Gas Regional Initiative – North West Region RCC meeting The Hague – 5 th July, 2010 Secondary capacity markets Project update.

Slides:



Advertisements
Similar presentations
Secondary Market with Transmission Capacities ČEPS, a.s. 11/2006.
Advertisements

Classification: Internal Status: Draft Statoils view on the ERGEG GRI Secondary Capacity work Helga Franse – EU & Regulatory Affairs Stockholm – 26 November.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Gas Regional Initiative – North West Region The Hague 13 December 2007 Day Ahead On x-borders of 2008 Presentation to the RCC.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Gas Regional Initiative - Region North / North-West Stakeholders Group Meeting The Hague, October 9th, 2006.
European Commission Slot allocation at Community airports Infrastructures and Airports Unit Klaas Pel.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting.
Gas Regional Initiative – North West Region London 14 November 2008 Chair: Joachim Gewehr Capacity Project C1 Short-Term Capacity (STC) Initial findings.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
Number of players The number of players at wholesale level is very limited (more then 97% of sources /production + import/ in one /incumbent/ hand) New.
BDEW Bundesverband der Energie- und Wasserwirtschaft e.V. German Shipper Position Proposals for improving secondary markets of capacity based.
14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.
Pilot Project on Market Coupling PEG Nord / PEG Sud 3rd Workshop on Gas Target Model London 11 APRIL 2011.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
Open market coupling 1 Open Market Coupling 2nd Miniforum/ Stakeholder Meeting in ERI Northern Europe Copenhagen, June 27, 2006 Dr. Frank-Peter Hansen.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
Electricity trading in emerging markets Vienna Economic Forum Tirana, Albania 8-9 June 08 1 EXAA 2008.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Gas Regional Initiative – North West Region Governmental Meeting 6 May 2010 – The Hague Secondary capacity markets Project update Betsy ANNEN – CRE Bernhard.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
1 IG Meeting Milan, 18 th July 2008 Cost of Firmness of Capacity.
Directie Toezicht Energie 1 Gas Regional Initiative North West Maya van der Steenhoven Programme Office 28 April, 2009 Bonn.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
Gas Regional Initiative – North West Region Paris Workshop 11 May 2007 Workshop on Interconnections & Primary Capacity Market Kick-off Meeting on IP 14.
Capacity Allocation and Congestion Management Monitoring results & proposal for new measures Stefanie Neveling (BNetzA) Benoît Esnault (CRE) Madrid Forum,
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Bonn Workshops 8 and 9 Feb Gas Regional Initiative North West Region Balancing workstream Workstream leader: Cemil Altin (Ofgem)
6th Stakeholder Group meeting Stockholm – 26 November 2009 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer,
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
13th March 2009, Bilbao GLE Workshop on LNG ERGEG MONITORING GGPLNG Rocío Prieto.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Background and Process
Regulators’ update on Congestion Management and Balancing
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Presentation transcript:

Gas Regional Initiative – North West Region RCC meeting The Hague – 5 th July, 2010 Secondary capacity markets Project update

2 RCC meeting The Hague – 5 th July, 2010 Survey  Survey process 6-week consultation process (from 6 April till 21 May) Questionnaire posted on the ERGEG website and publicized by platforms, associations (EFET, BDEW, bne, Dutch Energiened) and Program Office Confidentiality guaranteed  Threefold objective of the survey to assess shippers’ interest in secondary markets to understand the way secondary markets are used by shippers: i.to understand the reasons which make a shipper sell or buy secondary capacity ii.to understand the reasons which prevent a shipper from selling or buying secondary capacity iii.to identify the obstacles encountered if not successful. to evaluate shippers’ expectations about the functioning and design of the existing platforms  Strong interest from the market 34 respondents representing 10 different countries (Germany 31% ; United- Kingdom 24% ; France 12%)

