PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, 2015 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low Mass Tapes 12 different lengths were produced for barrel.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
1 Physics of Compressed Baryonic Matter 12 th CBM Collaboration Meeting R&D ON MICRO-CABLES FOR BABY SENSOR RADIATION TEST MODULE October , 2008.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Low Mass Rui de Oliveira (CERN) July
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Comments on ladder structure 5 Feb Toru Tsuboyama.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, 2015 (updated on Jan. 23) 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly 10 Sept C. Irmler (HEPHY Vienna) 8 th Belle II VXD Workshop OS5.905.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
QCG Report Francesco Forti University and INFN, Pisa.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
Status & schedule of ladder parts production Oct. 2, 2014 Koji Hara (KEK)
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Mechanical robustness & associated tension at the DSSD slant part connection Mar-5 th 2013 B2GM KEK S. Uozumi (KNU), T. Tsuboyama, N. Sato (KEK)
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
FADC/Hybrid cable production 21 Jan 2015 T. Tsuboyama.
Florian Buchsteiner (HEPHY Vienna)
SVD Electronics Constraints
Bonding study of wrapping part of PA1/2
Ti/SS transitions A.Basti INFN-PISA*
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Katsuro Nakamura Sep. 10, 2015 VXD meeting
ob-fpc: Flexible printed circuits for the alice tracker
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
Gluing jigs for Demonstrator
SVD group organization, schedule, milestones
Presentation transcript:

PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications

PA0 and Origami PA0 problems – Cracks – Shorts between pads – Design to keep bonding pad length Available size of the bias hole – Shrinkage (likely by heat) % Not uniform?? Origami status – Produced at Taiyo – Preserved as sheets before cutting and electrical test – Need to confirm Origami+z prebending method (performed by SVD group) Any modification necessary from the previous method? Electrical test of PA0 – 4 probe measurement possible for PA0 alone and PA0 glued on Origami – Test condition to suppress probe traces Practice whole procedure PA0 from Taiyo  Electrical Daiei  PA0 + Origami Taiyo  Electrical Daiei   test by

Crack – Long straight design – Acrylic glue – Laser cutting Shorts Still 36KΩ! Still 36KΩ! Carbonized glue under the top base by laser cut touches the metal line New design covered by coverlay on the bottom layer

PA0 latest Design by Taiyo Released for review by SVD group on Jan. 19 – Followed our request on the pad lengths and bias hole positions dxf files on PATaskForce twiki page

Discussion item: Shrinkage of PA0 length Measurement of length between alignment marks on PA0 – Design : mm – At HEPHY Assembled by REPIC : – mm – At IPMU Mockup (full process but no reflow soldering) : ~ mm Assembled by REPIC : ~ mm  Must understand the shrinkage Need to change the process? Non-uniform shrinkage ? “No problem” by HEPHY reflow (Vapor Phase) – No or uniform shrink? Corresponding to the typical thermal shrink rate of polyimide ~ ℃ – Seems more or less inevitable

Heating in Origami+PA0 production Procedure 1. Gluing of PA0 coverlays and 2 layers by heat pressing at Taiyo 2. Glue PA0 and Origami by heat pressing at Taiyo 3. Reflow soldering of Origami at REPIC Q) Is it possible to do 1  3  2 ? A) No. Heat pressing becomes impossible after mounting parts on Origami. (Taiyo) Heat pressing at Taiyo – Gluing of coverlays, top + bottom, PA0 + Origami – 160 degrees, 40 minutes, 45-50kg/cm 2 Reflow soldering at REPIC (Saiden Device) – degrees (maximum temp.), 4 minutes

Reflow at REPIC (Saiden Device) Origami fixed on G-10 board with Kapton tapes Board carried by conveyor Send to oven – 3 heat cavities set to 160 degrees (for preheat) 160 degrees (for heating up) degrees (for soldering) Temperature monitored by sensors inside – Length : about 3m – Speed 3m/4min. ~ 3m

