Www.egi.eu EGI-InSPIRE RI-261323 EGI-InSPIRE www.egi.eu EGI-InSPIRE RI-261323 Status of ARGUS support Peter Solagna – EGI.eu.

Slides:



Advertisements
Similar presentations
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks From ROCs to NGIs The pole1 and pole 2 people.
Advertisements

EGI-InSPIRE RI EGI-InSPIRE RI EGI-InSPIRE EGI services for the long tail of science Peter Solagna Senior Operations.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Future support of EGI services Tiziana Ferrari/EGI.eu Future support of EGI.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EG recent developments T. Ferrari/EGI.eu ADC Weekly Meeting 15/05/
Ian Bird LHCC Referee meeting 23 rd September 2014.
Apr 30, 20081/11 VO Services Project – Stakeholders’ Meeting Gabriele Garzoglio VO Services Project Stakeholders’ Meeting Apr 30, 2008 Gabriele Garzoglio.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Report Mario Reale NGI IT / GARR HEPiX f2f meeting.
EMI is partially funded by the European Commission under Grant Agreement RI Argus Policies Tutorial Valery Tschopp - SWITCH EGI TF Prague.
RI EGI-InSPIRE RI EGI Future activities Peter Solagna – EGI.eu.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-EGI Grid Operations Transition Maite.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Enforcement of the personal data retention policy Peter Solagna, EGI.eu WLCG.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI (Present and) Future of the EGI Services for WLCG Peter Solagna – EGI.eu.
Emergency Suspension list Vincent BRILLAULT HEPiX Spring 2014, Annecy.
EGI-InSPIRE RI EGI.eu European Grid Infrastructure EGI-InSPIRE RI Credential Validation Middleware Requests compiling.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
Accounting Update John Gordon and Stuart Pullinger January 2014 GDB.
EMI INFSO-RI Argus The EMI Authorization Service Valery Tschopp (SWITCH) Argus Product Team.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI How to integrate portals with the EGI monitoring system Dusan Vudragovic.
PIC port d’informació científica EGEE – EGI Transition for WLCG in Spain M. Delfino, G. Merino, PIC Spanish Tier-1 WLCG CB 13-Nov-2009.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Ops Portal New Requirements.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Evolution of AAI for e- infrastructures Peter Solagna Senior Operations Manager.
CernVM-FS Infrastructure for EGI VOs Catalin Condurache - STFC RAL Tier1 EGI Webinar, 5 September 2013.
EMI Inter-component and Large Scale Testing Infrastructure Danilo Dongiovanni INFN-CNAF.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI SAM New Requirements from the SA1 Survey.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Requirements Status EGI.eu UCB
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Plans for PY2 Steven Newhouse Project Director, EGI.eu 30/05/2011 Future.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI CSIRT Procedure for Compromised Certificates and Central Security Emergency.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Operations Portal Development Update on Requirements Cyril L'Orphelin IN2P3/CNRS.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI UMD Roadmap Steven Newhouse 14/09/2010.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Security Monitoring Daniel Kouřil EGI-TF 2011.
EMI INFSO-RI Testbed for project continuous Integration Danilo Dongiovanni (INFN-CNAF) -SA2.6 Task Leader Jozef Cernak(UPJŠ, Kosice, Slovakia)
EMI is partially funded by the European Commission under Grant Agreement RI Argus Policies Tutorial Valery Tschopp (SWITCH) – Argus Product Team.
EGI-InSPIRE RI EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Etienne Dublé.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI-InSPIRE PY5 new activities Peter Solagna – EGI.eu.
Setting up NGI operations Ron Trompert EGI-InSPIRE – ROD teams workshop1.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Resource allocation Małgorzata Krakowian 1.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Regionalisation summary Prague 1.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Dashboard for Operations Cyril L’Orphelin.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Enabling SSO capabilities in the EGI Cloud services Peter Solagna – EGI.eu.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Questionnaires to Cloud technology providers and sites Linda Cornwall, STFC,
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Storage Accounting John Gordon, STFC OMB August 2013.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GLUE 2: Deployment and Validation Stephen Burke egi.eu EGI OMB March 26 th.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Resource allocation brainstorming space
INDIGO Outreach and Exploitation process Peter Solagna, Matthew Viljoen EGI.eu.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Update on Service Availability Monitoring (SAM) Marian Babik, David Collados,
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Regional tools use cases overview Peter Solagna – EGI.eu On behalf of the.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Evaluation of Liferay modules EGI-InSPIRE mini-project Gergely Sipos EGI.eu.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI VO Services Activities VO Services Activities NA3 F2F Meeting (3/03/2011)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks GOCDB4 Gilles Mathieu, RAL-STFC, UK An introduction.
EGI-InSPIRE EGI-InSPIRE RI Network Troubleshooting and PerfSONAR-Lite_TSS Mario Reale GARR.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI A pan-European Research Infrastructure supporting the digital European Research.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Release Process Michel Drescher, EGI Kostas Koumantaros, GRNET 7/5/2016.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Argus gLite Authorization Service Workplan.
Maria Alandes Pradillo, CERN Training on GLUE 2 information validation EGI Technical Forum September 2013.
RI EGI-InSPIRE RI Puppet community Next steps Peter Solagna – EGI.eu.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI APEL Regional Accounting Alison Packer (STFC) Iván Díaz Álvarez (CESGA) APEL.
EGI-InSPIRE RI EGI-InSPIRE RI EGI-InSPIRE Software provisioning and HTC Solution Peter Solagna Senior Operations Manager.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI MPI VT report OMB Meeting 28 th February 2012.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI New GOCDB roles schema OMB January 2012 Peter Solagna – EGI.eu 9/30/2016.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI SA1.2 Plans 2013 Security Operations David Kelsey (STFC) 26/02/2013 Operations.
Argus EMI Authorization Integration
Advancements in Availability and Reliability computation Introduction and current status of the Comp Reports mini project C. Kanellopoulos GRNET.
Peter Solagna – EGI Foundation
Operations Management Board April 30
EGI operations - news T. Ferrari/EGI.eu 12/9/2018.
Operations sustainability
Operations Management Board March 26
Presentation transcript:

EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Status of ARGUS support Peter Solagna – EGI.eu

EGI-InSPIRE RI The issue SWITCH, the main developer of ARGUS, is planning to stop supporting the code and the support unit in GGUS. Currently on best effort Critical component we need prompt support for critical problems Both EGI and WLCG asked their partners for expressions of interest to collaborate to the maintenance of ARGUS 6/21/2016 2

EGI-InSPIRE RI What is supported currently? As reported to this CERN twiki:twiki –PEP client and server: no future support –PAP: INFN –PDP: no future support –ARGUS EES: NIKHEF –LCMAPS plugin: NIKHEF Received expressions of potential interest from other partners/NGIs

EGI-InSPIRE RI Why push for ARGUS? The component has been developed thinking about the needs of our infrastructure The central user suspension campaign has started before the issues about support Already widely used by WLCG  available in many site

EGI-InSPIRE RI Alternatives? There are no real alternatives at the moment OSG is using/developing a similar component –To evaluate scalability and hierarchical configuration The best option would be to find an institution to support the orphan Argus components. If interested, please contact

EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Central user suspension Status and roadmap Sven Gabriel Peter Solagna

EGI-InSPIRE RI Current status Almost all NGIs have deployed the national ARGUS instance –Thank you! This completes the first step of the campaign

EGI-InSPIRE RI Second step: monitoring NGI Monitoring of the national ARGUS instances by EGI CSIRT –Active monitoring of the effective propagation of the suspended user DNs (using test DNs) –Quick feedback to NGIs in case of misconfiguration or other issues that prevent the proper propagation of suspension information The monitoring framework will be ready by the end of October 2014

EGI-InSPIRE RI Monitoring What: NGI-Argus services get updated banning information Needed: –Nagios probe (Done, Vincent Brillaut, CERN) –List of NGI-Argus Servers (hostnames + DNs) This information needs to be available by a goc-db query, consumers are: central argus at CERN to create a white-list of hosts allowed to fetch the ban list nagios system needs a list of services to send the probe to (only NGI ARGUS servers) Site Argus serices are *not* part of this Monitoring, they might not allow access from outsite, they might be an alternate service in the case of non-argus sites

EGI-InSPIRE RI Third step: pilot testing From November first sites will be able to reliably download suspension information from their NGI arguses. Start a pilot testing with few sites (4-5) in order to find issues in the configuration or in the available documentation. –Better to have sites with different middleware Starting end of October Possibly ending for middle November

EGI-InSPIRE RI Third step: wide deployment Starting from end of November To be concluded by the end of the first quarter 2015? Once the pilot sites have finished their configuration the documentation should be enough clear and reliable: the effort for the sites should be reduced to a minimum

EGI-InSPIRE RI Next steps: testing sites Test if ban information is available at the sites services: CE/SE/WMS (action on EGI- CSIRT) Needed: test DN registered at OPS-VO (action Nikhef/ OPS-VO) Open issues: –Cloud services consume ARGUS ban information? –Pilot-Job technologies might need to be re- checked in the central banning context.

EGI-InSPIRE RI Proposed timeline October 2014: monitoring NGI ARGUSes November 2014: Pilot sites to implement central emergency user suspension mechanism December 2014: Start of a wider deployment campaing April 2014: most of EGI sites implemented the suspension mechanism Beyond: sites are monitored for this feature