility of taking a loss in foreign.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Colombia’s Forward Energy Market Peter Cramton University of Maryland 5 November 2007.
New Regulatory Scheme to Guarantee Power Reliability Colombia, an investment oportunity Santo Domingo, March 14-15, 2007.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Animal Science and the Industry. Common Core/Next Generation Science Standards Addressed CCSS.ELA-Literacy.RH Determine the meaning of words.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Promoting Gas-Interconnector Investment - Insights from Laboratory Experiments Bastian Henze Tilburg University, CentER & TILEC GRI Workshop Stockholm,
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
Todos los derechos reservados para XM S.A E.S.P. October, 2006 Luis Alejandro Camargo S. Wholesale Market Manager XM S.A. E.S.P. THE NEW COLOMBIA FIRM.
Market Implications and Considerations for Enhanced Scheduling Flexibility: Facts Observations Problems Solutions February 2016 Greg Lander– President.
Trades and Transfers Workshop, 6 th November 2007.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Introduction to Swaps, Futures and Options CHAPTER 03.
Overview of the Contract Carriage Gas Markets in Eastern Australia James Mellsop Director 4 December 2012 Presentation to PEA.
Gas Transmission and Capacity Pricing Workshop 11 April 2013.
Work Plan and Key Deliverables 2 November WORK PLAN.
Alternative Approach to Enduring Exit Flat Capacity & Revenue Recovery Gas TCMF 14 th December 2006.
THE PEA ON GAS TRANSMISSION ACCESS AND PRICING: APRIL 2013 Drafted by Graham Scott and Lewis Evans.
Gas Transmission and Capacity Pricing Workshop – Topics for Discussion 11 April 2013.
Doug Wood GTE-CEER transit workshop Brussels, 24 January 2007 Doug Wood GTE-CEER transit workshop, 24 Jan 2007 European Federation of.
Proposals for physical constraint management Presentation to PEA James Mellsop Director Wellington 29 January 2013.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Nominations James Mellsop Director 4 December 2012 Presentation to PEA.
PEA meeting material 15 March PEA’S FURTHER ADVICE TO GIC ON TRANSMISSION ACCESS AND CAPACITY PRICING Gas Industry Co2.
Nominations PEA Meeting October Why ask for Nominations? In a common carriage system gas flows must be approved in advance to keep them within pipeline.
Gas Transmission and Capacity Pricing Workshop - Introduction 11 April 2013.
Details of demand management options
Gas Transmission Access: Priority Rights
PJM Load Product (Consumption Product)
Transmission Workstream, 2nd March 06
GTAC Workshop Block 5 19 September 2018.
Transmission Pricing & Regional Electric Markets
Demand management options on the Vector pipeline system
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
An action-based way forward
EURELECTRIC transparency requirements
Optimisation of Entry Capacity Modification Proposal
Presentation transcript:

PEA POTENTIAL FUTURE SCARCITY PRICING JUNE 2013 (UNFINISHED BUSINESS OF APRIL 2013) Drafter Lewis Evans

APRIL 2013 AGENDA JUNE Revised terms of reference 2. State of the market 3. Context 4. PEA thinking 5. In Progress: today finalisation? 6. Workshop Topics

System Evolution I (April 2013) Systems and Physical Capacity Pipe Utilisation point-to-point Gas Spot Market Separate from Transmission VIC/NSW Carriage Maui & Vector contract Point-to-point Shipping Maui & Vector contract with interruptible Nodal entry/exit transactions Input need not equal take System cost (&Functional Specialisation) Point-to-pointAs above + market pricing nominations Thursday, April 11, 2013 Panel of Expert Advisers 3

PEA On Progress (April 2013) Consider the effect on incentives on Vector (and MDL) and TSOs to manage for timely change in the presence of Part IV regulation More precision on form and pricing of nominations Panel of Expert Advisers 4 Thursday, April 11, 2013

PEA ( June 2013) The scarcity pricing issue Panel of Expert Advisers 5 Thursday, April 11, 2013 Price Nomination/shipping charge Demand capacity Clearing price Firm common/interruptible Nominations to be scaled

