Mike Andrews August 30, 2012. Weeks 1-5 Activities Rad survey open to supervised access & re-core Install crane electronics & remove shield wall Retrieve.

Slides:



Advertisements
Similar presentations
Target chase, decay and absorber cooling for LBNE A. Marchionni, Fermilab 8th International Workshop on Neutrino Beams & Instrumentation CERN, November.
Advertisements

Heating, Ventilating, and Air-Conditioning
 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities, Now Three I.Target Hall NT-05 has been secured.
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
Status of BNB Horn Changeout Kris E. Anderson All Experimenter’s Meeting 02-Feb-2015.
NuMI Target Pile Fan Repair Michael Andrews 3/15/10.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
Special Report NuMI Target Updates Special Report NuMI Target Updates Status Update I.Target Hall Target module ready to accept new target General target.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
NuMI Run II meeting Nov. 4, 2004 NuMI Target Hall Jim Hylen Page 1 NuMI Target Hall Status / Plan 8 slide introduction to target hall 9 slide list of status.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
NuMI Target Station AHIPA09 10/19/09 Jim Hylen/FNAL Page 1 Target Station Infrastructure: The NuMI Experience Focus of this talk: Hot handling Target pile.
NuMI Target Hall Performance/Plans Jim Hylen DOE Tevatron Operations Review March 27, 2007.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
120 GeV Targeting Neutrino beams utilizing 120 GeV protons from Project X Main Injector Jim Hylen Fermilab AAC meeting August 8, 2007 With thanks to Patrick.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
Secondary beam production facility layout discussions SBLNF meeting 5 th Dec M. Calviani, A. Ferrari, R. Losito (EN/STI) H. Vincke (DGS/RP)
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
Status of UK contribution to LBNF beam and target system Chris Densham, Tristan Davenne, Otto Caretta, Mike Fitton, Peter Loveridge, Joe O’Dell, Andrew.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
Neutrino Beamline Scaling Robert Zwaska Fermilab June 4, 2014 PIP-II Collaboration Meeting.
NuMI horn stripline failure, analysis, and recovery or The Case of the Cracked Stripline P. Hurh* Fermilab April *On behalf of Target Systems.
LBNE Target Pile & Decay Pipe Cooling Andy Stefanik and Ang Lee – Fermilab September 25, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
120 GeV Targeting Overview Neutrino beams utilizing 120 GeV protons from Project X Main Injector Jim Hylen Accelerator Physics and Technology Workshop.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Engineering Issues for the NuMI Beamline at 2 MW Accelerator Physics and Technology Workshop for Project X P. Hurh Fermilab
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
AD ops. - NUMI July 7, 2006 Jim Hylen/FNAL Page 1 Had been having problem with water collecting in tank under horn 1, instead of coming back to surge tank,
CBETA Technical Review
Cryoplant Installation Scope
Heating, Ventilating, and Air Conditioning
Heating Ventilating and Air Conditioning
News and brief overview of Beamline plans for the next few months
NuMI - Shutdown – Week 9 Horn 2 Repair – Successfully Tested the Repaired RAW Leak Drained and Refilled Horn 1 and 2 RAW Systems Changed Horn 2 DI Bottle.
Heating, Ventilating, and Air-Conditioning
ARIEL Phase I Operations
Polarized 3He target installation
Presentation transcript:

Mike Andrews August 30, 2012

Weeks 1-5 Activities Rad survey open to supervised access & re-core Install crane electronics & remove shield wall Retrieve helium samples from Target Take water (tritium) samples from NuMI drain system Drain water from all RAW systems & change filter Move all DI bottles to TSB Change out Target Pile fan pre-filters Drain glycol from TP chiller from reuse (900 G) Carrier & Pre-Target drain & drip ceiling cleaning

Weeks 1-5 Activities Lighting & electrical service upgrades Target Pile dehumidifier repairs & upgrades Horn 2 RAW system upgrades in Target Hall Relocated TP fan controls & sum box Target Pile fan coiling coil upgrade & repair Replace Pre Target Magnets Q113, Q114, & Q120 Electrical cable pulls from shaft to hobbit Target RAW system upgrades in RAW room Replace NuMI stub magnets Q111 & Q112