Electrical Test Verified possibility to test PA0 alone and PA0 after glued on Origami – 4 probe resistance measurement – With “soft landing” probe Probe traces and scratches found  need to be solved Visited the company again and discussed, tested PA0 pieces together on Dec. 19 – Scratches not observed on Tokai Denshi PA Tested as a sheet  seems to be better and uniform vacuum chucking Different machine (No. 2 and No. 4) – Some areas have clear traces, some areas do not Not depending on where the PA0 placed on the stage  Dependence on the machine or the probe? – Probe speed can be changed  Improvement seen by reducing the probe speed Testing PA0 test with different speeds – Machine to be used for the final test condition Isolation connectivity < 100Ω

Probe speed 30% Speed 10% Testing more slower speed with the same machine used for Tokai Denshi PA test recording the S/N and use count of the probes Down to speed setting of 3 ~ 5% Tested PA0 will be returned next week  will be checked by microscope Still need a few more iteration to reach to the final test condition PA0 alone and PA0 + Origami could be a bottle neck, if failed to converge to the good test condition 1-2 months

TaiyoSaidenHayashi Watchworks Origam FPCReflow solderingAPV gluing + wire bondingH/C-shape gluing weeks 1Batch0 12 pcs pcs Reproduction 141 pcs Batch1 47 pcs pcs 8 9 Batch2 47 pcs pcs Batch3 47 pcs pcs REPIC Taiyo Origami+PA0 production + assembly (incomplete) schedule H/C-shape gluing work at REPIC is not yet agreed / decided. REPIC proposes to do by them before APV gluing/bonding for safety of connectors Has been done at KEK by Tsuboyama-san and Sasaki-san after delivery from REPIC Electrical test and Origami +Z bending are not included yet in the schedule batch0 Mass reproduction -z 6 ce 4 +z 2 1 batch = -z 16 ce 22 -z 9

PA0 new design evaluation 1-2 weeks PA0 test production 2 weeks Evaluation of PA0 sample2 weeks – Crack-free – no shorts – Bonding pad lengths, bias hole effective size – Stress test Sign-off the final specification of PA0 + Origami reproduction1-2 weeks accompanied by – Electrical test condition with minimum probe traces – Origami +z bending method – H/C-shape gluing specification update Origami+PA0 batch0 production3 months Evaluation of batch0 Origami1 months Mass reproduction (3 batches)3-5 months Input of Discussion : Taiyo PA0 + Origami Possible Schedule 2015 Jan 2015 Feb 2015 Mar 2015 June 2015 July 2015 Oct-Dec. contingency of a few weeksAssumed electrical test 2 weeks

1-layer 3-row PA0 Production drawing prepared by Tokai Denshi for SVD group’s review – Distributed to PA taskforce Jan. 16 – Uploaded to PATaskForce twiki page Planning test production (10 pieces) – 1.5 month for production – Payable by KEK budget in 2014 JFY If delivery before end of Mar.  If approval of SVD made by mid of Feb. at latest. Open issue : how and who glue it on Origami

PA flex Signoff the full specification document by SVD – Fix Pad width minimum limit by SVD measurement 30 µm? By CMM at IPMU – Bonding on PA glued on Airex + IPMU  result by Friday? Must agree with Tokai Denshi on the full specification document translated in Japanese – Now translating By end of Jan.

Type#required11-Mar17-Mar24-Mar30-Mar 3-Apr7-Apr10-Apr14-Apr #delivery PA010 3PF PF PB PB PA PA PF PF PB PB Assumed the production start on Feb. 2 Not final in terms of payment and contract # pieces in batch may change To wait for budget open in the beginning of JFY To pay more with 2014 budget KEK and support from IPMU Still discussing Need to be delivered in May to wait for the budget open in the beg. of 2015 fiscal year. PA delivery schedule ver by Tokai Denshi

品名要求数量3月11日3月17日3月24日3月30日 5月11日 納入数量 PA010 3PF130 3PF230 3PB130 3PB230 PA PA PF PF PB PB PA delivery schedule assuming the start on Jan. 26 Better for budget Consume maximum in 2014 JFY budget Making final signoff and agreement with the full document seems not realistic