PEA (June 2013) A practical potential/feasible approach to pricing (frequent) scarcity Start with MPOC where Panel of Expert Advisers 6 Thursday, April 11, 2013 There are nominations required for all nodes (WPs) No historical-use grandfathering Nominations form the shipping contract AQ i is firm capacity held by shipper i, where sum AQ i = 70% of capacity Define AQ i capacity, to be the right to ship (i.e. nominate), but not the obligation to ship gas at a volume of AQ i.. AQ is tradable in any amount There are yearly auctions of a mix of (say) tranches of 1 and 5 year capacity (i.e. the AQ i )

PEA (June) A practical potential/feasible approach to pricing (frequent) scarcity Process I Panel of Expert Advisers 7 Thursday, April 11, 2013 All shippers nominate (say for the following day) n i Feasibility: If there is excess demand, sum n i > capacity and TSO scales back all nominations pro-rata. Produces adjusted feasible nominations n* i where - sum n* i = capacity - Payment under the shipping contract is shipping charge x n* i. Firmness: TSO then adjusts (pro rata) the n* i so that the firm AQ i can be satisfied. Call these adjusted nominations n** i. They are feasible and - Sum n** i = capacity - n** i meet firmness nominated: ≤ total potential firmness (capacity)

PEA (June) A practical potential/feasible approach to pricing (frequent) scarcity Process II Approach 1: that is the end of the story Approach 2: firm capacity buys its firmness from the infirm (sic) at say the spot price of gas (p g ) The feasible delivered nominations (n* i ) at the node have been adjusted pro-rata (to n** i ) so that the benefit of firmness is provided to those with AQ at that node then Shippers with AQ i pay p g x (n** I - n* i ) Shippers without AQ receive p g x (n* I - n** i ) And aggregate payments = aggregate receipts Panel of Expert Advisers 8

PEA (June) A practical potential/feasible approach to pricing (frequent) scarcity The Pros and Cons I Approach 1: determines prices of demand/supply of firmness at the time of the AQ auction in the context of potential excess demand for capacity. It does so in advance of shortages. It does not provide short run pricing that may be important within a year and as the market evolves Approach 2: also prices demand/supply of firmness in advance; but has an approximation to a spot market that reflects actual outturns. The ex ante cost of firmness(auction price) will reflect the expected level of payments at the spot price Thursday, April 11, 2013 Panel of Expert Advisers 9

PEA (June) The Pros and Cons II More on Approach 2: is it reasonable? The infirm: Have gas at that node bought from them under forced sale. It is reasonable payment would be the spot price of gas (they pay shipping to the node): i.e. the minimal return that the interruptible shippers might expect at that node The firm: Pays ex ante for the right of a forced purchase of gas at the spot price to achieve firmness. The AQ auction prices will reflect this, as will their downstream trades. The approach mirrors commodity markets where hedges (the AQ) are the norm and overs and unders are traded on spot Thursday, April 11, are 10

PEA (June) The Pros and Cons III NSW seems to use shipper bids in the spot as revealed preference for setting capacity charging. This could be a development, but it is unclear if it is a material advance. The auctioning of (AQ) ex ante firmness is important and likely to address problems identified with NSW and Vic: entry problems from volatility of charges and no long term price signals NZ gas spot market is proposed and would fit with the evolution of Approach 2 Induces utilisation of AQ or release (e.g. via nomination or sale of firmness) Thursday, April 11, are 11

PEA (June) Potential/Possible application in VTC Create welded points at least at capacity-critical nodes or in relation to them (virtual WPs) Nominations at welded points, be the basis for shipping charges Capacity contracts same in principle as AQ Grand fathering capacity doesn’t matter much since capacity is just AQ and shipping charge is on nominations: ie use it or lose it (shouldn’t expand GF) Auction capacity Move to a mix of contracts (say firm(70) : interruptible(30)) How to treat non-welded points? Perhaps zones behind constrained (virtual) WPs? Thursday, April 11, are 12