HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.

Slides:



Advertisements
Similar presentations
HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
Advertisements

M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)
Report from HEBT Working Group B.Goddard, CERN TE/ABT On behalf.
2 Davide Aguglia TE-EPC-FPC Sept. 23 rd rd PSB injection EPC powering rack space coordination meeting Stripping foil chicane BSW magnets powering.
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
HIE-ISOLDE Project Status Report
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
Maria J. G. Borge Beam Lines for HIE-ISOLDE. Status of HIE-ISOLDE 2 May 2010: 34 LoI submitted 1 Nov 2012: INTC endorsed the increase of 2 GeV-proton.
Long DB Si- telescope Integration of a Si-telescope in the HIE ISOLDE long diagnostic boxes 21/09/2015LDB Si-telescope1.
Extraction and beamline progress B.Goddard TE/ABT.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
The integration of 420 m detectors into the LHC
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
HIE-ISOLDE Project Status Report 50th ISOLDE & nTOF Technical Committee meeting July 1st 2015 Y. Kadi.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Report Technical Director Storage-Ring-Installation Completed
Preparation Phase of the FAIR Project
SCADA & Monitoring Developments for Vacuum
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
ELENA installation and commissioning status
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
The Elimed Control System approch
PLC-based control systems at SOLEIL - ICALEPCS 2017
CLEX* Status and Plans CTF3 complex CLEX
LINAC4 Vacuum Control System Review
Hosting Orsay Walid KAABI
WIC deployment and commissioning in HIE-ISOLDE
RWTCS Steering Commitee
RWTCS Steering Commitee
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
HIE-ISOLDE Status Report
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
Magdalena Kowalska, CERN PH-SME-IS
TEST PLANS for HL LHC IT STRING
KEK injector cryomodule
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
66th ISOLDE Collaboration Committee meeting
Beam Transfer Line Stage 1:
LCLS Undulator System Production Management
Project management Ray Veness.
Presentation transcript:

HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor

Phases 1 & 2 + XT03 HEBT: XT01: Miniball XT02: Movable setup + Tilted Foil setup XT03: could be installed by Apr together with CM3 and CM4

Cost XT03 3 ItemNumberSparesUnit Cost kCHFTotal kCHF* Infrastructure Machine Magnet MD Magnet MQ Magnet ST Convertor MD0 650 Convertor MQ0150 Convertor ST0120 Long Diagnostic Box Vacuum pump + gauges New vacuum sector012 0 Vacuum chamber MD025 0 Vacuum chamber MQ05 0 Vacuum chambers SSS/triplet0 5 0 Interlocking MD/MQ/ST (incl. cabling)0 20 MD jacks Supports type Doublet/Triplet04 0 XYZ stages0 2 0 Cabling MD/MQ/ST magnets + racks Cabling DB + rack050 0 Cabling vacuum Cooling MD/MQ/ST Installation and survey (man-months)18 8 Design layout/integration (man-months)08 0 Beam dynamics (man-months)08 0 Control Software (man-months)0 8 0 Total 8585

Proposal#1: HELIOS on XT02 => cost optimised solution Beam parameters unchanged HELIOS footprint includes magnetic shielding + access to the rear Layout remains TSR compatible 10 M 7 M Phase 2 with HELIOS on XT02 (2017/2018) 2 T 2T

compatible with on XT01 and Miniball in open position 10 M 7 M Phase 2 with HELIOS + TRIuP

Cost HELIOS in XT02 6 ItemNumberSparesUnit Cost kCHFTotal kCHF* Infrastructure Machine Magnet MD Magnet MQ Magnet ST1 13 Convertor MD0 650 Convertor MQ21530 Convertor ST112 Long Diagnostic Box1 32 Vacuum pump + gauges1 11 New vacuum sector112 Vacuum chamber MD025 0 Vacuum chamber MQ05 0 Vacuum chambers SSS/triplet1 5 5 Interlocking MD/MQ/ST (incl. cabling)1 22 MD jacks Supports type Doublet/Triplet14 4 XYZ stages1 2 2 Cabling MD/MQ/ST magnets + racks Cabling DB + rack152.5 Cabling vacuum Cooling MD/MQ/ST Installation and survey (man-months) Design layout/integration (man-months)18 8 Beam dynamics (man-months)18 8 Control Software (man-months)1 8 8 Total

Phase 2 with HELIOS on U-Bend Proposal#2: HELIOS on U-Bend Beam parameters unchanged HELIOS footprint includes magnetic shielding + access to the rear => too close to EPC racks Layout remains TSR compatible 10 M

Cost HELIOS in U-Bend 8 ItemNumberSparesUnit Cost kCHFTotal kCHF* Infrastructure Machine Magnet MD Magnet MQ Magnet ST Convertor MD Convertor MQ Convertor ST51260 Long Diagnostic Box Vacuum pump + gauges New vacuum sector Vacuum chamber MD Vacuum chamber MQ75 35 Vacuum chambers SSS/triplet Interlocking MD/MQ/ST (incl. cabling) MD jacks Supports type Doublet/Triplet44 16 XYZ stages Cabling MD/MQ/ST magnets + racks Cabling DB + rack6515 Cabling vacuum6 515 Cooling MD/MQ/ST Installation and survey (man-months)38 24 Design layout/integration (man-months)18 8 Beam dynamics (man-months)18 8 Control Software (man-months) Total

Phase 2 with HELIOS on U-Bend + TRIuP Proposal#2: HELIOS on U-Bend Difficult to fit on XT01 with Miniball in open position and HELIOS in parking position

Phase 2 with HELIOS on U-Bend + TRIuP

Thank you for your attention