EVM Home Page = https://acc.dau.mil/evm Address: DAU POC: (703) 805-5259 (DSN 655) Revised December 2006 TERMINOLOGY.

Slides:



Advertisements
Similar presentations
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Advertisements

E ARNED V ALUE M ANAGEMENT G OLD C ARD Projected Slip ? Management Reserve Cost Variance Schedule Variance ACWP Cum BCWP Cum BCWS Cum $ EAC Time Now Completion.
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
1 Earned Value Management a tool for project Portfolio management Jim Strong DLMP PMO Director.
Replanning, Reprogramming, and Single Point Adjustments July NAVY CEVM
Module 8: Government Required Reports
N O T E “CLICK” TO CONTINUE… If the slide show is not launched, click on View  Slide Show in the menu bar at the top of the Power Point window. When the.
EV Basics Tutorial Lesson 1 – Earned Value Management Basics
An Overview of Earned Value Management (EVM) Using EVM to Track Progress.
1 EVM Policy July 2013 NAVY CEVM 2 Outline DoDI DFARS DFARS DFARS June 2012 AT&L Policy Letter.
Recognition of Scope Change in the IPMR July 2013 NAVY CEVM.
1 Estimating Costs At Completion Review this tutorial and the Project Pyramid Exercise until you are fully comfortable with how to calculate an estimate.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Management Reserve (MR) Total Allocated Budget (TAB)
Earned Value Management (EVM) Fundamentals
Energy Storage System Launch Control System Launch Motor Power Conversion System FOR OFFICIAL USE ONLY AUTOMATED BALLISTIC CABINET (ABC) SDD Contract Performance.
BASICS OF EARNED VALUE MANAGEMENT
Earned Value Management Guidelines Tony Finefield Finefield Consulting CPM Webinar 5 September
Project Management 6e..
CPM-400: xxx Lesson B: EV Data Analysis I Instructor Ellen Udell
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Project Management Methodology Project monitoring and control.
Roberta Tomasini Defense Acquisition University DSN Earned Value and the Acquisition Program.
49th Annual NCMA March Workshop
Dave Bachman DAU / CDSC September 9, 2004
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Revised Department of Defense Earned Value Management Policy Deborah A. Tomsic Senior Program Analyst Office of the Under Secretary of Defense (Acquisition,
Chapter 15 Cost Control.
EARNED VALUE MANAGEMENT (EVM)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
EVM Home Page = = “One Book” DAU POC: (703) (DSN 655) Address: Revised.
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
Mohawk Vehicle - MEGA HERZ ELEC & VEN - MOH-2 F C-0050 J:\CS40\Data Analysis\- Standard Analysis Package/Sample Standard Analysis Package.
Mohawk Vehicle - MOH-2 - F C EVM Quick-Look Report.
Brookhaven Science Associates U.S. Department of Energy Facility Managers Meeting DOE-OECM Certification of Earned Value Management Systems April 27-28,
Management & Development of Complex Projects Course Code - 706
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
O The Integrated Program Management Report (IPMR), Data Item Description DI-MGMT (latest version) at DIDs.shtml,
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
Presented by Niyi Ladipo September 14,  Results of the Survey  What is Earned Value Management (EVM)?  EVM vs. Traditional Cost Management 
EARNED VALUE MANAGEMENT & ORACLE PRIMAVERA P6 TREY MILLER, MBA, PMP ORACLE PRIMAVERA P6 EPPM CERTIFIED IMPLEMENTATION SPECIALIST GLOBAL PROJECT MANAGEMENT,
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Earned Value Management Reading the Roadmap to Project Success (or, Are We There Yet?) Steve Margolis, PMP Perpetual Technologies, Inc. March 19, 2008.
E ARNED V ALUE M ANAGEMENT ‘G OLD C ARD ’ Projected Slip ? Management Reserve Cost Variance Schedule Variance ACWP Cum BCWP Cum BCWS Cum $ EAC Time Now.
Schedule Control (Earned Value)
1 EVM for Contract Managers 1 1 Breakout Session # E14 Presenter: Frank Malsbury, CPCM, Fellow, Integrated Program Management Cert, and Finance “Specialist”
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
Earned Value Management Reading the Roadmap to Project Success (or, Are We There Yet?) Steve Margolis, PMP Perpetual Technologies, Inc. April 13, 2010.
Performance Measurement Baseline Contract Price (Project Price)
Earned Value Management
IEVMC Lesson 8 FY14 Analysis Case Study Performance Management Analysis Tools Student guide page 8-5.
Performance Measurement Baseline Contract Price (Project Price)
September 2016 EVM 202—Lesson 4 Integrated Baseline Review Process (Part 4: Baseline Maintenance)
Progress and Performance Measurement and Evaluation
Dave Bachman DAU / CDSC September 9, 2004
Integrated Program Management Case Study Briefing
EVM 202—Lesson 3 EVMS Guidelines and Compliance
Implementing EV in IT A Three Step Approach John Chapman Touchstone Ltd
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
EVM Policy NAVY CEVM July 2013
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

