I - 1 Cahyono Bintang Nurcahyo, ST, MT MANAJEMEN PENGADAAN & KONTRAK KONSTRUKSI.

Slides:



Advertisements
Similar presentations
ISTISNA AS MODE OF FINANCE
Advertisements

1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Vergabeformen Building Procurement – Contract strategy Procurement Systems – an initial overview Proper choice of delivery system can help to reduce conflicts.
Project Procurement & Contract Administration Jiwei Ma
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Introduction Leasing and hire purchase are financial facilities which allow a business to use an asset over a fixed period, in return for regular payments.
1 Eurostat Unit B1 – IT Systems for Statistical Production IT outsourcing in Eurostat – our experience Georges Pongas, Adam Wroński Meeting on the Management.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
Contractor Safety Management
Project Procurement Management
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Different Procurement Methods
ATMES Spring Meeting April 26-27, 2012 Myrtle Beach, South Carolina International Projects.
Software Development Contracts and Legal Issues Cost plus Fixed price Combined.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Contract strategy Traditional ApproachIncreasing Traditional ApproachIncreasing Accelerated Traditionalintegration Accelerated Traditionalintegration.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
15-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 15 Project Procurement.
Chapter 1 Introduction. 1-1 THE CONSTRUCTION INDUSTRY construction contracting is a very competitive business with a high rate of bankruptcy. construction.
ZHRC/HTI Financial Management Training
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
Procurement Systems ARBE121 – PROCUREMENT OPTIONS “The organisational structure adopted by the client for the management of the design and construction.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Purchasing & Storage Management Instructor Abdel Fatah Afifi MA&T, MBA, PCT, ACPA 2 nd Semester 09/10.
Click on Next to continue Introductio n Inputs Tools and Techniques Outputs Next 12.2 Conduct Procurements: Introduction The process of obtaining seller.
1 Outsourcing: Managing the relationship Example: Reclining chair project FIGURE 12.1.
Construction Contracts and Project Delivery Methods
TOPIC-9- PROJECT ORGANIZATION
Studi Kelayakan (Feasibility Study)
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Logistics/Supply Chain Organization
TYPES OF CONTRACTS.
Agency Construction Management :CM NOT AT-RISK
July 14, Rural Electric Cooperatives Procurement/Contracting Guidance Roger Jones Region VIII Disaster Assistance Division.
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
MGT 575 Summer 2008 Purchasing. MGT 575 Summer 2008 Steps in the Purchasing Process Accurate description of desired commodity or service Selection of.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
TOPIC-9- PROJECT ORGANIZATION
Outsourcing of Census Operations United Nations Statistics Division UNSD-ESCWA Regional Workshop on Census Data Processing in the ESCWA region: Contemporary.
Management Approaches. Construction Management Customer appoints Design team and Management team.
Improving Purchasing of Clinical Services* 21 st October 2005 *connectedthinking 
Outsourcing of Census Operations United Nations Statistics Division Regional Workshop on the 2010 World Programme on Population and Housing Censuses: International.
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
© Cengage Learning – Purchasing & Supply Chain Management 4 ed ( ) Analysis 3. The purchasing process: the buyer’s role.
Types of Contracts and Guidelines for their choice
ISO/IEC
Introduction to Business (MRK 151)
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Contract Award Procedures
PROJECT DELIVERY METHODS
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

I - 1 Cahyono Bintang Nurcahyo, ST, MT MANAJEMEN PENGADAAN & KONTRAK KONSTRUKSI

I - 2  Kontrak : perjanjian atau persetujuan antara dua pihak secara sukarela dan mengikatkan diri mereka masing- masing dalam persetujuan tersebut, yang dianggap sebagai ‘HUKUM’ yang harus ditaati dan dipenuhi (Nugraha,1986)

I - 3 Contract vs Procurement Each procurement needs contract. For long term project, contract is mostly used as procurement document (Purchase Order) For short time and repetitive projects, contract is made in general basis, while the purchase order will work in detail item (material and services) PMBOK Guide 2008

