TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.

Slides:



Advertisements
Similar presentations
Construction Engineering 221
Advertisements

ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
1 Secondary Emission Beam Profile Monitor H. Haseroth, CERN.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
High Energy Dump LSS5 STI Cost Estimate A.PERILLO MARCONE & F.PASDELOUP 2015/04/16 With contribution of R.FOLCH & D.GRENIER.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
AIDA Infrastructure for very forward calorimeters Design proposal Mechanical support structure Designers:In collaboration with: Eric DavidFrancois-Xavier.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
 Read out strips production : We will provide 200 strips (100 RE4/2 and 100 RE4/3) Contract with Beijing Gaonengkedi Co. signed on 10-Aug., 3 RE4/2 and.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI
Doing business with CERN Anders Unnervik Ankara 5 October 2015.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
HRM28-TCDI Updates June 24 th, 2015 Fausto Lorenzo Maciariello, F-X Nuiry, R. Ferriere, K. Karagiannis, M. Butcher, G. Vorraro, S. Le Fouest.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
1 LHCC RRB SG 16 Sep P. Vande Vyvre CERN-PH On-line Computing M&O LHCC RRB SG 16 Sep 2004 P. Vande Vyvre CERN/PH for 4 LHC DAQ project leaders.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
R. Rosol, LIU-PSB review, 10 September BI.DIS Pulse generators R. Rosol, LIU-PSB review, 10 September Luc SERMEUS, Rodolphe ROSOL Laurent.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
Dr. Mohamed Riyazh Khan DoMS
High Order Mode Suppressors (HOMS) for SPS TWC200 (Sébastien Calvo, David Bastard) 25 November 2015 LIU-SPS Coordination Meeting.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
7/06/20111 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Linac4 Ion Source Review Design and Production New LINAC4 Front end Chamber.
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
Electronic Systems Support EPTAB 7 Electronics Pool Status Report 6 December 2004 Chris Parkman Catherine Moine.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
TCDI Project Update François-Xavier Nuiry April 15 th 2015 EN-STI-TCD.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
HRM28-TCDI Updates October 28 th, 2015 Fausto Lorenzo Maciariello, on behalf of the TCD Team.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
CERN Converter Control Electronics RadDIM – Project Status and Budget B. Todd, S. Uznanski.
Vacuum System P. Chiggiato TE-VSC
News and Introduction from CERN June 15th, 2005
Brief Status SPS Prototype PSB Prototype Installed in LS1
AD Horn upgrade HV generators
LIU Wire Scanner Milestones June 2017
News about the WA104 Programme
Diagnostics for XPR CNAO BD Group Pavia, 15 July
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
ELENA electron cooler and SEM grids status
Renovation of the 45-year old PS magnets
Beam Wire Scanner for PSB
LIU Wire Scanner Series Costs
Status of ATLAS Resources
Peer Review Agenda (Suggested).
Planning Quality control - Manufacturing logbook Photos Conclusions
East Hall under construction
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD

TCDI Project expected cost 2 10/04/2015 ESTIMATED PRICES [CHF] Estimated Total Collimator Mechanics Total Collimator tank/jaw assembliesSubcontracting and raw mateirals247 kCHF Total collimator production and manpower at CERN Supporting structure production and assembly to the tank [CERN work] Estimated Total 153 kCHF Estimated Total Total per collimator Tank and jaw production and mounting Subcontracting work and raw materials cost Supporting structure production and assembly to the tank [CERN work] 400 kCHF Estimated Total HRMPrototyping Fixed costs Total other costs for all project excluding prototyping Collimator design, integration, transport and vacuum preparation 1670 kCHF 550 kCHF601 kCHF MASK Estimated Total Total for 12 masks Worst case scenario: If 12 masks shall be replaced 680 kCHF HRMPrototyping Total TCDI Project 14 collimators plus the proto plus spare parts for 1 collimator 8760 kCHF 550 kCHF601 kCHF NO contingency in this budget. Cost would increase in case of major issue, for instance subcontractor bankruptcy.  12 TCDI collimators  2 TCDI spares  1 prototype  Spare parts for one collimator  12 Masks Cost Removal of old collim. Including:and Design, Production, Qualification, Installation of Budget still under construction, Presented the 15/04/2015

Budget spending profile Total TOTAL TCDI material fees [63122] Engineering and design studies TCDI Integration TCDI Design HRM Design 115kCHF 29kCHF 46kCHF 40kCHF HRM Target material100kCHF HRM Instrumentation160kCHF HRM testing tank20kCHF HRM Tank production120kCHF TCDI start prototyping and vacuum tests30kCHF Total545kCHF Budget code :62011 in 2015 (for TCDI only) ~30kCHF =9 months technical student + 2 months stagiaire Last version of the TCDI Budget: 8/05/2015 Total price changed due to TCDI Control and vacuum equipment prices updates NO contingency in this budget.