Beam transfer considerations for LAGUNA Angelina Parfenova, W. Bartmann, L. Ducimetiere, B. Goddard, V.Kain, M.A. Kowalska, M. Meddahi, B. Puccio, F. Velotti.

Slides:



Advertisements
Similar presentations
11 October 2006Basic Layout of LER G. de Rijk1 Basic Layout of LER  The basic idea  VLHC type magnets  LER in the LHC tunnel  Layout  LER experiment.
Advertisements

FCC-hh Injection and Extraction
ALPHA Storage Ring Indiana University Xiaoying Pang.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
Linac4 Beam Commissioning Committee PSB Beam Optics and Painting Schemes 9 th December 2010 Beam Optics and Painting Schemes C. Bracco, C. Carli, B. Goddard,
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
March A. Chancé, J. Payet DAPNIA/SACM / Beta-beam ECFA/BENE Workshop The Decay Ring -First Design- A. Chancé, J.Payet CEA/DSM/DAPNIA/SACM.
100 MeV- 1 GeV Proton Synchrotron for Indian Spallation Neutron Source Gurnam Singh Beam Dynamics Section CAT, Indore CAT-KEK-Sokendai School on Spallation.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Page 1 Workshop 01/2011 The Accumulator/Pre-Booster Bela Erdelyi Department of Physics, Northern Illinois University, and Physics Division, Argonne National.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
Considerations on laser-p+ beam merging for CB, BG, PM.
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
MTE vs CT D.Manglunki for BE/OP - pictures from M.Giovannozzi - details in “Fifty years of the CERN Proton Synchrotron (Vol I)” CERN
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Primary beam production: progress - Extraction from LSS2 - Switching from TT20 at 100 GeV B.Goddard F.Velotti, A.Parfenova, R.Steerenberg, K.Cornelis,
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
FCC DUMP SYSTEM W. Bartmann, B. Goddard, R. Ostojic FCC Dump Meeting, 14 th Jan
Preliminary Design of Electron Beam line F. Velotti, C. Bracco, B. Goddard and M. Meddahi.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
Issues Concerning Different Beam Lines Integration C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements: WP3 and.
Optimization of beam envelop at the injection point of PS Chenghui Yu Jan. 30, 2012.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Optics considerations for PS2 October 4 th, 2007 CARE-HHH-APD BEAM’07 W. Bartmann, M. Benedikt, C. Carli, B. Goddard, S. Hancock, J.M. Jowett, A. Koschik,
Optics solutions for the PS2 ring February 11 th, 2008 LIS Section Meeting Y. Papaphilippou.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
CN2PY Proton Beam Transfer B.Goddard reporting for F.Velotti, A.Parfenova, R.Steerenberg, K.Cornelis, W.Bartmann, V.Kain, E.Carlier, V.Mertens, A.Alekou,
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
LAGUNA Primary Beam: Extraction and Transfer B.Goddard TE/ABT 23/01/2013 Reporting on behalf of many colleagues 400 GeV – Extraction from SPS – Upgrade.
J-Parc Neutrino Facility Primary Proton Beam Design A. K. Ichikawa(KEK), Y.Iwamoto(KEK) and K.Tanabe(Tokyo) et.al. 7 th Nov. 2003,
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
HP-PS injection and extraction status W. Bartmann, B. Goddard HP-PS meeting, 20-November 2013.
Optics considerations for PS2
PS2 WG Injection and extraction systems Basics and assumptions
Primary Beam Lines for the Project at CERN
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
J-PARC main ring lattice An overview
LINAC4 ADVISORY COMMITTEE
A.Lachaize CNRS/IN2P3 IPN Orsay
Options and Recommendations for TL and Dumps
Emittance growth AT PS injection
Large Booster and Collider Ring
Junji Urakawa (KEK) for ATF International Collaboration
Multiturn extraction for PS2
FCC-hh injection group 7
Beam Injection and Extraction Scheme
Strip-line Kicker R&D at KEK-ATF
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
Progress of SPPC lattice design
LHC (SSC) Byung Yunn CASA.
PS2 Injection/Extraction Layout
Collider Ring Optics & Related Issues
Multi-Turn Extraction for PS2 Preliminary considerations
Negative Momentum Compaction lattice options for PS2
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Negative Momentum Compaction lattice options for PS2
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Beam transfer considerations for LAGUNA Angelina Parfenova, W. Bartmann, L. Ducimetiere, B. Goddard, V.Kain, M.A. Kowalska, M. Meddahi, B. Puccio, F. Velotti TE-ABT, CERN, Geneva, Switzerland LAGUNA-LBNO General Meeting in Hamburg February 2013 DESY Hamburg