I - 4 A contract need: An offer Acceptance Consideration: value not only money Legal capacity: competent parties Legal purpose: not for illegal goods PMBOK Guide 2008

I - 5 Centralized/Decentralized Contract  Centralized: separate contracting office handles all contracts  Decentralized: contract administrator is assigned to each project CentralizedDecentralized Advantages Increase expertise in contracting Standardize practices Clearly defined career path Advantages Easier access to contracting expertise more loyalty to the project Disadvantages Difficult to gain access to contracting expertise One contracts person may work on many projects Disadvantages no home after project close difficult to maintain high level of contracting expertise duplication of expertise and inefficient use of resources Little standardization of contracting practices PMBOK Guide 2008

I - 6 PERENCANAAN KONTRAK KONSTRUKSI

I - 7 to procure  Funding Land acquisition Obtaining wayleaves Permissions Working unions The contract plans

I - 8 Outsourcing Options  Outsourcing of parts of a project and completed facility, may be with respect to: Finance Design Supply Management Construction (building) / fabrication / manufacturing Operation Maintenance “Owning” (over different franchise periods or indefinitely) ; leasing Combination of these

I - 9 Who finances ?Who designs ?Who manages ? Concessional methods Design and construction Management contracting Traditional Build-contract owner other Procurement Routes

I - 10 Contract at Construction O A/EC O C O CMC CONTRACT Build-Contract Design-Build Contract Design-Manage Contract Concession Method

I Build-Contract  Fixed Price Contract Lump Sum Unit-price  Prime Cost Contract Cost plus percentage Cost plus fixed fee Cost plus variable fee Target Estimate Guarantee max Convertible cost Time/Materials) Kontrak ini menitikberatkan kepada implementasi dari Rencana design proyek yang sudah ada. O A/EC

I - 12 Build Contract  Client  responsible for design  engagement with consulting engineer or architect  Main contractor  limited to construction, in accordance with design & specification  >1 contractors  coordinated by client

I - 13  Independent professional design and supervision  Each work packages will be tendered for on a basis which ensure the most competitive prices  Control over the project ; changes can be accommodated within the contractual procedure advantages Build Contract

I - 14  No competition for the design  The design will not be complete at tender stage  required specialist sub-contractor  The design will not incorporate any construction “know-how” from contractor  No sense will own the design by contractor  Discontinuity of supply chain  Lack of information channel to employer, if there are >1 dependent contractors Build Contract disadvantages

I Design-Build Contract  Turn-key Contract  Negotiated Contract Pihak kontraktor diminta mengajukan penawaran pekerjaannya, termasuk desain (rencana proyek) berdasarkan keahlian pemborongnya (package-deal) O A/EC

I - 16 Full Turnkey  A contract where the contractor undertakes the total responsibility for the Design Engineering Procurement Construction Commissioning & testing the works Training of the client’s staff

I - 17 Full Turnkey  Client’s responsibilities are limited to : Definition of client’s requirements Making the site available Monitoring progress of the work Payment Taking over when the project has past its guarantee test  Client only has to turn the key in order to commence production or other use of facility.

I - 18 Full Turnkey  ICE and JTC’s design & construct contract, or design & build contract  the design is often undertaken by contractor,  on the basis of a design concept, prepared by designers engaged by clients.

I - 19  Maximum responsibility in the hands of one organization ; minimize to employ employer’s resource or to engaged consultant.  Shortest possible period of time to completion  Design is a part of competitive tender  innovation & economies Full Turnkey advantages

I - 20  Synchronization of design, procurement, & construction  avoiding delays and diseconomies  Reduce to a minimal claims against the employer  out-turn cost should be very close to original contract price. Full Turnkey advantages

I - 21  Little opportunity for employer to correct any mistake in the choice of firm concerned.  Project size & complexity  little choice of firms to compete  Contract price is bound to reflect scale of risks, resources to employ, lack of competition  Contractor decision by economical factor, not by long-term quality, safety, reliability Full Turnkey disadvantages

I - 22 Partial Turnkey  Responsibilities are belong to : Employer Consultant Turnkey Contractor  Responsibilities proportion are subject to variations to suit the wishes of the parties.

