HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor
Phases 1 & 2 + XT03 HEBT: XT01: Miniball XT02: Movable setup + Tilted Foil setup XT03: could be installed by Apr together with CM3 and CM4
Cost XT03 3 ItemNumberSparesUnit Cost kCHFTotal kCHF* Infrastructure Machine Magnet MD Magnet MQ Magnet ST Convertor MD0 650 Convertor MQ0150 Convertor ST0120 Long Diagnostic Box Vacuum pump + gauges New vacuum sector012 0 Vacuum chamber MD025 0 Vacuum chamber MQ05 0 Vacuum chambers SSS/triplet0 5 0 Interlocking MD/MQ/ST (incl. cabling)0 20 MD jacks Supports type Doublet/Triplet04 0 XYZ stages0 2 0 Cabling MD/MQ/ST magnets + racks Cabling DB + rack050 0 Cabling vacuum Cooling MD/MQ/ST Installation and survey (man-months)18 8 Design layout/integration (man-months)08 0 Beam dynamics (man-months)08 0 Control Software (man-months)0 8 0 Total 8585
Proposal#1: HELIOS on XT02 => cost optimised solution Beam parameters unchanged HELIOS footprint includes magnetic shielding + access to the rear Layout remains TSR compatible 10 M 7 M Phase 2 with HELIOS on XT02 (2017/2018) 2 T 2T
compatible with on XT01 and Miniball in open position 10 M 7 M Phase 2 with HELIOS + TRIuP
Cost HELIOS in XT02 6 ItemNumberSparesUnit Cost kCHFTotal kCHF* Infrastructure Machine Magnet MD Magnet MQ Magnet ST1 13 Convertor MD0 650 Convertor MQ21530 Convertor ST112 Long Diagnostic Box1 32 Vacuum pump + gauges1 11 New vacuum sector112 Vacuum chamber MD025 0 Vacuum chamber MQ05 0 Vacuum chambers SSS/triplet1 5 5 Interlocking MD/MQ/ST (incl. cabling)1 22 MD jacks Supports type Doublet/Triplet14 4 XYZ stages1 2 2 Cabling MD/MQ/ST magnets + racks Cabling DB + rack152.5 Cabling vacuum Cooling MD/MQ/ST Installation and survey (man-months) Design layout/integration (man-months)18 8 Beam dynamics (man-months)18 8 Control Software (man-months)1 8 8 Total
Phase 2 with HELIOS on U-Bend Proposal#2: HELIOS on U-Bend Beam parameters unchanged HELIOS footprint includes magnetic shielding + access to the rear => too close to EPC racks Layout remains TSR compatible 10 M
Cost HELIOS in U-Bend 8 ItemNumberSparesUnit Cost kCHFTotal kCHF* Infrastructure Machine Magnet MD Magnet MQ Magnet ST Convertor MD Convertor MQ Convertor ST51260 Long Diagnostic Box Vacuum pump + gauges New vacuum sector Vacuum chamber MD Vacuum chamber MQ75 35 Vacuum chambers SSS/triplet Interlocking MD/MQ/ST (incl. cabling) MD jacks Supports type Doublet/Triplet44 16 XYZ stages Cabling MD/MQ/ST magnets + racks Cabling DB + rack6515 Cabling vacuum6 515 Cooling MD/MQ/ST Installation and survey (man-months)38 24 Design layout/integration (man-months)18 8 Beam dynamics (man-months)18 8 Control Software (man-months) Total
Phase 2 with HELIOS on U-Bend + TRIuP Proposal#2: HELIOS on U-Bend Difficult to fit on XT01 with Miniball in open position and HELIOS in parking position
Phase 2 with HELIOS on U-Bend + TRIuP
Thank you for your attention