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova 400 GeV extraction from SPS TT20 switch and 400 GeV beamline 4 GeV H- injection for HP-PS Extraction System HP-PS: basic considerations Conclusion Contents 2

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova 400 GeV extraction from SPS 3

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Non-local extraction over 2.2 km of SPS TT20Aperture limitations SIMULATION: IDEAL CASE 4

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Extraction tests LSS6->LSS2 Carried out on 22 October 2012 HiRadMat cycle at 440 GeV (due to interlock constraints) New SPS tune of to get good kicker- septum phase advance 6.5  m emittance, 1-2e11 p+ in a single INDIV bunch LSS2 electrostatic septum ZS retracted Machine settings: 5

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Beam into TT20 at first attempt MKE (LSS6) on at kV (HiRadMat nominal values) MST on at 0.2 mrad MSE on at 1.9 mrad SIMULATION : ZOOM to LSS2 (using reference values) 6

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Beam extraction Last turn in SPS captured with multiturn application MKE6LSS2 2.2 km MEASUREMENT 7

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Apertures No losses seen in arcs 61 and 12, nor in LSS1 scanned area without beam loss MEASUREMENT in LSS2 8

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova SPS interlocking Crucial to control overall machine parameters New ‘extraction loop’ required (as for CENF) 9

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova TT20 switch and 400 GeV beamline 10

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova An example: switch from TT20 4 switch locations were investigated – Note: Option 2 chosen for CENF (≤100 GeV) Before vertical bend  2 2.At horizontal bend  2 3.In vertical bend  2 4.After splitter for 400 GeV LAGUNA for CENF SPS ~ 40 m height difference 11

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Option 1: Switch before vertical bend a 2 Only realistic option for 400 GeV (long drift needed) 6x MBS-like switch magnets Minimal changes on existing TT20 systems Junction cavern exactly under ‘decheterie’ (integration issue) Considerations: 12

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Option 1: Before vertical bend  2 13

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Beamline arc cells Take as starting point arcs for CNGS Minimum bending radius ~960 m (400 Gev) Assumptions – Emittance hor: 12  m – Emittance vert: 8  m – Orbit H/V: +/-4  (  max ) mm, – Mechanical/alignment: 0 mm – Dp/p (half): 1.35e-3 – Beta-beating: 20% on  Somewhat pessimistic Somewhat optimistic Somewhat pessimistic 14

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova CNGS TT41 magnet parameters Quads QTG: -50x40 mm aperture -2.2 m length -34 T/m gradient -About 20 magnets (+10 ‘others’) Bends MBG: 6.92/6.32 m (total/magn) length GFR : +/-37 mm, +/- 17 mm 1.91 T: 35.7 mrad bending at 100 GeV and 9 mrad at 400 GeV About 75 magnets 15

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova LAGUNA switch and beamline geometry Switch on TT20 upslope Assume 8x new MBS magnets at 1.65 T Assume 44x CNGS main dipoles at 1.85 T (one powering family but tilted with 2 different angles) 16

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Vertical plane 400 GeV CENF LAGUNA Target? switch 17

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Horizontal plane 400 GeV CENF LAGUNA Target? switch 18

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova 4 GeV H- injection for HP-PS 19

