Mitglied der Helmholtz-Gemeinschaft June 26th 2013XLV. PANDA Collaboration meeting1.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

The Central Straw Tube Tracker In The PANDA Experiment
PANDA GSI 13.June 2006 TAG-PID Georg Schepers PANDA Technical Assessment Group PID Second Meeting: Separation Power and Detector Performance.
Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
1 Hall-D CB+EG Meeting Report George Lolos University of Regina May 22, 2004.
Using Logic Models in Program Planning and Grant Proposals The Covenant Foundation.
Lessons from Thematic Working Groups. Getting to Scale: NEEDS Capacity building at all levels – – for all Focus on the most vulnerable Conceive appropriate.
From Cave C to R3B: Time Schedule 2008 Experiments with upgraded setup: proton arm, Si detectors, QFS detection system 2009 Implementation of new readout.
Oct. 5 th th International Workshop on Heavy Quarkonium 2011 Jim Ritman Mitglied der Helmholtz-Gemeinschaft Status of PANDA.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
SKA-Japan Industry Forum [SKA-Japan Workshop 2010] EMC & Microwave Systems November 05, 2010.
HPS Budget and Schedule Marco Oriunno, June 4-6, 2013 HPS Collaboration Meeting, JLAB.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Mitglied der Helmholtz-Gemeinschaft ZEA-1 | Technology for Excellent Science SKADI - Report FZJ Meeting Lund Romuald Hanslik FZJ/ZEA-1 1.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
© Dr. John T. Whiting All Rights Reserved Slide 1 Information Technology – The Key to Public Education Reform Based.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
ATTRACT – From Open Science to Open Innovation Information Sharing Meeting Brussels, June 19, 2014 Markus Nordberg (CERN) Development and Innovation Unit.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
The Commissioning of the CLAS12 Detector V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 workshop, June 21 st 2011.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
National Science Foundation (NSF). Directorate for Computer and Information Science and Engineering (CISE)
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
THE PROJECT “THE YOUTH AGAINST VIOLENCE”. Project financed from the European Social Fund and implemented by the Ministry of Education, Research and Innovation,
Using Logic Models in Program Planning and Grant Proposals The Covenant Foundation.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
PANDA GSI 13. December 2006 PID TAG Georg Schepers PANDA Technical Assessment Group PID Status Report G. Schepers for the PID TAG GSI PID TAG.
Online Reconstruction 1M.Ellis - CM th October 2008.
James Ritman FZ Juelich EU Design Kick Off Meeting General Introduction: Physics/Design requirements Four Tasks A)Photon detection and readout for DIRC.
9/2/2004 TB Strategy J. Yu 1 LC Test Beam Funding and Strategy Large number of detector R&D groups made great progress Technology decision provides great.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
COMET μ-e conversion search at J-PARC. μ-e conversion physics SUSY-GUT, SUSY-seesaw (Gauge Mediated process) – BR = = BR(μ→eγ) × O(α) – τ→lγ SUSY-seesaw.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Argonne’s Rôle in ZEUS José Repond Argonne National Laboratory DOE Visit, Germantown, March 11 th, 2004.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
REQUESTING THE NSF/NCAR GV FOR THE ECLIPSE 2017 MISSION Brigitte Baeuerle, EOL.
SU participation in nn bar Sam Silverstein. Who are we? Particle physics group  ATLAS  IceCube Instrumentation physics division  ATLAS L1Calo trigger.
NSF INCLUDES Inclusion Across the Nation of Learners of Underrepresented Discoverers in Engineering and Science AISL PI Meeting, March 1, 2016 Sylvia M.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
Mitglied der Helmholtz-Gemeinschaft Development of 3D Polarimeters for storage ring EDM searches JEDI Collaboration | David Chiladze (IKP, Forschungszentrum.
Joint Institute for Nuclear Research Status of the magnet for the PANDA Target Spectrometer Report from Dubna A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov,
Cluster-Jet Target Target TDR Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Collaboration Meeting December 8-12, 2008.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
March Nunavut Wildlife Research Trust & Nunavut Wildlife Studies Fund  There are a number of documents that relate to the NWRT and NWSF:  1.)
June-18 th -2007ATLAS-MPI; Status of ATLAS Technical Paper, R. Richter1 The ATLAS Technical Paper and back-up papers  Content of the ATLAS technical paper.
Cluster Host Preparation Meeting Autumn Term 1a Overview and Action Planning Judith Carter Senior Adviser Complex Needs/Vulnerable Learners
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
Status of HESR 18th March Gießen Dieter Prasuhn.
PANDA Muon Group Meeting, Protvino 7 June 2011 G
PANDA collaboration meeting FEE session
Agenda Status of the FP7 HP3 Proposal (5+5) (A. Khoukaz)
PANDA Mechanical Design
STT Status Update Peter Wintz (FZ Jülich) for the STT group
muon subgroup meeting Report on TDR activities since dec2011
CLIC detector at SiD meeting 28/3/2010
What is ATTRACT? ATTRACT (breAkThrough innovaTion pRogrAmme for deteCtor / inrAstructure eCosysTem) A proposal from CERN to the European Commission (EC)
ITEP /4/2010 – II Panda Russia Meeting – Maria Pia Bussa
Work packages status in Torino and perspectives
CMS Goal of the experiment
إستراتيجيات ونماذج التقويم
Andrei Seryi Materials for discussion TILC-08
L H C A T L A S International Collaboration on the LHC Project
Presentation transcript:

Mitglied der Helmholtz-Gemeinschaft June 26th 2013XLV. PANDA Collaboration meeting1

Mitglied der Helmholtz-Gemeinschaft Preassembly Funding Request… (FZJ Investitionsfonds) June 26th 2013XLV. PANDA Collaboration meeting2 → (Fri, 3 May 2013): Dear colleague, …In a recent discussion, our division head, Sebastian Schmidt (member of the board of directors), requested that the Jülich contribution is put in context with the total cost for the preassembly. The goal is that we make a presentable package turning the preassembly into a proper and visible project. Thus, we need to list the external contributions during the preassembly phase. We would appreciate if you could tell us about the money that you will have to invest in the preassembly. The list can include manpower… Many thanks for your valueable input !!! → only integral number of money contributions, manpower, hardware, traveling money, list of components communicated → wait for decision on next board-of-directors meeting

Mitglied der Helmholtz-Gemeinschaft Preassembly Funding Request… June 26th 2013XLV. PANDA Collaboration meeting3 NRW-FAIR revival: letter of Sebastian Schmidt to Rectors of the NRW-Universities (Bochum, Bonn, Iserlohn, Münster) in order to contact Svenja Schulze (NRW minister for Innovation, Science & Research) potential contribution via FAIR GmbH ? integration in COSTBOOK ? (pre-assembly common fund ? )

Mitglied der Helmholtz-Gemeinschaft Beam Time in 2013/14 June 26th 2013XLV. PANDA Collaboration meeting4

Mitglied der Helmholtz-Gemeinschaft Beam Time in 2013/14 June 26th 2013XLV. PANDA Collaboration meeting5 PAC

Mitglied der Helmholtz-Gemeinschaft June 26th 2013XLV. PANDA Collaboration meeting6

Mitglied der Helmholtz-Gemeinschaft System and sub-system managers June 26th 2013XLV. PANDA Collaboration meeting Systems and sub-systemsName MagnetsLars Schmitt (prov.) Solenoid coil & cryostat Pellet Target Renzo Parodi Solenoid return yokeAlexander Vodopianov DipoleLars Schmitt (prov.) Support & positioningEdward Lisowski TargetsAlfons Khoukaz Pellet TargetMarkus Büscher Cluster TargetAlfons Khoukaz Beamline and interaction region Dieter Prasuhn Silicon detectorsKai T. Brinkmann PixelsDaniela Calvo StripsTobias Stockmanns Luminosity MonitorMiriam Fritsch TrackersPaola Gianotti STTPeter Wintz Endcap GEMBernd Voss Forward trackersJerzy Smyrski EMCRainer Novotny BarrelAndrea Wilms FW-Endcap BW-Endcap Fritz-Herbert Heinsius David Rodriguez Forward ShashlykPavel Semenov Charged Particle IDCarsten Schwarz Barrel DIRCJochen Schwiening Endcap CherenkovKlaus Föhl, Björn Seitz Forward RICHRalf Kaiser TOFCarsten Schwarz Muon system Genadi Alexeev, Maria Pia Bussa (deputy) Hypernuclei equipmentJosef Pochodzalla ElectronicsPiotr Salabura Frontend Electronics Angelo Rivetti, Myroslav Kavatsyuk (deputy) DAQ/TriggerWolfgang Kühn Control systemsLars Schmitt (prov.) Systems and sub-systemsName 7

Mitglied der Helmholtz-Gemeinschaft readiness for pre-assembly (slide of dec 2012) June 26th 2013XLV. PANDA Collaboration meeting Number of issues to be addressed  space requirements  staging (e.g. availability of other detector components)  which detector will come when?  Status and time planning of mechanical construction;  Status and major results of prototype performance evaluations;  Status and time planning of engineering drawings;  Availability of crucial detector components;  Status and time planning of the readout system;  Specific goals of the pre-assembly: which systems integrated subsystems have to function together; which results are expected from the pre-assembly or system tests. Sourcing human, financial and material resources need input asap 8