Horn 2 RAW System Upgrades

PT Quad Magnet Installation

MI Quad Magnet Installation

TP Dehumidifier Coil Box

NuMI Target Hall

Weeks 6-10 Activities During re-fill of TP chiller two existing TP fan cooling coils found to be leaking glycol Leaking cooling coils removed and new units ordered Continue TP dehumidifier repairs & upgrades Reconfigure SR-3 exhaust ventilation duct work Installation of new DP dehumidifier condenser unit Horn 2 RAW system upgrades Borascope & leak test heat exchangers on Horn 1 & 2 and Decay Pipe. Corrosion & leaks found. Order new heat exchanges for all three units

Weeks 6-10 Activities Install Target Hall equipment for remote handling ops Horn 1 RAW system upgrade Move Target & Horn 1 from chase to morgue Move Horn 2 from chase to work cell Repair Decay Pipe dehumidifiers 4 & 5 Upstream Decay Pipe RAW system upgrade Install Target Hall rail system

Weeks 6-10 Activities Horn 2 relocation to ME position Remove shielding blocks Cut out & remove welded sheet metal air dam Survey & reference void face points of US and DS Blue Blocks Reinstall the 3 blue blocks and 2 floor shielding blocks in the ME void Move 8 blue blocks coffins from MI65 to PW6 Complete drafting for new US & DS blue blocks Start fabrication of new US & DS blue blocks at MAB

DP Dehumidifier Condenser Unit

RAW Skid Upgrades

Target T-Blocks

Target NT-07

NuMI Horn 1

NuMI Horn 2

Blue Block Removal

Horn 2 ME Location

Weeks Activities Target DI loop upgrade Continue with Decay Pipe dehumidification upgrade Horn 2 DI loop upgrade Complete MI to NuMI Pre-Target cable pulls Horn 1 DI loop upgrade Leak testing of new DI bottles & casks Decay pipe US DI loop upgrade Install cooling system for pulse power supply cooling Target & Horn 2 Impulse line upgrade

Weeks Activities Horn 2 relocation to ME position Continue to fabricate new US & DS shielding blocks at MAB Install all custom shield blocks in chase Assemble, survey & install T-block support system in chase Assembly, survey & install Horn 2 carriage support system Extend air-seal over US & DS ends of Horn 2 ME void Re-install 2 US blue shielding blocks in chase Reinstall 7 R-blocks over chase US of new Horn 2 ME position

New Custom Shielding Blocks

T-Block Support System

Horn 2 Carriage Support Assembly

Pulse Power Supply Cooling

DI Bottle & Cask Leak Testing

Weeks Activities Target Hall Target & Horn 1 drain system upgrade Complete install Horn 2 RAW piping to ME location Install new Target Pile fan cooling coils Absorber RAW upgrades Horn 2 relocation to ME position Rebuild the T-Block staging area downstream doghouse Move Horn 2 into new ME location in chase Move T-blocks from Horn 2 LE location to ME location Survey Horn 2 in chase Move 13 new T-blocks from MAB to Target Hall T-block storage area Install new T-blocks into old Horn 2 LE location Install air seal on Horn 2 chase opening Reconfigure battlement

Horn 2 Relocation

Horn 2 T-Block Installation

Horn 2 ME Assembly In Place

Moving Forward Now through October 30 th Battlement reconfiguration Install new air dam over Horn 2 LE position Repair damaged stripline washers Install new stripline section for Horn 2 ME location Horn 2 RAW water lines to Horn 2 Extend instrumentation cables Installation of new DI bottles & casks Complete installation of replacement cooling coils on Target Pile fan.

Moving Forward Now through October 30 th Start up Target Pile fan & chase dehumidification Install new heat exchangers on Horn 1&2 and Decay Pipe RAW skids Complete Absorber RAW upgrades Start up RAW skids NoVA Target & Horn 1 ready for installation Install five new multi-wires in NuMI beamline November 1 st through February 1 st Install new Target & Horn 1 Start up all support systems

Thanks goes to……… Abhishek “Dez” Deshpande, Karl Williams, Dirk Hurd Salman Tariq, Eric Pirtle, Dave Tinsley, Rich White Kris Anderson, Hiep Le, Chris Kelly, Rob Reilly Cory Crowley, Lee Hammond, Jim Ranson Paul Kasley, Kevin Roon, Ken Bourkland Tony Busch, Paul Sedory The crew – Cervando Castro, Keith Anderson, Mike Stiemann, Jim Zahurones, Bob Albrecht, Orlando Rivera, Chris Payne, Henry Schram, Paul Gentry T&M: Prism, SEA, Arlington, Joliet Steel, ECO