EVM Home Page = Address: DAU POC: (703) (DSN 655) Revised December 2006 TERMINOLOGY NCC Negotiated Contract CostContract price less profit / fee(s) AUW Authorized Unpriced WorkWork contractually approved, but not yet negotiated / definitized CBB Contract Budget BaseSum of NCC and AUW OTB Over Target BaselineSum of CBB and recognized overrun TAB Total Allocated BudgetSum of all budgets for work on contract = NCC, CBB, or OTB BAC Budget At CompletionTotal budget for total contract thru any given level PMB Performance Measurement BaselineContract time-phased budget plan MR Management ReserveBudget withheld by Ktr PM for unknowns / risk management UB Undistributed BudgetBroadly defined activities not yet distributed to CAs CA Control AccountLowest CWBS element assigned to a single focal point to plan & control scope / schedule / budget WP Work PackageNear-term, detail-planned activities within a CA PP Planning PackageFar-term CA activities not yet defined into WPs BCWS Budgeted Cost for Work ScheduledValue of work planned to be accomplished= PLANNED VALUE BCWP Budgeted Cost for Work PerformedValue of work accomplished = EARNED VALUE ACWP Actual Cost of Work PerformedCost of work accomplished = ACTUAL COST EAC Estimate At CompletionEstimate of total cost for total contract thru any given level; may be generated by Ktr, PMO, DCMA, etc. = EAC Ktr / PMO / DCMA LRE Latest Revised EstimateKtr’s EAC or EAC Ktr SLPP Summary Level Planning PackageFar-term activities not yet defined into CAs TCPI To Complete Performance IndexEfficiency needed from ‘time now’ to achieve an EAC EVM POLICY: DoDI , Table E3.T2. EVMS in accordance with ANSI/EIA-748 is required for cost or incentive contracts, subcontracts, intra-government work agreements, & other agreements valued > $20M (Then-Yr $). EVMS contracts > $50M (TY $) require that the EVM system be formally validated by the cognizant contracting officer. Additional Guidance in Defense Acquisition Guidebook and the Earned Value Management Implementation Guide (EVMIG). EVMS is discouraged on Firm-Fixed Price, Level of Effort, & Time & Material efforts regardless of cost. EVM CONTRACTING REQUIREMENTS: Non-DoD FAR Clauses – Solicitation – (Pre-Award IBR) or (Post Award IBR) Solicitation & Contract – DoD( ≥ $20M) DFAR Clauses for solicitations and for solicitations & contracts Contract Performance Report – DI-MGMT-81466A * 5 Formats (WBS, Organization, Baseline, Staffing & Explanation) Integrated Master Schedule – DI-MGMT * (Mandatory for DoD EVMS contracts) Integrated Baseline Review (IBR) - Mandatory for all EVMS contracts * See the EVMIG for CPR and IMS tailoring guidance. Management Reserve Work PackagesPlanning Packages OVERRUN AUW Control Accounts NCC Undistributed Budget OTB CBB TAB Profit / Fees PMB Summary Level Planning Packages Contract Price DoD TRIPWIRE METRICS Favorable is > 1.0, Unfavorable is < 1.0 Cost Efficiency CPI = BCWP / ACWP Schedule Efficiency SPI = BCWP / BCWS VARIANCES Favorable is Positive, Unfavorable is Negative Cost Variance CV= BCWP – ACWPCV % = (CV / BCWP) * 100 Schedule Variance SV= BCWP – BCWSSV % = (SV / BCWS) * 100 Variance at CompletionVAC= BAC – EAC OVERALL STATUS % Schedule = (BCWS CUM / BAC) * 100 % Complete= (BCWP CUM / BAC) * 100 % Spent= (ACWP CUM / BAC) * 100 BASELINE EXECUTION INDEX (BEI) (Schedule Metric) BEI = # of Baseline Tasks Actually Completed / # of Baseline Tasks Scheduled for Completion CPLI = (Critical Path Baseline Duration + Float Duration) / Critical Path Baseline Duration CRITICAL PATH LENGTH INDEX (CPLI) (Schedule Metric) TO COMPLETE PERFORMANCE INDEX (TCPI) # § TCPI EAC = Work Remaining / Cost Remaining = (BAC – BCWP CUM ) / (EAC – ACWP CUM ) ESTIMATE AT COMPLETION # EAC= Actuals to Date+ [(Remaining Work) / (Efficiency Factor)] EAC CPI = ACWP CUM + [(BAC – BCWP CUM ) / CPI CUM ] = BAC / CPI CUM EAC Composite = ACWP CUM + [(BAC – BCWP CUM ) / (CPI CUM * SPI CUM )] # To Determine a Contract Level TCPI or EAC; You May Replace BAC with TAB § To Determine the TCPI BAC,LRE Replace EAC with either BAC or LRE Earned Value Management ‘Gold Card’ Management Reserve Cost Variance Schedule Variance ACWP BCWP BCWS $ EAC Time Now Completion Date PMB TAB BAC time