City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.

Slides:



Advertisements
Similar presentations
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Advertisements

Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
AIRPORT AREA INFRASTRUCTURE TIF DISTRICT: Public Hearing Presentation Oct 21, 2013.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Annexation Presentation 06/10/20141 Planning for our Future.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
6 th Street Water Main And Street Reconstruction 2013.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Westbrook Village Verdict Storm Drainage & Waterline Improvements Contract Amendment for GMP No.1 Pulice Construction, Inc. ITEM 10C April 21, 2009.
Utility Extension Project
Programming/BudgetEngineering.. Current WisDOT Policy and Guidelines : mega/mg-budget-est-mgmt.pdf
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
State Financing Programs for Brownfield Redevelopment.
Financing Your CIP …and Planning Ahead for New O&M.
Municipal Tax Increment Financing
Statewide Community Infrastructure Program “SCIP”.
CITY OF MERIDIAN FY07 BUDGET HEARING Mayor – Tammy de Weerd Council President – Shaun Wardle Council Vice President – Joe Borton Council – Keith Bird Council.
Nick Johnson, PE Senior Project Manager October 1, 2012.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Air Estates/Bald Eagle Estates) Improvement Project December 13, 2010.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Capital Improvement Plans: Providing a Blueprint for the Community Bill Goldy, Associate Principal/Senior Planner David Doxtad, Associate Principal/Civil.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
3TB Project Review Tax Increment Financing (“TIF”) Overview January 25, 2013.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Shepherd University WV Route 480 Pedestrian Underpass August 3, 2011.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Aires Estates/Bald Eagle Estates) Improvement Project October 11, 2010.
Incentives & Infrastructure  Estimated incentives and Infrastructure cost: $87,000,000  We will have a Development Agreement with Microsoft that will.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
1 st Quarter 2015 Financial Report City Council Meeting June 11, 2015.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
Outline  Board Direction  Tasks Completed  Recommendation.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Transportation Projects City Council Workshop May 14, 2013.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
City of Belmont Pavement Reconstruction Project October 15, 2014.
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
City of Johnston NW55th Avenue Improvements Public Open House June 24, 2014.
 Overview of Project  Economic Development Tools  Municipal Management Districts  Tax Increment Reinvestment Zones  Session Review, Q&A.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Community Improvement Districts County Counselors Association of Kansas Annual Meeting November 15, 2010 Janet S. Garms
Agenda Updates to Driveway and Sidewalk specifications and permits
Week 3, March 13, 2017.
City of Johnston East of Merle Hay Road Infrastructure Improvements
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
Location Map.
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
SE 12th Street Roadway Improvements February 8, 2005.
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Subdivision Applications
City of West Fargo special assessment forums
Presentation transcript:

City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015

1. Background 2. Street Special Assessment Agenda

 Planning Process ▪ Initiated October 2012 ▪ Steering Team ▪ Public Information - 6 Mtgs  Develop a Series of Projects  Methodology of Financing ▪ General Obligation ▪ Sanitary Sewer Connection Fee ▪ Street Special Assessment 1. Background

1. Project Phases, Schedule and Costs Project Phase Description Project Schedule Design/Construction Total Project Costs Phase 1A Sewer Extension to NW 57 th Avenue Complete/Spring 2015 $780, est. $893, (actual) Phase 1BNW 55 th Avenue Summer 2014 to Spring 2015 Summer/Fall 2015 $3,560, est. 3,236, (opc) Phase 2NW 57th Avenue Summer 2015 to Spring 2016 Summer/Fall 2016 $4,020, est. Phase 3NW 54 th Court (south) Summer 2016 to Spring 2017 Summer/Fall 2017 $3,100, est. Phase 4 NW 60 th Avenue NW 54 th Court (north) NW 61 st Street Place Summer 2017 to Spring 2018 Summer/Fall 2018 $5,780, est. TOTAL $17,240, (org. est.) 17,030, (current) All Numbers are Preliminary

1. Methodology of Financing Type of Project CostsFinancing Tools Water Water Utility (All City Rate Payers) Storm Water Storm Water Utility (All City Rate Payers) Sanitary SewerConnection Fee Street Improvements Special Assessment (Benefited Property Owner) General Obligation ( All City Property Taxpayers ) Design, Environmental, Lighting, Sidewalk/Trails, Utility Impacts, Right of Way Costs General Obligation (All City Property Taxpayers)

1. Summary of Overall Project Financing Street Special Assessments (Paid by Benefited Property Owners) General Obligation (All City Property Taxpayers) 10% 79% 2% 9% Potential Initial Sanitary Sewer Connection Fees (Paid by Users) Potential Future Sanitary Sewer Connection Fees (General Obligation until Connection) Total Project Costs ($17,240,000) All Numbers are Preliminary

▪ EMHR Special Assessment Policy (Jan. 20, 2015) ‐Determines what items will be assessed (32%) ‐Pavement removal, clearing and grubbing, excavation including topsoil, subgrade preparation or treatment, PCC paving, PCC driveways, erosion control, surface restoration and stabilization, traffic control, pavement markings, and permanent roadway signing will be assessed ‐Determines what items will not be assessed ‐New storm and sanitary sewers, water mains, sidewalk improvements, engineering fees, legal expenses, administration, street lighting, private utility relocations or right-of-way costs will not be assessed ‐Consistent with what has been communicated w/ Residence 2: Street Special Assessment

2. Range of Special Assessments 32% of Eligible Street Assessment StreetProject Cost Eligible Street Special Assessment MinimumAverage80%Maximum Phase 1A (Trunk) $ 780,000.00$ 0.00 N/A NW 55th Ave $ 3,236, $ 1,076, $ 1, $ 8, $ 10, $ 20, NW 57th Ave $ 4,020, $ 1,224, $ $ 6, $ 9, $ 12, NW 60th Ave $ 2,430, $ 774, $ $ 5, $ 7, $ 9, NW 61st Pl $ 1,350, $ 322, $ 6, $ 7, $ 7, $ 8, NW 54th Ct $ 5,100, $ 1,488, $ $ 7, $ 10, $ 14, TOTAL $ 17,240, $ 4,993, Does Not Include Non-Residential Land ClassificationsAll Numbers are Preliminary and on a per lot basis