QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

HQ Structure – Mechanical Model J. Schmalzle 4/8/13.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev May 7, 2007.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LQ Winding and Curing Tooling Internal Review F. Nobrega, N. Andreev April 9, 2007.
Long HQ coil drawings now available 1 Miao Yu. Dead voltage taps in TQ/LQ/HQ coils Inner layer: 24, outer layer: 12 (33 inner/23 outer per coil for TQ/LQ/HQ)
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
CPA Micarta Based Rahul Sharma / Bill Sands. The present design shown in this document is based on the use of Micarta as the base material this will likely.
LARP Collaboration Meeting Racetrack Coil Fabrication
ECC Clément Lorin – Maria Durante Acknowledgements: Fresca2 team.
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
L/R Coil Asymmetry Coil Fabrication Working Group Trey Holik Wednesday, June 3 rd 2015.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
DUNE APA Overview for SBND Synergy Discussion Lee Greenler University of Wisconsin Physical Sciences Lab September 2, 2015.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
1 LHC Hi-Lumi QXF Proposal for Coil Impregnation M. Anerella, J. Schmalzle, P. Kovach June 11, 2015.
First Wall Panel - Overview
QXF Coil Fabrication & Tooling Reaction / Impregnation
Coil Design and Fabrication
Overview – Nb3Sn Furnace
HQ Coil 19 Test Impregnation
SQXF Mirror QXFSM1 Strain Gauges
QXF Cable Winding Test and End Parts Design
11 T dipole coil features and dimensions
FRESCA2 Update on the dipole design and new calculations
Internal review of the 11T dipole reaction fixture and impregnation mould Outcome of the meeting F. Savary 19 October CERN.
EC Assembling with Assembly Stand of THU
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
NISSAN Z31 & Z32 OIL PUMP DIFFERENCES
Presentation transcript:

QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13

QXF Reaction / Impregnation Fixtures Fixture design follows scheme used for LQ, HQ and LHQ coils: – Material – 304 stainless steel. – Full length base plate, top plate and side rails. – Form blocks and mandrel pieces are short blocks (~2” / 50 mm). – Thin stainless steel liner inside form blocks (.020” /.5mm). – Alignment pins into keyway of coil pole. – Longitudinal seal between liner and baseplate. – Fixture length ~172” / 4.4 m – Weight ~5000 lbs / 2300 kg – Individual form block weight 22 lbs / 10 kg. Some open questions: – Coil overall length? – Final cable / coil cross section? JDS - 4/9/2013 Nominal Coil Dimensions: Inner Radius = 2.953” / 75 mm Outer radius = 4.464” / mm Room in Cavity for additional material (ie: trace, fiberglass, mica, mylar): Inner Radius =.010” /.25 mm Outer Radius =.020” /.50 mm 2

QXF Reaction Fixture Cross Section JDS - 4/9/2013 Top Plate Base Plate Form block Mandrel Side Rail Longitudinal Seal Coil 3

QXF Reaction Fixture Alignment pins through form block into keyway of coil pole. – 7 locations, approx 21“ / 540 mm spacing. JDS - 4/9/2013 Alignment Pin Set screw 4

QXF Reaction Fixture End saddle links, fit in slot in mandrel blocks, keep saddles in contact with coil turns during reaction. JDS - 4/9/2013 Endplates at both ends to close and seal the fixture, seals made from copper tubing. Short coil leads contained within fixture. 5

QXF Impregnation Fixture Fixture nearly identical to reaction fixture. Additional features to create epoxy tight seals. – Sealing Gaskets around alignment pins. – Access holes through top plate. – Bolts to compress seal. JDS - 4/9/2013 Bolts Gasket Compression Disc Alignment Pins Seals against liner 6

QXF Impregnation Fixture Coil leads exit through end plate. Rubber gaskets to seal around solder filled coil leads. JDS - 4/9/2013 Gasket Compression Disc O-Ring 7

Summary Preliminary design of long tooling underway. Need final coil cross section and length. Short tooling will utilize same fixture cross section. Detailed drawings to be competed. JDS - 4/9/20138