SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.

Slides:



Advertisements
Similar presentations
Parallel session for topics: EE-05 Deep renovation of buildings EE-06 Demand response in blocks of buildings EE-02 Design of new high performance buildings.
Advertisements

Enterprise Resource Planning
Guilford County Schools ENERGY MASTER PLAN for School Facilities July 25, 2008 Facilities Planning and Construction Department Maintenance Department.
ITIL: Service Transition
PEOPLE MANAGEMENT DEVELOPMENT PROGRAM
Contractor Safety Management
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
CERN Safety Alarm Monitoring (CSAM) CERN Safety Alarm System Supervisory Board 6st meeting Luigi Scibile & CSAM project team.
Program Management Overview (An Introduction)
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
Comprehensive M&E Systems
Capital Planning Update 1 Senate Fiscal Committee/COPE Presentation January 3, 2012.
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
APPLYING ENERGY MANAGEMENT STANDARDS AT HIGHER SCHOOL EDUCATIONAL ESTABLISHMENTS EUGENE GASHO, INSTITUTE FOR ENERGY EFFICIENCY PROBLEMS, NATIONAL RESEARCH.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Engineering Management From The Top Power Behind the Storage.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
GS Annual Training plan D. Klem Big picture D. Klem 2 Purpose of Training has twofolds As defined in the SR&R :(SII 3.01) ‘The purpose of training.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
CERN campus: mapping of the building versus energy consumption and an example of design and construction of a green building. Luigi Scibile CERN, General.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
TS, Length of YETS EYETS LIU & CONS Project
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Chapter 3 Strategic Information Systems Planning.
Capital Renewal Plan Update May Recent Projects.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Chapter 11 Managing Application Development. Agenda Application management framework Application management issues Criteria for development approach Development.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
GTPE 04/06/15 L. Scibile 04/06/ EDMS:
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Survey Meeting John Osborne, CERN 8 February 2016
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
TE-CRG Activities D. Delikaris, TE-CRG.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
11 ADM2372 Management Information Systems (MIS) Chapter 10 – Part I Systems Development Chapter 10 – Part I Systems Development.
Chapter 15 Telecommunication Department Management.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
EEA Grants Norway Grants Prison Service of the Czech Republic Opava Prison and Preventative Detention Facility August 14, 2013.
ValleyView Publishing.  To achieve a suitable location for the new office will be determined  To establish administrative systems  To establish an.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
THE VALUE (SUPPLY) CHAIN STRETCHES FROM THE BEGINNING OF YOUR SUPPLIER’S SUPPLY CHAIN THROUGH ALL OF YOUR PROCESSES THAT CREATE VALUE FOR YOUR CUSTOMERS.
I. Bergevoet - Training preparation
SMB Department LS2 period main activities Luigi Scibile (SMB-SE) on behalf of SMB
Development and Application of Innovative services in the Directorate of Transport and Communications Region of Crete, Greece Dr. Nikolaos Raptakis 15.
Safety Documentation EHN1
Safety in Construction and Upgrade Phases
Buffer Zones - Status Report
Graduation Project (II): Operations Improvement at Mhanna Factory
Special LS1 day on 12 June 2012, EDMS:
RWTCS Steering Commitee
Luigi SCIBILE on behalf of the CERN SMB-SE group
VENDORS, CONSULTANTS AND USERS
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Alignment of COBIT to Botswana IT Audit Methodology
Regional Operations Forum Setting the Stage
Presentation transcript:

SMB SMB-SE group L. Scibile 1

SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures and the technical services for the tertiary part of the organization. The abovementioned responsibilities include all phases from design and construction to operation and maintenance of complete built assets. 2

SMB Groups scope 3 From minor works to construction From Design and Operation & Maintenance to complex projects

SMB Groups objectives and priorities Objectives: – FUTURE ACCELERATOR STUDIES – a world class expertize. – PROJECTS – a productive and efficient team. HL-LHC, LS2 and Consolidation of the infrastructure – SERVICES – a service oriented culture. Priorities: – Safety – Strategic projects ( HL-LHC, LS2 and Consolidation of the infrastructure ) – Machine availability – Users satisfaction 4

SMB SAFETY RISKS : – The risk of an accident is higher when underestimated. – In the case of doubts, ask your supervisor or your DSO. – Adapt your behavior to the situation. For the newcomers: – Get informed and trained about the specific risks on the CERN site: Safety rules: Regulations/en/Pages/default.aspxhttps://espace.cern.ch/Safety-Rules- Regulations/en/Pages/default.aspx Safety Training: official/Pages/default.aspxhttps://espace.cern.ch/info-safetytraining- official/Pages/default.aspx For the supervisors: – Brief your supervisee about the risk they might face on their new assignments. 16/12/14 EDMS: Habilitation Electrique !!!!

SMB 6 Group Structure

SMB 7 Group Structure Studies for future accelerators and existing tunnel structures Studies for future accelerators and existing tunnel structures Mainly machine Mainly tertiary Project execution Patrimony and External relations Consolidation program execution Works, Operation and Maintenance

SMB SECTIONS’ PRESENTATIONS 8

SMB The group in numbers 2015 Budgets: – Projects: ~43 MCHF – Operation: ~7 MCHF Budgets: – Projects: ~30 MCHF – Operation: ~7 MCHF + ~ 10 MCHF on other departments budgets + ~ 20 MCHF on other departments budgets

SMB Group core activities (1/2) Projects – Civil Engineering for the accelerators (Machine) – Civil Engineering for the site (Tertiary) Studies – New accelerators and experiments – MasterPlanning – Modifications and usage of current infrastructures – Energy usage and strategies 10

SMB Group core activities (2/2) Services – Building, tunnels and road maintenance, repairs, minor works – HVAC maintenance and works for tertiary buildings – Sanitary maintenance and works for tertiary buildings – Electricity maintenance and works for tertiary buildings – Patrimony and GIS – CERN district heating operation and maintenance – Engineering support In the last 12 months, ~14000 interventions were carried out! 11

SMB Hard Facility Management Services Increase efficiency with integrated tools In renew all the framework contracts Implement small value frame contracts with specialized local companies (sanitary, insulation) Clarify and negotiate new perimeter of intervention with EN to increase overall efficiency. Review the limit of the services provided. 12

SMB Site Engineering design services Increase capacity of design integration Strengthen support to other sections through streamlined/standard procedures/templates. 13

SMB Projects Setup a strong team for the HL-LHC civil engineering works. Implement the consolidation program Strengthen scheduling and control with a master schedule activity. Implement improved standards for the quality control. New organization of the Project Office section 14

SMB Development of a new activity for the long term monitoring and maintenance planning of the existing tunnel infrastructures: Tunnel Asset Management. 15 Future Accelerator Studies

SMB Main projects LS2 CMS - Extension of assembly hall (1000 m2) ALICE - potential extension of the computer farm B867bis LHCb - New computing farm HL-LHC: Civil engineering design and construction New radioactive storage building B245 Building renovation of the AD target Approved Pending approval B311 LS2 activities preparation and works (> 150) Civil Engineering for the SPS dump EHN1 extension PolymerLab RWTC building B107

SMB LS2 effort

SMB Conclusion Rump up of the HL-LHC civil engineering effort. Ring-fence resources required to carry out the consolidation activities. Seize the opportunity to increase efficiency through supporting tools integration allowing automated control, scheduling and quality management in the overall execution of the technical services (converge to a common ERP solution with FAP and IPT). 18