TR 10 943 Red Rock Subtation 8P22 8P25 8P28 8P21 8P24 8P27 8P20 8P23 K5 345kV Bus 1 345kV Bus 2 PT 115kV 10/31/2005, At Red Rock Substation, the switching.

Slides:



Advertisements
Similar presentations
Introduction to Switchgear
Advertisements

Incident took place at OPP substation at 9. 31
Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
Thermostats. I would recommend that as you proceed through this power point presentation that you refer to your textbook, Unit 14, for some great visuals.
Goshen Area Bus Reconfiguration
1 Distributed Generation and Power Quality. 2 Relaying considerations DG infeed may reduce the reach of overcurrent relays –DG feeds fault, so utility.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Power Status Thomas Nehring Conventional Facilities Advisory Committee Review October 5-6, 2010.
Danger Tags and Locks Picture of the Week Collider-Accelerator Department Take 5 for Safety.
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
SHUNT CAPACITOR FUNDAMENTALS AND PROTECTION
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
Substations. Substations Chapter 4 Substations Major types of equipment found in most transmission and distribution substations with their purpose,
E2 Motors and Motor Starting
Student Handout Packet Go to page A4. Please answer the following questions using page A4.
1 HVAC 214 Electricity For Oil Heat Fan Center Relays.
EE369 POWER SYSTEM ANALYSIS
Mega Beast Product Demonstration HJ Arnett Industries, LLC Portland, OR Chris Shipley, Sales Manager
Electronic Troubleshooting
We ground the neutral of our Distribution capacitor banks- Why?
Power Distribution Harmonics Case Study of 285-3F Chiller Plant Michael W. Harmon Principle Engineer Savannah River Nuclear Solutions, LLC Savannah River.
By A.D.Thirumoorthy Tamil Nadu Electricity Board India.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
1 Entergy Transmission Asset Preservation Department 2004 Objectives Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
AFCI Reaction to Utility Events. CenterPoint Energy 35 KV Distribution Capacitor Bank – Switched through an automated system.
Zoran Gajić ABB AB Vasteras, Sweden
 Four Components of a circuit  Power supply  Conductor  Load device  Controlling device  Power Supply  Generator  Line source (wall outlet)  Transformer.
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
Windham Tech HVAC Solid State Current Coil Potential Starting Relays.
Connections of a CT and a PT to supply, load and relay.
OPERATING NOMENCLATURE PRESENTERS: A.B.S.ENNIN, GEORGE COLEMAN, DAVID DADSON, ANTHONY ANSAH.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe
Electricity Visual Vocabulary Grade 7. CHARGE CAN NOT BE CREATED OR DESTROYED; ONLY TRANSFERRED BETWEEN OBJECTS.
Protection & Switchgear
POWER HOUSE.
Ponnequin turbines output voltage(580Von the Micon side, 690Von the Vestas side) to pad mount transformers. These step the voltage up to 25KV. Connected.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
A Presentation On 132 KV GSS BEHROR
Submitted to: Submitted by:
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Submitted To:- Submitted By:- Mr.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
REDA Production Systems
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Design of starters for AC motors C.K. PITHAWALA COLLAGE OF ENGINEERING & TECHNOLOGY Group no - 3 Name Enrolment no Chaudhari Darshan M Chaudhari.
Equipment 1.Circuit Breaker. 3.Fuses. 4.Protecti- ve relay.2.Bus bar. TYPES OF SWITCH GEAR EQUIPMENT:-
 The figure below shows a protection system for a transmission line, consisting of a CT, PT, a relay and its associated circuit breaker.
6 Week industrial Training Presentation
Set up your circuit board 2 batteries, bulb, switch, and variable resister.
Effects of Harmonics on Capacitors Electrical System
Transient Response of an RC Circuit
The Electrical Diagram
Associated Hazards and Safety Practices
Protective Relaying Conference
Lesson 11: Transformer Name Plate Data and Connections
Example: determine the capacitance of a single capacitor that will have the same effect as the combination shown. Use C1 = C2 = C3 = C. C2 C1 C3 I don’t.
Determine the current through each resistor, the total current and the voltage across each resistor. VB R4 R5.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
K2 Schematic Analysis and Pictorial Diagram
Capacitors Devices used to store charge.
Series Circuits Makeup Lab
Power system operation and control
Substation Equipment's
Presentation transcript:

TR Red Rock Subtation 8P22 8P25 8P28 8P21 8P24 8P27 8P20 8P23 K5 345kV Bus 1 345kV Bus 2 PT 115kV 10/31/2005, At Red Rock Substation, the switching procedure (TWR ) called for the isolation of the Red Rock 345kV bus #2 so that a C-phase lightning arrestor could be installed. The arrestor had failed during an earlier event on 10/4/2005. During this switching procedure, something caused high voltages on Bus 2 and the A & B phase pot transformers vented significant amounts of oil.