3 RCC meeting The Hague – 5 th July, 2010 Shipper’s interest in secondary markets  High level of familiarity with the issue of secondary capacity trading 85% has already traded or tried to trade secondary capacity A large majority follows with interest this topic (73%)  Half of respondents has integrated secondary capacity trading in their daily management process (41%) In which way did your organization focus on secondary trading in the past?  Secondary capacity trading perceived as: - the most market-based solution for the use of capacities by other parties - an important element of an efficient gas market - wish to see the liquidity increase - another way of exploring additional business opportunities

4 RCC meeting The Hague – 5 th July, 2010 Use of secondary markets: seller side  Why selling? Decreasing sunk costs of firm capacity (59%) Optimizing market positions by selling the little capacity surplus usually kept to overcome maintenance restrictions, to face growth in portfolios, to arbitrate between different sourcing (15%)  Why not selling? Restricted coverage of the interconnection points by platforms (15%) Value of secondary capacity (15%) −No economic interest in selling considering the overall value chain −Price caps Functionalities (9%): counterparty choice, lead times Number of answers; percentages calculated on the total of answers

5 RCC meeting The Hague – 5 th July, 2010 Use of secondary markets: buyer side  Why buying? When primary markets do not satisfy shippers’ needs To dynamically manage portfolios Number of answers; percentages calculated on the total of answers Portfolio Primary  Why not buying? Never faced a scarcity situation (21%) Impossibility to trade on both sides of an interconnection points (15%) Restricted coverage of interconnection points by platforms (9%) Others: fees too high, inappropriate lead times, products, legal risk

6 RCC meeting The Hague – 5 th July, 2010 Use of secondary markets Evaluation of success on seller and buyer sides SELLER SIDEBUYER SIDE 44% of respondents declare to be generally successful or successful to a degree when trying to sell capacity 32% of respondents declare to be generally successful or successful to a degree when trying to buy capacity - No need of the offered capacity at the concerned IPs - Low value of capacity does not incentive seller - Other priorities of sellers who prefer k eeping flexibility a) to use capacity to cover sudden changes in supply and/or demand b) to cover contractual max volumes stated in LT contracts - Separate products on both sides of the border and no operational rules harmonization - Transaction process (complex and time- consuming)  platforms must be developed with appropriate IT system and standard contract frameworks - Interconnection points coverage - Not sufficiently mature market - Separate products on both sides of the border and no operational rules harmonization

7 RCC meeting The Hague – 5 th July, 2010 Platforms design: shippers’ expectations (1/2)  Counterparty issue Strong advantages for cleared trading: centralized web-based platform allowing for anonymity, non discrimination, transparency and flexibility. Removal of credit and liability risk. Cost / benefits analysis needed: additional costs compared to a “bulletin board” system. Shippers also in favor of a bilateral trading with ex-post counterparty transparency  Different realities behind clearing system. What costs? What role for TSOs?  Products Limited set of products used in priority by shippers: year-ahead, month-ahead and day-ahead Idea of standardizing minimum amount of capacity (lot size) supported by half of shippers if consistent with gas markets standards. The others want to keep flexibility. Standardized set of products debated. Shippers advocate for combination of products  Standardization primary national markets / secondary national markets or regional approach inter-platforms

8 RCC meeting The Hague – 5 th July, 2010 Platforms design: shippers’ expectations (2/2)  Interconnection points Large variety of answers Some of the most quoted points are already covered by platforms. May imply a deepening of efforts on these points Extension of coverage to others  Transfer of capacity Majority in favor of a “capacity transfer” method (74%) or “capacity assignment” method (50%) Capacity sublet / usage disqualified  Others Divided position on allocation method: auctions and/or continuous trading No clear position on operating hours

9 RCC meeting The Hague – 5 th July, 2010 Conclusion Linking primary and secondary markets ● Shipper, regulators and other stakeholders should jointly define the target model for capacity products. Primary and secondary markets cannot be structured separately. ● One aim of the project: to achieve operational consistency with the proposals developed by ERGEG in CAM framework guidelines and the guidelines on congestion management procedures ● Encompassing target model: entry / exit models, standardized capacity products, combined products.

10 RCC meeting The Hague – 5 th July, 2010 Thank you for your attention Betsy Annen – CRE Bernhard Schaefer – E.ON Ruhrgas