I - 23 Partial Turnkey  Employer’s level of responsibility will increase than Full Turnkey : For the works itself For Coordination  Turnkey Contractor  responsible for “battery limits” works, i.e. the main process or production plant  Employer  limited to activities do not impact directly to production plan  ex. Landscaping, perimeter fencing & lighting, the office block, the gate-house

I - 24  = Full Turnkey  Employer have a opportunity to contracting separately (and probably more cheaply) for ancillary works, ex for smaller local firms Partial Turnkey advantages

I Design-Manage Contract  Project Management Contract  Construction Management Contract  Managing Contractor Pada kontrak jenis ini pihak pemilik menyerahkan pengelolaan proyek kepada organisasi /spesialis/ individu yang dikenal sebagai konsultan Manajemen. O CMC

I - 26 Management Contracting  Project Management  employer appoints a Professional Project Manager to action on client’s behalf in the management of the projects

I - 27  Construction Management Employer have direct contract with : Construction Manager  for management of construction  responsible for time & cost Consultant, architect, structural engineer Contractor  US  CM is the leader for management of design & construction  UK  Employer is the leader Management Contracting

I - 28  Managing Contractor Employer Management Contractor Work Contractor 1 Work Contractor 2 Contract Sub Contract Design, other consultant Management Contracting

I - 29  Time saving vs Traditional Contract  Valuable where time is short ; and it is necessary to start construction on Work Packages 1, prior to completion design of WP2 ; “leap-frog” design & construction while handling the change.  Saving in cost  Commercial attitude of CM, will engaged to WC Management Contracting advantages

I - 30  Risk of claims to employer from one WC by reason of the default by another WC.  Employer’s turn-out cost at the start is undefined  he will expect that the budget from MC should be reasonably accurate. Management Contracting disadvantages

I Concession Method  Including finance  BOOT, BO, BOT, BOO (build, own, operate, transfer)  BOLT, BLO (build, operate, lease, transfer)

I - 32 Memilih kontrak  Hal-hal yang perlu dipertimbangkan sebelum menentukan jenis kontrak: Lengkap atau tidaknya definisi lingkup kerja (Scope). Insentif (Reward & Punishing). Eskalasi (Inflasi). Kurun waktu pelaksanaan proyek (Multiyears project) Sifat proyek (unik & spesific).

I - 33 Decision Criteria  Method of funding  Project size, Complexity, and Client’s resources  Time for Completion  Economy of design & Maintenance/Operating Cost  Certainty of Out-turn cost.

I - 34 Summary  Preparation of contract plan is an essential step in the execution of any project, no matter how simple.  There is no single perfect answer. Each plan represent a trade-off between conflict interest : i.e. Shorter time VS lower capital cost

I - 35 Latihan Soal  Apakah yang dimaksud dengan kontrak?  Sebutkan dan jelaskan jenis-jenis kontrak konstruksi!  Kontrak jenis apakah yang sebaiknya dipergunakan untuk proyek yang volume pekerjaannya sulit diprediksi? Seperti pembuatan tanggul ‘Lumpur Sidoarjo’? Jelaskan argumentasi Anda!

I - 36 Reference Carmichael, David G Contracts and International Project Management. Rotterdam : A.A. Balkema Marsh, Peter D.V Contracting for Engineering and Construction Projects. Burlington : Gower Publishing Company. Project Management Institute A Guide to the Project Management Body of Knowledge (PMBOK® Guide) 2008 Edition. Pennsylvania : Project Management Institute, Inc.