TR Red Rock Subtation 8P22 8P25 8P28 8P21 8P24 8P27 8P20 8P23 K5 345kV Bus 1 345kV Bus 2 PT 115kV The relay potentials have been placed on the Bus 1 position and the pot paralleling switch has been turned off. The dispatcher has opened two 115kV breakers and two 345kV breakers. Everything appears normal at this point. The next step is to de-energize the 345kV Bus #2 by opening 8P22.

TR Red Rock Subtation 8P22 8P25 8P28 8P21 8P24 8P27 8P20 8P23 K5 345kV Bus 1 345kV Bus 2 PT 115kV 8P22 opened to de- energize the 345kV bus 2. Va goes to 68% Vb stays at nominal Vc goes to 48% No harmonics present. What is keeping the Bus 2 B-phase PT at nominal voltage? Sequence of Events: 07:15:14 8P22 opened

TR Red Rock Subtation 8P22 8P25 8P28 8P21 8P24 8P27 8P20 8P23 K5 345kV Bus 1 345kV Bus 2 PT 115kV Sequence of Events: 07:15:14 8P22 opened 07:15:40 TR 10 MOD opened 8P22 Opened (shown on prev. slide.) TR10 MOD opened. Va jumps to 131% Vb stays at nominal Vc rises to 55% No harmonics present. Slow speed record only.

TR Red Rock Subtation 8P22 8P25 8P28 8P21 8P24 8P27 8P20 8P23 K5 345kV Bus 1 345kV Bus 2 PT 115kV Sequence of Events: 07:15:14 8P22 opened 07:15:40 TR 10 MOD opened 07:16:18 8P22 A MOD opened 8P22 A MOD opened. Va dips to 127% Vb jumps to 128% Vc drops to 44% Va & Vb have significant harmonics now. Slow speed record shown here, next slide shows high speed record of this same switching. A

TR Red Rock Subtation 8P22 8P25 8P28 8P21 8P24 8P27 8P20 8P23 K5 345kV Bus 1 345kV Bus 2 PT 115kV Sequence of Events: 07:15:14 8P22 opened 07:15:40 TR 10 MOD opened 07:16:18 8P22 A MOD opened 8P22 A MOD opened. Va drops to 127% Vb jumps to 128% Vc drops to 44% Va & Vb have significant harmonics now. High speed record shows harmonics. A

TR Red Rock Subtation 8P22 8P25 8P28 8P21 8P24 8P27 8P20 8P23 K5 345kV Bus 1 345kV Bus 2 PT 115kV Sequence of Events: 07:15:14 8P22 opened 07:15:40 TR 10 MOD opened 07:16:18 8P22 A MOD opened 07:34:16 Va drops to 50% What caused Va to drop to 50% of nominal 18 minutes after the last switching occurred? No operator actions are known to have occurred around this time. Vb is still at 127% with harmonic distortion. A

TR Red Rock Subtation 8P22 8P25 8P28 8P21 8P24 8P27 8P20 8P23 K5 345kV Bus 1 345kV Bus 2 PT 115kV Sequence of Events: 07:15:14 8P22 opened 07:15:40 TR 10 MOD opened 07:16:18 8P22 A MOD opened 07:34:16 Va drops to 50% 07:42:08 Vb drops to 41% What caused Vb to drop to 41% of nominal 26 minutes after last switching. No switching was recorded at this time. All three voltages are at approximately 40%. Smooth waveforms are present. At the start of this record, Va and Vc contain harmonics. A

TR Red Rock Subtation 8P22 8P25 8P28 8P21 8P24 8P27 8P20 8P23 K5 345kV Bus 1 345kV Bus 2 PT 115kV Sequence of Events: 07:15:14 8P22 opened 07:15:40 TR 10 MOD opened 07:16:18 8P22 A MOD opened 07:34:16 Va drops to 50% 07:42:08 Vb drops to 41% Next steps? We need to understand what happed here. In talking with the maintenance department, it seems like the two theories that could explain the bus energization are the grading capacitors on the ABB HPL 362A2 breakers or some problem with the pot paralleling scheme is allowing backfeed. More testing, investigation, and possibly ATP study work is needed!!!! A

RRK 345kV HPL breakers with external grading capacitors.

RRK 345kV Wire wound potential transformers on Bus 2. A & B phase units blew oil out of their tops.