Top 10 Ways to Expedite Design Reviews & Inspections.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
SCOTT ELEVATOR CONSULTANTS
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Preparing Designated/Auxiliary FY11 Operating Plans.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
Alternative Project Delivery
Job Order Contracting ( JOC) Chicago Department of Aviation Capital Improvement Program Panel member: Joseph S. Dote, Sr. Vice President R.M. Chin & Associates,
CTC-470 Construction Administration Project Management Concepts.
Project Closeout Issues A Review of Critical Tasks Required During the Closeout Process.
Capabilities Presentation Please select the button above that best describes your interest to learn more about how Formare Technica, Ltd. can help you.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
Project Close Out CTC-470.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
I/3 Budget FY 2008 Department Request Training Nickie Whitaker Department of Management August 14, 2006.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
Construction Specifications
Version 1.0– June 18, Leveraging the Texas Project Delivery Framework and.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Server Virtualization: Navy Network Operations Centers
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Federal Force Account Utilizing Sponsor Resources Georgia Airports Association – Spring Workshop March 13, 2014 Presented By Katie Eleam Aviation Project.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Formats ACT 380.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
Capital Budget System (CBS) Agency Training 1. Introductions… Name Name Agency Agency Capital Budget System Role Capital Budget System Role Goals for.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Submitting a Quality Offer On the GSA Language Schedule GSA Federal Supply Service.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Division 1 – General Requirements ACT Objective O Learn to write Division 1 sections in a manner that governs but does not limit the content of.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Commissioning HVAC Systems: Lessons learned throughout
Construction Management At Risk Process
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
PROJECT DELIVERY METHODS
Controlling Project Cost and Schedule
Far Experimental Hall Hutches Civil Construction
Cost Containment Working Group Board Update
Directed Change Constructive Change
Presentation transcript:

Top 10 Ways to Expedite Design Reviews & Inspections

1)Submit complete drawings & specifications No missing drawings; complete details; specifications edited; all applicable spec sections provided Minimizes number of re-submittals required 2)Get the basics correct Appropriate Use, Construction Type, occupant loads Proper accessibility elements Proper fire assemblies, shafts, dampers 3)Assure documents are coordinated Between sheets Between disciplines Between packages

4)Consult with BCOM technical staff Use BCOM Lead Reviewer as primary point of contact Utilize BCOM staff’s broad Code & technical expertise 5)Use current forms & formats Current General Conditions (CO-7, 7CM, 7DB) Current Instructions to Bidders (CO-7a) Current Contracts (CO-9, 9CM, 9DB) Other current forms (See DGS on the DGS Forms Center) 6)Understand and adhere to CPSM requirements Technical requirements Procurement requirements Special requirements Take advantage of CPSM & VCCO training offerings

7)For applicable projects, follow the Pool Funding Process Understand the Pool Funding Process Assure scope and funding requests are consistent with, and meet the intent of, the Pool Funding Process Consult with BCOM Cost Reviewers as needed Submit required project cost documentation forms (e.g., CR-2, Building Cost Summary) in timely fashion 8)Assure changes during construction are properly approved and communicated Code impact Cost impact Schedule impact

9) Ready the project for substantial completion inspection Remove debris Provide correct exit signage & exit discharge Provide proper labeling of equipment, panels, & piping Pre-check systems before inspection (e.g., fans, GFCIs, locking devices, HVAC controls, etc.) Pre-check for proper installation of accessibility elements 10) Provide complete close-out documentation Certificates of Completion (A/E, Contractor) SFMO Inspection Report Checklist for Occupancy Structural & special Inspections Certification Potable Water Report Elevator Inspection Report

2012 Edition CPSM - Rev 1 ( DEB Notice ) Summary of Changes

2012 Edition CPSM - Rev 1 ( DEB Notice )

Recent CPSM Form Changes

Pool Funding Process

Pool Funding Process Spring 2013 Databases & Comps Cost Review Process Cost Overrun Process Trends

T I M E L I N E Need Established In PB Legislative Process Cost Review Pools Established Project Funding Authorized Preliminary Design Cost Review Schematic Design Cost Target Schematic Cost Review 6-PAC Acts to Fund Proj. Pool Funding Timeline Cost Target Det. Plng.

Pool Project Construction Cost Target A summary of the Virginia Building Construction Cost Database is located on BCOM’s web site and contains average construction costs (Equal to a Design Efficiency Rating of 3) for various building types. Project costs that differ significantly from the amounts in the database require justification for the variance in the Project Narrative. The intent of the Pool Process is to encourage the best balance between design and cost.

BCOM: Free Databases

1.Pool Projects utilize GC Pay; a web-based pay-application form processor. 2.GC Pay mirrors Form CO-12 Schedule of Values and Certificate for Payment. 3.Form CO-12 uses Uniformat II cost structure 4.Uniformat II is organized into systems rather than materials. 5.System costs from GC Pay are fed into the Virginia Building Construction Cost Database. Cost Data Collection

Substantiating Cost A.) $232 Average Cost For Building Type + B.) $50 For Unique Site Requirements = C.) $282 Justified Request Over Average

C-1 / S-1 Comps Table

Tradeline: Free Databases

Expanded Comp Query From BITS

Pool Project Submittal Requirements Pool Project Submittal Requirements: (For Capital projects, that are funded whole or in-part, by Pool funds) Phase A/E Cost Estimate * CR-2 Form DGS Cost Review Questionnaire * Drawings & Project Narrative * Independent Cost Estimate * VE Study or CM Value Analysis * Schematic Preliminary * As required by CPSM (2004: & 807.0, 2012: 5.6 & 5.7)

Pool Project Funding Process

CR-2 Questionnaire Detail Break-outs: (Typ.)

Uniformat Estimating Spreadsheet e1557-uniformat-ii-excel-elemental-estimating-spreadsheet-

RS Means’ Example of Uniformat II Cost-Structure

Form DGS (BCS) Example of Uniformat II Cost-Structure A – G are expanded in the form to allow for more detail.

Pool Project Cost-Overrun Process VE / Reduce Extent / Scope Project Over Budget Add Funds From: Agency Legislature Pool Balanced Budget

National Construction Trend: Building Construction Index (BCI) The BCI is a composite of skilled labor hours for various trades plus a fixed amount of common building materials spread over twenty cities. 2.27% Average Escalation Per Year For This 4 Year 4 Month Period

Pool Formation: $ BCOM Agency Market Pools Created From PB Reviews Competition in Virginia Remains High