ESA Status Report Jean-François Kaufeler Montreal, 24 May 2004.

Slides:



Advertisements
Similar presentations
CEOS WGISS & Subgroup Meeting, Budapest, May CCSDS Liaison Consultative Committee on Space Data Systems Wyn Cudlip BNSC/QinetiQ
Advertisements

Wyn Cudlip BNSC/QinetiQ Presentation to WGISS24 DLR, October 2007 CCSDS Liaison Consultative Committee on Space Data Systems.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Large-scale integrating projects (IPs)
SGIA-BOF-kickoff.ppt - CCSDS SGIA - Space to Ground Interoperability Architecture (SGIA) Birds of a Feather (BOF) Out Brief September 16, 2005 Clayton.
Relevance and effectiveness Regional Good Standardization Practice Course July, Bangkok, Thailand Good Standardization Practice 2012.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
1 CCSDS Information Architecture Working Group SEA Plenary Daniel J. Crichton, Chair NASA/JPL 12 September 2005.
ESTEC, Noordwijk, Netherlands 27 Oct 2009 SERVICE ARCHITECTURE FOR SPACE -- BOF 1.
CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > www.DLR.de/rb Slide 1.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
MOIMS Reportp. 1 Digital Repository Audit and Certification BOF Goal  Obtain CCSDS / ISO approval of a standard that establishes the criteria that a repository.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada May 2004 DLR Report Martin Pilgram,
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 1 ECSS Working Group “Exchange of Product Data” and related work Hans Peter de Koning (ESA/ESTEC/TOS-MCV)
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
System Engineering Area SANA BoF Kick-Off 12 May 2004 Peter Shames NASA/JPL.
CMC Meeting Planning May 2015.
May11-cesg-1 status:OKCAUTIONPROBLEM comment: Very Good SOIS Area Report Wireless WG Goals for the spring meeting Complete the discussions and agree on.
ESA Report to CMC ESA / ESTEC, 5th November 2009 Mario Merri (deputising JFK / NPESA CCSDS Delegate)
The Consultative Committee for Space Data Systems Report to CCSDS AGENC Y Note to CMC members: This template follows the CMC-agreed outline for agency.
ESA Report Jean-François Kaufeler 12 th April 2005 Athens.
Panel P1J: Navigation Data May 2001 CCSDS P1J Status Report P1 Plenary Meeting May 23, 2001 TSG Meeting May 24-25, 2001 Pasadena, California, USA Felipe.
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
1 CCSDS Threat Document Discussion CCSDS Security Working Group Fall 2004 Meeting CNES, Toulouse FR Howard Weiss NASA/JPL/SPARTA
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 10) StatusComment ProgressGood Progress overall, especially on the.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
Security WG: Report of the Spring 2005 Meeting April 14, 2004 Howard Weiss.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007.
CSA St Hubert, Quebec24-25 May Spring 2004 CCSDS Management Council CNES report Geneviève Campan (CNES)
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
Dokumentname > Folie 1 > Vortrag > Autor DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington.
Navigation WG Report D. Berry NASA J. Fertig ESA.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
May MOIMS PLENARY –Be careful when connecting your laptop in the meeting rooms Responsibility of WG Chair Cost to be covered by WG chair Cost not.
November SECURITY WORKING GROUP REPORT November 2004.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
ESA UNCLASSIFIED – For Official Use MOIMS Plenary Darmstadt, Germany 09-12Nov15 Mario Merri, ESA/ESOC Brigitte Behal, CNES MOIMS Status, Issues and Vision.
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
SM&C WG Plenary CCSDS Spacecraft Monitoring & Control WG (SM&C) Workshop #17, Darmstadt (D), Apr 2012 Mario Merri, ESA/ESOC, Chairman.
Data Archive Ingest WG Report to MOIMS Plenary May 14, 2004.
Quality Milestones Elaborate quality system developed over the years “Joint Agenda Building” (JAB) group “Strategic Quality” – Progress report CA/80/04.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
Report to CCSDS AGENCY Note to CMC members: This template follows the CMC-agreed outline for agency reports Replace RED text with your agency’s name and.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
Frequency Management Office 1 The Space Frequency Coordination Group (SFCG) ESF WorkshopCagliari, 29 October, 2004.
The Consultative Committee for Space Data Systems JAXA CCSDS Status to CMC/8Dec04/K.Narita Page 1 JAXA Agency Report to CMC and ISO/SC13 Kaneaki Narita.
June MOIMS AREA PLENARY NAVIGATION WG REPORT June 2006 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
National Aeronautics and Space Administration 1 CCSDS Information Architecture Working Group Daniel J. Crichton NASA/JPL 24 March 2005.
ESA UNCLASSIFIED – For Official Use Cleveland, OH, USA 04-08Apr16 Mario Merri, ESA/ESOC Brigitte Behal, CNES MOIMS Opening Plenary.
Heterogeneous Missions Accessibility HMA Architecture Working Group
Identifying Programs and Contacting Program Directors
SPACECRAFT ONBOARD INTERFACES SERVICES
Planetary Protection at ESA
Presentation transcript:

ESA Status Report Jean-François Kaufeler Montreal, 24 May 2004

ESA Reorganisation While before the whole Space System aspects were dealt within a same Directorate, the new organisation is now:  TEC (Technical and Quality) Directorate covers the Space Segment  OPS (Operation and Infrastructure) Directorate covers the Ground Segment Technical space standards are covered by the ESB (Engineering Standardisation Board)  Harmonisation on policies and positions  Harmonisation of resources (budget + people) coming from TEC and OPS  Liaison with ECSS and CCSDS ESA contributes to  ECSS Management and Quality standards Space Segment technical standards (mechanical, electrical) -> ISO  CCSDS End-to-end data / communication systems

ESA Resources ESA level of support represents ~ 5 my including  Permanent staff  Supporting contractors European effort (e.g. ASI, BNSC, CNES, DLR, ESA) represents ~ 9 my  This level of effort could potentially be better utilised  Harmonisation effort at European level is desirable and is envisaged ESA is implementing a new station baseband system (TMTCS) fully compliant with SLE standards  Elements of that system implementing the standard could be made available to CCSDS Member Agencies  The modalities of such a possibility will have to be discussed at the next CMC

ESA and OMG participation ESA has hosted the joint OMG – CCSDS meeting at ESOC  Agreements on cooperation principles for 2005 have been reached  CSSDS working procedure remain unchanged  OMG may attend the CCSDS 2004 Spring and Fall meetings  OMG proposes to organise the joint hosting of meetings  OMG proposes to support CCSDS architecture design based on OMG technology ESA position  ESA will not participate in any OMG initiative if it is not placed in the framework of this cooperation agreement

ESA Missions Many ESA missions are of scientific nature and require standards at the edge of technology  Deep space missions  Planetary missions However these mission have to be cost effective and should rely on appropriate CCSDS standards Conversely such standards which should be able to allow cost effective implementation for complex scientific missions should also be able to support effectively the other type of missions  Qui peut le plus, peut le moins!

ESA Concerns Increase of BOFs  There is a noticeable increase of BOFs while resources are still missing to progress on approved WGs  A BOF should not in principle use any official Agency resource and therefore no claims can be made that resources are missing on BOFs Deficit of resources  There is in some case a mismatch between what is required by a WG and what Agencies have made available  Therefore the planning has to be updated to reflect this situation