Unconventional Gas & LNG: A Regulator’s Perspective Paul Jeakins, Chief Operating Officer, BC Oil and Gas Commission B.C. Oil & Gas Conference | September.

Slides:



Advertisements
Similar presentations
British Columbia Jurisdictional Update Pacific States / British Columbia Oil Spill Task Force AGM September 2013, Seattle, Washington Wes Shoemaker, Deputy.
Advertisements

Overview of British Columbia’s Infrastructure Royalty Credit Program
FINANCIAL INSTITUTIONS ENERGY INFRASTRUCTURE, MINING AND COMMODITIES TRANSPORT TECHNOLOGY AND INNOVATION PHARMACEUTICALS AND LIFE SCIENCES Coal Seam Gas.
Aboutpipelines.com Managing Safety and the Environment PATRICK SMYTH, VP SAFETY & ENGINEERING 28 OCTOBER 2014.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
The conditions required to establish natural gas infrastructures Presentation by Mr. Robert Tessier, President and Chief Executive Officer CAMPUT 2005.
Conference on Environmental Assessments in Federations A Montana Perspective September 14, 2009 Tom Livers, Deputy Director Montana Department of Environmental.
41 st Asia Pacific Economic Cooperation Energy Working Group 2011 Regulating British Columbia’s Natural Gas Presented by: Paul Jeakins BC Oil and Gas Commission.
LiquefiedNaturalGas L N G A safe and clean fuel Essential to meeting U.S. energy needs Helping drive economic growth.
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
Davis Graham & Stubbs LLP DGSLAW.COM Dave Neslin Davis Graham & Stubbs LLP Former Director of the Colorado Oil & Gas Conservation Commission Environmental.
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
Liquefied Natural Gas Development in B.C. Steve Carr – Deputy Minister Ministry of Natural Gas Development – British Columbia September 10, nd LNG.
Applying the Federal Cabinet Directive on Streamlining Regulation Regulatory Craft in Nova Scotia Conference 2007 Halifax, Nova Scotia November 20, 2007.
Broadening the Marcellus Discussion – Issues and Economics of the Resource Thomas Murphy Penn State Cooperative Extension October 2009.
Mitigating the Social Impact of Oil Operations 18th World Energy Conference Eleodoro Mayorga Alba World Bank October 22, 2001.
1. 2  Strategic – BC Hydro Long Term Planning  Project level  Environmental Assessment ▪ Federal - Canadian  Integration 3.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
Douglas A. Sipe Outreach Manager Outreach Manager Division of Gas-Environment and Engineering Federal Energy Regulatory Commission Office of Energy Projects.
Overview of Environmental Assessment in BC Presentation to the Professional Economists Association of BC November 28,
Natural Gas Markets and Reliability of the Electric Power Industry William Trapmann, Energy Information Administration Natural.
Confidential Project Update: District of Chetwynd Bruce Wells, Vice President, Project Development February 02, 2015.
Health and Environmental Impacts of Transmission Pipeline Infrastructure Prepared for Citizens Meeting Dallas, PA September 17, 2014 Sam Koplinka-Loehr.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
FORGING PARTNERSHIPS BUILDING RELATIONSHIPS, ABORIGINAL CANADIANS AND ENERGY DEVELOPMENT 23 January 2014 Douglas R. Eyford PRESENTATION TO BC CONSTRUCTION.
Presented to: Gas Storage Conference Ziff Energy Group Houston, TX February 2, 2005 Natural Gas Storage Market Issues: A Federal Perspective William F.
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
Engaging Freight and Supply Chain Representatives in Public Sector Projects.
The TERMPOL Review Process RDIMS# Presentation Outline  What is TERMPOL?  The Purpose of TERMPOL  How TERMPOL Works  Benefits of TERMPOL 
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
Agency Coordination: Fraser River Estuary Management Program [FREMP] Georgia Basin/Puget Sound Research Conference 3 April 2003 Vancouver,
THE NORTH AMERICAN LNG OPPORTUNITY APEGGA, Calgary, Alberta.
LNG North American Summit 2008 Houston, Texas June 19, 2008 James M. Kendell Energy Information Administration U.S. Natural Gas.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
© 2012 Chevron U.S.A. Inc. All rights reserved. Sustainable Development of Natural Gas from Shale Gregory Hild Chevron U.S. Marcellus Operations APEC Workshop.
The Wisconsin Green Tier Program: Developing An Evaluation Tool Analysis by: Darryn Beckstrom, Jessalyn Frost, Erin Rushmer, and Melody Sakazaki.
The Northeast Natural Gas Market in 2030 LNG EXPRESS CONFERENCE Boston, Massachusetts September 21, 2006 William Trapmann Natural Gas Analysis Team Leader.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
CALIFORNIA’S AIR TOXICS PROGRAM: IMPROVEMENTS TO ASSESS HEALTH RISK Update to the Air Resources Board July 24, 2014 California Environmental Protection.
FERC Office of Energy Projects 1 Richard Hoffmann, Director Division of Gas – Environment & Engineering Office of Energy Projects Policies Affecting.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Security at FERC Energy Projects Energy Bar Association Mid-Year Meeting Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory.
Presentation to Membership. A Recap of Our Process February 2009: Decision to renew strategic plan March 2009: Engagement of Berlin, Eaton.
CANADIAN NATURAL GAS Security of Supply Graham Flack Associate Assistant Deputy Minister, Energy Policy Natural Resources Canada Forum on Continental Energy.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Natural Gas and Energy Reform Legislation Steve Crout Managing Director, Government Affairs American Gas Association.
Integrating Your Environmental Management System With Community Stakeholders Mr. Jimmy Parrish Defense Supply Center Richmond April 7, 2004 Presented To.
November 30, 2015 Discussion Draft. Beginning with the End in Mind.
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
Northern Projects Management Office in Nunavut Nunavut Mining Symposium April 2012.
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
U.S. Energy Information Administration Independent Statistics & Analysis Natural Gas Demand: New Domestic Uses and LNG Exports Natural Gas.
Planes, Trains & Automobiles Oil & Gas Conference Fort Nelson, BC 2011.
- DISCOVER THE DIFFERENCE - Florida’s Natural Energy - DISCOVER THE DIFFERENCE -
September 2014 Atlantic Coast Pipeline. 2 Dominion’s Core Values Safety Ethics Excellence One Dominion.
Is The Marcellus Fairway Also A Pathway To Brownfield Redevelopment? Hull & Associates, Inc. National Brownfields Conference Philadelphia, Pennsylvania.
Reaching New Heights Tools and Data for air quality planning in the Intermountain West Intermountain West Data Warehouse Presenter: Agency: Contact Information:
Unconventional Hydrocarbon Exploration Planning Workshop Date: 26 th January
Siting Updates and the CEQ Meeting March 18, 2013 Linda Davis Western Governors’ Association.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Exploring Pipeline Dynamics to Connect New Markets
Mission: To protect human health and safeguard the environment
Are China’s Pipelines Ready: to meet its energy needs by 2030?
Economic Regulation of Irish Water
Enbridge Presentation to the NEB Modernization Expert Panel Edmonton, AB – Mar 7, 2017.
Rights and Interests Program
November 30, 2015 Discussion Draft
John Martin Reservoir Master Plan Revision
Kitimat LNG Asia-Pacific Economic Cooperation (APEC) Energy Working Group May 10, 2011.
Presentation transcript:

