SCX5 – Proposed New Intermediate floor over existing CMS Rack Room J.Osborne CEMESTE 20 Feb 2008.

Slides:



Advertisements
Similar presentations
The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Advertisements

Exterior Window and Door Frames
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. INTRODUCTION HOW DOES A CONTAINER BECOME HOUSE? DESIGN EXAMPLES A NEW HOME IN 12 STEPS TECHNICAL SPECIFICATIONS.
Stroke Lab Hospital Floor Plan.
Architectural Drawing
GE-final House of fun………... ROOF Solar power and wind powered house 4 wind intakes that transport collected wind into a wind turbine to produce electricity.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Employment Level: 375+ Contract Relationships: 300+ Midwest Operations: 4 States (IA, IL, OK, CO) Sow Inventory: 60,000+ Finish Inventory: 750,000+
HVAC523 Heat Gain. Heat First law of thermal dynamics states that HEAT TRAVELS FROM HOT TO COLD. 95 degree outside air will flow through the building.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Building Codes and Interior Design
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
State of Virginia’s Adoption Uniform Statewide Building Code –Adopts model codes by reference Family of I Codes 2003 edition NEC 2002 edition –Statewide.
HVACR416 - Design Heat Loss / Heat Gain Part 2. External Loads The greatest external load is the sun. The suns heat can get into a building in one of.
Building Plans.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
Why can’t heat be converted completely into work?.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Identify the unique construction factors of single-family dwellings. Recognize the basic problems.
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
ROOFING MATERIALS, INSULATION, AND HOUSING SYSTEMS.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
PH Building Assessment Buildings 15, 22, 23, 154, 167 Safety Analysis.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
NUMBER OF FLOORS: means the number of floors that are counted from the vertical section of a building at a point where the building has the most floors.
AddressBuilding Orientation Building Materials Colour of External Building Window size, type and placement Window Protection Out door area and land scaping.
Housing Service Review Plan for the coming period 24 November 2014.
EN-CV interventions during YETS
A Prefabricated Framing and Enclosure System. The Problem.
CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD CHATSWORTH HSChatsworth.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
LD-MCR ( Lower Deck Mobile Crew Rest )
ICL 26/05/2010 Relocation of electronics at Pt5 Summary of week 22 + roadmap Contributions from GS-SEM, EN-MEF, EN-EL, EN-CV, BE-ASR, TE-MPE, PH-CMX, TE-EPC.
Windows and doors Why do we have windows? – Light – Ventilation – Beauty – Energy (heat and cold, in and out) – View, etc.
Facilities for a Quality Child Development Program Child Services II.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
KRJ Planning and Research-- We plan learning environments as comfortable, resource-efficient knowledge incubators. Control over… Air temperature Radiant.
The proposed trailer will have the capability to be pulled by a GSA pick-up and LMTV. The new trailer will also be wired with the proper type of electrical.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
“kicking on to the finish”
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
FIRE PROTECTION & SECURITY in ELI Beamlines
Prepared by : Reham Asaa’d Supervisor : Arch. Moa’yad Salhab
Objective 6.02 part 2: Recognize components of construction
Equipment simplified model SMR UR safety
Objective 6.05: Types of Architectural Drawings
Proposed New CMS Conference Room on first floor of SHL
Budget specification EHN1 Extension: Infrastructure (WG2)
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
Graduation Project 2 Redesigning a Villa
Objective 6.05: Types of Architectural Drawings
Commercial Construction Projects
INTD 405 Modern Practices in Interior Design PLANS
HANDICAPPED PEOPLE RESIDENT
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
Introduction.
Planning & Organizing Your Virtual Model
STEEL PLATES.
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

SCX5 – Proposed New Intermediate floor over existing CMS Rack Room J.Osborne CEMESTE 20 Feb 2008

SCX5 – Proposed new intermediate over 1 st floor CMS Rack Room

SCX5 – Existing 1 st floor CMS Rack Room – disruption during works

SCX5 – As-built 1 st floor

SCX5 – As-built roof

SCX5 – As-built cross sections

SCX5 – New Intermediate Floor – Steel stucture with ‘DALTEC’ Floor plates (as used in USC55…..350kg/m2)

SCX5 – New Intermediate Floor – Building permit exists

SCX5 – Existing 1 st floor CMS Rack Room

False Floor panels ‘DALTEC’

Underfloor plate

Draft Cost Estimate CE works : Remove/re-install false ceiling, dust screen, new wall, door… J.Osborne 150kchf Metallic Structures and false flooring D.Parchet 200kchf Modifications to existing Ventilation systems B.Pirollet 200kchf Heating and cooling for office space B.Pirollet 100kchf Internet E.Sallaz Electrical modifications, new lighting, power R.Lassausaie Safety equipment : Water Mist Smoke Detection Modify position of automatically opening windows C.Schaefer Furniture/computers etc ? Total650kchf

Other possible areas in SX or SL53 would have to wait until after SX lowering decision is finally taken