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Injection drift layout m H- H0 Stripping foils p+ (to a beam dump) 20

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova PS2 Optics perturbation by H- chicane Effect of the vertical focussing from the chicane magnets Compensation by separate powering of the quadrupoles 21

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Injection: H- multi-turn, 4.0 GeV H- injection for beam from SPL – Injection chicane with foil (and possible laser stripping section) – Fast orbit bumps (horizontal and vertical) for phase space painting during injection process – Septa, beamline and dumps for the partially or unstripped H0 and H- beams are needed – keep low dispersion from chicane magnets (<20 cm) to decouple longitudinal and transverse effects This is a difficult system at 4 GeV! – Limit on maximum dipole field H- beam can traverse, to avoid magnetic stripping and beam loss – 2 – 5 % of unstripped H- needs dedicated extraction septum and dump – Foil physics and beamloss control… – Dumping of stripped electrons…. – Accommodation of laser stripping (laser + foil option) 22

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Extraction System HP-PS: basic considerations 23

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova HP-PS LSS LSS length is 73.5 m  -functions, dispersion and phase advances 24

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova PS2 HP-PS ~ 20 m kickerseptum ~ 90 o (~ 70 o o ) Comparision HP-PS LSS with PS2 LSS ~ 25 m 25

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Estimation of X open is estimated as a  of ~ 5 beam sizes at injection (4 GeV)  x inj. =  (  x,Sept  x inj. )  6.5 mm ~ 5 beam sizes at extraction (70 GeV)  x extr. =  (  x,Sept  x extr. )  1.5 mm ~ 5 mm fixed septum width ~ 1 mm uncertainties due to mechanics misalignments ~ 4 mm orbit distortion  x  x kickerseptum  x  x Kick centre X open 4 GeV:  rel.  5,  rel.  GeV:  rel.  76,  rel.  Normalized   m (talk F. Antoniou)  x =0.29 (sin.  x =0.97) Septum entrance the kick strength and opening at the magnetic septum X open  50 mm =  (  x, kicker  x, Septum )sin (  x )  kicker,  kicker = 2.1 mrad 26

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Kicker parameter table (c.f. PS2) ParameterUnitPS2 HPPS EnergyGeV5070 Anglemrad RigidityT.m Required B.dlT.m Individual magnet lengthm Number of magnets810 Total Magnetic lengthm Total installed lengthm Magnet inductanceH E E-06 Magnet capacitanceF E-081.5E-08 System ImpedanceOhm Filling timens Rise/fall timens Pulse lengthμs24.5 Aperture height (with 20 mm for screen)mm9075 Aperture width (with screen)mm12096 Maximum voltagekV Peak currentkA3.242 Gap fieldT

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Discussion Extraction kicker system will be large – 10 magnets – 17.5 m installed length…most of the drift Rise time of minimum 238 ns (filling time + switch) – Will be worse with impedance screening – Should assume 250 ns Optimization directions? – More magnets possible for faster rise time But adds cost, plus installed length, man power e.g. 20 magnets gives ~150 ns in 22.0 m (space problem) But this would be extremely expensive system Also effect of shielding proportionately worse – Larger beta functions at kicker and septa? e.g. 35 m (less kick strength)? BE/ABP 28

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Conclusions 29

February 26 th 2013 – LAGUNA-LBNO General Meeting – Accelerator and Beamline Session – A.Parfenova Conclusions 400 GeV beam from SPS – LSS2 Extraction using LSS6 MKE kickers demonstrated at 440 GeV (backup option only for 100 GeV from LSS1) – TT20 transport no issue – Switch from TT20 some 90 m before CENF switch – Arc geometry to LAGUNA target looks OK – Recuperation of TT41 magnet design should be possible Injection and extraction from HP-PS – 4 GeV H- system defines LSS layout (24 m drift), studied in detail for PS2 at 4 GeV and can be directly adapted for HP-PS – Extraction and kickers: basic considerations look OK 30