Unconventional Gas & LNG: A Regulator’s Perspective Paul Jeakins, Chief Operating Officer, BC Oil and Gas Commission B.C. Oil & Gas Conference | September 2011

Topics Mission Resource Overview An Evolving Resource Evolving Regulation Pieces of the LNG Puzzle Proposed LNG Projects in B.C. Moving Forward Unconventional Gas & LNG: A Regulator’s Perspective

MISSION We regulate oil and gas activities for the benefit of British Columbians. We achieve this by: Protecting public safety, Respecting those affected by oil and gas activities, Conserving the environment, and Supporting resource development. Through the active engagement of our stakeholders and partners, we provide fair and timely decisions within our regulatory framework. We support opportunities for employee growth, recognize individual and group contributions, demonstrate accountability at all levels, and instill pride and confidence in our organization. We serve with a passion for excellence.

Canada 3 rd in natural gas production worldwide (159 BCM, 5.1%) 3 rd in net export of natural gas (76 BCM) 87% of US natural gas imports in 2009 came from Canada British Columbia Expansive unconventional gas reserves 2 nd in Canada for natural gas production Reserves on the rise Pacific coast Market diversification with LNG Resource Overview

Horn River Basin Shale 11,900 sq km Tcf marketable natural gas 97 Bcf cumulative production* Montney Tight gas/shale 15,281 sq km Tcf marketable gas 577 Bcf cumulative production* Cordova Embayment Shale 2,590 sq km Tcf marketable gas Early development Liard Basin Shale 1,150 sq km Early development Shift to unconventional gas Northeast British Columbia is home to four geographic basins which are recognized sources of shale gas. * 2010 production numbers Resource Overview

UNDERGROUND ABOVE GROUND Hydraulic fracturing Larger pools More predictable development Longer development timeframes Less H 2 S Opportunity to analyze surface footprint and manage surface impacts Different development of footprint Shift in resource needs – water, access An Evolving Resource

From One Wellpad to the Basin Level 1.2 hectares 1 million hectares Evolving Regulation

