1 XCAL LED quality check and time alignment consideration CALO meeting 8.09.2009 Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.

Slides:



Advertisements
Similar presentations
AHCAL Saturation Study CALICE week – Casablanca, Morocco 2010/09/22 Jaroslav Zalesak Institute of Physics, Prague / DESY Study of single SiPM response.
Advertisements

1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ Proposal of the ECAL CW base modification + Anatoli, Michail ( Michail Soldatov.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 Calorimeter in G4MICE Berkeley 10 Feb 2005 Rikard Sandström Geneva University.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
Photon reconstruction and matching Prokudin Mikhail.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
TTF - ECAL Plenary in CMS week ECAL Stability Contacts: Marc Dejardin, Julie Malcles (laser)
SPD status and last operations A. Carboni, A. Comerma, D. Esperante, E. Picatoste et al. 08SEP2009Calo meeting1.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Pre-calibration of PM gain by photo-statistics
Analog FE circuitry simulation
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Preparation of LHCb for data taking
Instrumentation for Colliding Beam Physics 2017
Presentation transcript:

1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status with checking by LED timing scan tools  Comparison of the time measurements by two methods

2 XCAL LED quality check CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Last week on Friday after GCW the LED time scan data were collected for all CALO sub- detectors (see Calo logbook for a run reference). The reason was to check performance of all calo sub-detectors after HV control board firmware upgrade. Summary of the tests: HCAL HV and LED systems are in a good condition. One – two problematic channels were fixed (see Yury’s talk). Summary signal shapes on: /scratch/everyone/akonDATA/hcA- C_56526_ ECAL After HV board firmware upgrade it was found a few boards with low power supply, due to a bad contact into LV connectors (for details see Irina’s talk) and other problem with ECTELL_12 (for details see Stephane’s talk). All ECAL signal shapes on: /scratch/everyone/akonDATA/ecA-C_56535_ PS/SPD HV and LED systems are stable. Only one problem has been detected during the LED time scans. Explanation on next slide. The sub-detectors signal shapes on: /scratch/everyone/akonDATA/spd56569_calibr and /scratch/everyone/akonDATA/ps56569_calibr Still a few LED groups have a lit bit low intensity and could be tuned.

3 SPD LED quality check CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Problem with calibration signal shift by 25 ns. Few weeks ago Daniel found problem with LED timing. LED timing scan (run 54591) has been done and it was observed that there is 25 ns timing shift compare with previous runs. Richard and Federico investigated this and told us that they knew about the TFC problem because somebody complained about calibration data shifted by 25ns. Recipe has been corrected and new time scan done (run 56569). PS/SPD timing for LED monitoring is correct now. Run calibr_090817Run calibr_ ns 157 ns Shifted signals Remark: All recipe changes must have a track into logbook.

4 Comparison of the time measurements by two methods CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Introduction The CALO sub-detectors time alignment is performed with using the TAE events and asymmetry calculation for defining with more precision a signal arriving time. For this method an uniform signal shape is assumed. But this is correct with some error, due to a time alignment must be optimized for a flat top of the signals. An LED timing scan technique allows to measure an optimal time on the top of the signal and simultaneously calculate arrival time with asymmetry method. This allows to make comparison of these methods. Of course a PMT response on LED is a lit bit different then on particle, due to a light shape is defined by LED driver in first case and a WLS fiber decay time in other case (Y11 in CALO).

5 HCAL LED timing definitions CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] 1 % 25 ns T_0T_Next Asymmetry Time Flat Top Time FTWSignal Curve Fitting Function Asymmetry R = (Anext – At0)/(Anext + At0) Asymmetry Time (AT) is T_0 time, when asymmetry R = 0. Time (ns) ADC (cnt) Flat Top Time (FTT) is a maximum of the fitting function; Flat Top Width (FTW) is a time interval, where a signal change is less then 1 %. Signal shape of the FE integrator output

6 HCAL LED timing CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] HCAL integrator output signal shapes and asymmetry R+1 curves Linear fit of the asymmetry curve: (R+1) = p0 + p1*t  Analysis has been done for the HCAL LED timing scan data.  Analysis program produces asymmetry curves, fits them and calculates Asymmetry Time (AT).  In the same time the Flat Top Time and the Flat Top Width are calculated.  Next slides show distribution of this values. AT

7 HCAL-A LED timing CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] AT-FTT ns Total Amplitude distribution Total Flat Top Time distribution Flat Top Width distribution ns HCAL – A timing and amplitude distributions RMS of the time difference (AT- FTT) is about 1 ns. 2ns

8 HCAL-C LED timing CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] HCAL – C timing and amplitude distributions AT-FTT Flat Top Width distribution Total Flat Top Time distribution Total Amplitude distribution RMS of the time difference (AT- FTT) is about 1 ns. 2.2ns

9 XCAL LED timing CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] HCAL – A asymmetry function parameter p1 (a slope) distribution RMS of this distribution is about 9 %. This value shows the integrator signal shape uniformity.

10 XCAL LED timing CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Conclusion & Planning The LED time scan for estimation a calorimeter sub-detectors LED monitoring quality was done after HV board firmware upgrade. The PHYSICS recipe was used for FE, HV and LED intensity configuration. LED time scan result looks good in general. The LED timing parameters compare with previous measurements are stable and there are only a few ten channels with a strange behavior. Periodical LED time scan data collection for monitoring the LED and HV systems stability will be continued. Estimation of the time measurement precision with using the TAE method and flat top time method has been done. For HCAL LED signals the time difference distribution has RMS of about 1 ns. For real particle the RMS will be 2 – 3 times less. The flat top width mean value is about 3.3 ns and minimal width is about 2 ns. May be the similar analysis will be useful and for a next TED run ?