Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May UNIFIED REGIONAL PLANNING OF ELECTRICITY AND GAS DISTRIBUTION NETWORK WITH GIS ORIENTED PLANNING SOFTWARE
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May METHOD PHASE II Prediction of energy consumption till FAZA III Technical and economical optimisation of gas and electricity distribution systems PHASE I BASIC PLATFORM Questionnaire on energy consumption in households, services, industry and agriculture
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May QUESTIONNAIRE AND ENERGY CONSUMPTION ANALYSES 4 ZONES 1 – apartment buildings in Beli Manastir 2 – family houses in Beli Manastir 3 – larger settlements 4 – smaller settlements 3 % of households 20 % of services all industry and agriculture SCOPE:
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May STRUCTURE OF TOTAL FINAL ENERGY CONSUMPTION
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May TOTAL FINAL ENERGY CONSUMPTION
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May GAS NETWORK MODEL
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May GAS NETWORK MODEL
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May ECONOMICAL OPTIMISATION OF GAS NETWORK - CRITERIA gas selling price: 0,23 €/m 3 for households, 0,18 €/m 3 for services, 0,15 €/m 3 for industry and agriculture gas buying price: 0,13 €/m 3 increase of gas consumption YEAR CONSUMPTION INCREASE (%)
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May ECONOMICAL OPTIMISATION OF GAS NETWORK - RESULTS whole system11,425,68,0 IRR = 12 %5,819,011,4 IRR = 14 %3,515,014,0 Max. profit2,211,715,8 IRR = 10 %8,422,99,7 IRR (%) CONSUMPTION (million m 3 ) INVESTMENT (million EUR) ECONOMIC CONDITION
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May ELECTRICITY NETWORK MODEL
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May ELECTRICITY NETWORK MODEL
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May ECONOMICAL OPTIMISATION OF ELECTRICITY NETWORK - CRITERIA load up to 100 % of thermal current under normal conditions and up to 120 % under fault conditions admissible voltage drop in 10(20) kV network up to 8 % under normal conditions and up to 12 % under fault conditions “N-1” criteria for the peak load over 1 MVA investment in power delivery quality if justified by lower costs of undelivered energy and losses reconstructions of major electricity distribution objects - 110/35 kV and 35/10 kV substations and 35 kV lines – older than 40 years
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May ECONOMICAL OPTIMISATION OF ELECTRICITY NETWORK - RESULTS independent electricity distribution network planning no gas distribution network ASSUMPTIONS:
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May ECONOMICAL OPTIMISATION OF ELECTRICITY NETWORK - RESULTS
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May CONCLUSION Investments in gas network can have significant impact on investments in electricity network Supply of gas to entire Baranja region lowers the necessary electricity network investments by 47% Almost all savings are achieved with the most profitable investment in the gas network Such synergies can be expected when large electricity network investments (like major substation or line) can be avoided by partial substitution of electrical energy consumption with gas