8 Strategic Geographic Scale: NE BC – 10 million ha Temporal Scale: >10 years Leads: Government agencies Input: First Nations, Stakeholders, Public, Commission and Industry Feedback Products: Laws; LRMPs; specific policy guidance (i.e. boreal caribou) Direction Tactical Geographic Scale: Basin – 1 million ha Temporal Scale: 5-10 years Leads: Commission Input: Government agencies, First Nations, Stakeholders and Industry Products: Oil and gas basin analysis, footprint analysis, monitoring plan, required best practices Operational Geographic Scale: ha Temporal Scale: 1 year + Products: Permit conditions Leads: Commission Input: Industry, First Nations and Stakeholders Feedback Products: Permit conditions Direction Using Tactical Analysis & Strategic Direction Evolving Regulation

Total Footprints & Identifying Trends Evolving Regulation

Consultation and notification by Industry Industry application to Commission Commission First Nations consultation Commission application review and assessment Industry exploration activity commences Commission compliance and inspection Application for production and production activity commences Commission enforcement Decision by Commission with terms and conditions The Project Lifecycle of Industry Applications… Community Relations involved throughout the whole process Site reclamation and restoration Pipeline regulation from application through to reclamation/restoration. Collaborate with other agencies as needed, such as National Energy Board and Environmental Assessment Office. Evolving Regulation

Pipeline regulation from application through to reclamation/restoration. Collaborate with other agencies as needed, such as National Energy Board and Environmental Assessment Office. Activities

Project Assessment Fiscal Year to Date Activities - WELLS April 1, September 2, 2011

Activities Project Assessment Fiscal Year to Date Activities - PIPELINE April 1, September 2, 2011

Montney Tight gas/shale 15,281 sq km Tcf marketable gas 577 Bcf cumulative production* Source Transport (pipes) Deep water port LNG Plant Ships Receiving LNG Plant Graphics courtesy of Douglas Channel Energy Partnership Pieces of the LNG Puzzle

24 days round trip to sail from B.C. to Asia Graphics courtesy of Douglas Channel Energy Partnership Pieces of the LNG Puzzle

Montney Tight gas/shale 15,281 sq km Tcf marketable gas 577 Bcf cumulative production* LNG applications will be submitted as Facility Permits, and the process will be very similar to that of a gas processing plant application in regard to timelines, submission requirements, and Commission engineering review protocols. Plans underway to prepare for new projects:  The use of experts/consultants that specialize in the area of LNG.  First Nations participation.  A continued effort to improve efficiencies in application review procedures and increase technical capacity to manage new and complex applications.  As new regions and projects are identified for oil and gas activity, the Commission will continue to build internal capacity for First Nations consultation, landowner support and increasing public awareness of oil and gas regulations. … Being Ready for LNG Applications Pieces of the LNG Puzzle

Montney Tight gas/shale 15,281 sq km Tcf marketable gas 577 Bcf cumulative production* Graphics courtesy of Pacific Trail Pipelines Website Quick Facts Estimated cost of project: Approximately $1 billion Pipeline location: Summit Lake to Kitimat, British Columbia Pipeline Length: Approximately 463 km Pipeline Capacity: Approximately 1,000 mmcf/d Compressor stations: One Date of Operation: 2015 Pieces of the LNG Puzzle

Project Interest in LNG  Kitimat LNG  Douglas Channel Energy Partnership (DCEP) Future plans to construct and operate a small-scale natural gas liquefaction facility on the west bank of the Douglas Channel, within the district of Kitimat.  BC LNG Export Co-operative LLC. Application to build a 125-million cubic feet per day terminal. Proposed LNG Projects in B.C.

Montney Tight gas/shale 15,281 sq km Tcf marketable gas 577 Bcf cumulative production* Kitimat LNG Partnership between Apache Canada Ltd., Encana Corp. and EOG Resources Canada Inc. Potential of a $4.7-billion export terminal capable of processing 700 million cubic feet of gas/day. Target for the first shipment is Kitimat LNG Regulation Commission asked to be regulator. Federal government, Haisla, Industry, other government agencies. Federal regulations. The Kitimat-Summit Lake Natural Gas Pipeline Looping (KSL) Project Purpose will be a 460 km natural gas transmission pipeline system to deliver natural gas from the Spectra Energy Transmission (SET) pipeline system at Summit Lake, B.C. to the Kitimat LNG export terminal near Kitimat, B.C. Proposed LNG Projects in B.C.

Moving Forward  First year of the Oil and Gas Activities Act o Opportunities o Flexibility  Regulatory oversight  Commitment to transparency  Emphasis on environmental values

More information: Paul Jeakins BC Oil and Gas Commission Chief Operating Officer Unconventional Gas & LNG: A Regulator’s Perspective