1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.

Slides:



Advertisements
Similar presentations
DoD Logistics Human Capital Strategy (HCS) Executive Overview 1 October 2008.
Advertisements


Department of Defense Supply Chain Material Management Regulation DOD R 23 May 2003 Office of the Deputy Undersecretary of Defense for Logistics.
1 Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force OC-ALC/MAN.
TARGET AFFORDABILITY AND CONTROL COST GROWTH David G. Ahern Portfolio Systems Acquisition Office of the Assistant Secretary of Defense (Acquisition) April.
ARINC Overview Alliance Baltimore November 16, 2007.
Continuous Process Improvement (CPI) Program Update Colonel Ric Sherman, United States Army Office of the Assistant Deputy Under Secretary of Defense for.
Human Capital Strategic Planning for the DoD AT&L Workforce April 2004 Ms. Lisa Sper Federal Management Partners / (703)
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
Concepts for Managing DoD Materiel Reliability Dave Robertson.
Office of the Secretary of Defense Defense Microelectronics Activity (DMEA) Defense Microelectronics Activity (DMEA) Doug Casanova Defense Microelectronics.
Ms. Nancy Dolan CNO N Human Systems Integration in DoD Acquisition.
Summary of Revisions DoD Manual DoD Supply Chain Materiel Management Procedures 0.
Birthplace, Home & Future of Aerospace 2014 SECDEF Subsystem PBL of the Year – Sniper Precision Attack Pod 1 DISTRIBUTION STATEMENT A. Approved for public.
Office of the Assistant Deputy Under Secretary of Defense
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
ICBM Systems Directorate Minuteman III
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Randy Fowler | Assistant Deputy Under Secretary of Defense Materiel Readiness June 16, 2008 AIA.
OASD Logistics and Materiel Readiness
1 Basic PBL-Related Documents. 2 PBL Support Participants and Arrangements Warfighter Product Support Integrator Program Manager Performance Based Agreement.
1 Currently 27 DAU Logistics Continuous Learning Modules ModuleTitle CLL002DLA Support To The PM CLL004Life Cycle Logistics for the Rest of Us CLL006Depot.
CBM + Program Implementation
1 Pipeline Measurement Process Review Committee Kickoff Session Paul Blackwell Office of the Deputy Assistant Secretary of Defense for Supply Chain Integration.
Inter Agency Technical Interchange Meeting (IATIM) December 7, 2010 Anaheim, California.
DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Logistics Workforce Categories  Ms. Vicki L. Harris  DRC Contractor  Force Management and Organization Division  (A4RF)
LOG 235 Curriculum Review 8 Oct 2010 Curriculum Review LOG 235 Performance Based Logistics Presented to the Life Cycle Logistics (LCL) Functional Integrated.
Performance Based Logistics 20 Nov Current Life Cycle Challenges High Weapon System Sustainment Cost Inefficient End-to-End Supply.
LOG 101 Curriculum Review 16 Jul 04 Richard A. Andrews, CPL Course Manager.
1 Twelfth PEO/SYSCOM Commanders Conference The NAVSEA Perspective On Full Service Partnering Mr. John Goodhart Assistant Deputy Commander Fleet Logistics.
Performance-Based Logistics
Life Cycle Logistics.
DoD Logistics Human Capital Strategic Planning Overview June 26, 2007.
1 PMA-273 T45 Contractor Logistics Support April 2004.
1 NCMA HOT TOPICS Performance Based Logistics NCMA HOT TOPICS Performance Based Logistics Air Force Materiel Command Major Jim Valley HQ AFMC/A4KC 27 Jan.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Transforming the Way We Work Jill Garcia Defense Acquisition University 29 October 2004 Logistics Community of Practice Knowledge Sharing Initiatives Knowledge.
Strategic Vision Life Cycle Logistics Functional IPT Mrs. Sue Dryden DASD(Materiel Readiness) January 13, 2012.
Lessons Learned in PBL Implementation Mrs. Amie Bothwell 15 June 2004.
DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO.
Sustainment Solutions Envelope (SSE) Sustainment Solutions Envelope (SSE) Presented at the Defense Standardization Program Conference, 16 March 2004.
Total Life Cycle Systems Management 5 February 2002.
Capability Based Approach to Approach to Joint Warfighting Joint Warfighting Presented by: RDML Mark Harnitchek Vice Director, Joint Staff Logistics Directorate.
1 Logistics Continuous Learning (CLL) Module Status Review Presented by Tom Simcik, Acquisition Logistics Performance Learning Director 12 Sept 2008.
Parts Management Re-engineering and Warfighter Support International Society of Logistics May 17, 2005 Gregory E. Saunders Director, Defense Standardization.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
Naval Inventory Control Point 1  Work with all stakeholders early in the PBL formulation process to develop system support strategy  Develop SOW and.
Condition Based Maintenance Plus (CBM+) Overview
ARMY CAUCUS DSP Conference 23 May Army Caucus Recommendations Problem: The Army Standardization Program’s products and services are not recognized.
LOG 235 Performance Based Logistics On the Move: Fielding Expected June 03 Dr. Russell A. Vacante CDSC DAU Thursday 24 October /02 LOG 235.
The Product Support Manager (PSM): Achieving Life Cycle Management Success Rev. Nov 09 ’05 ’06 ’07 #1 ’02 ’06 ’04 ’06 ’07 ’09 ’03 ’04 “The Secretary of.
Environment, Safety, and Occupational Health Opportunities in DoD Business Transformation May 4, 2006.
LOG FIPT October 16, 2009 DoD Product Support Assessment Team (PSAT) Implementation.
ME Spring 2015 Systems Engineering, Part II Session March 2015 Mr. Larry Hopp, CPL.
Performance Based Logistics
Integration of DTM “Reliability Planning, Analysis, Tracking and Reporting” into LOG 103 and other DAU Life Cycle Logistics Learning Assets.
DoD Template for Application of TLCSM and PBL
T45 Contractor Logistics Support
Life Cycle Logistics.
Lessons Learned in PBL Implementation
Parts Management Plan Builder 26 July 07
Summary of Changes to the
Performance-Based Logistics
Product Support Considerations
Adjustments required for program or funding changes Options
Defense Logistics: Integrated and Efficient
Cleared for Public Release
Presentation transcript:

1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium

2  280 Ships ~ 30,000 Combat Vehicles  900 Strategic Missiles  14,000 Aircraft/Helicopters + ~ 300,000 Tactical Vehicles + Communications/Electronics Equipment + Support Equipment + Other Systems Maintained by: 659,000 DoD personnel Private sector companies Maintenance cost: ~ $91Billion (FY07) $85 Billion Inventory Why Life Cycle Management ? National Defense PP&E is valued at  $700 Billion Are we giving the warfighter …and taxpayer … best value?

3 BA Concept Refinement System Development & Demonstration Production & Deployment Systems Acquisition C FRP Decision Review LRIP/IOT&E Design Readiness Review Technology Development ( Program Initiation ) Concept Decision Pre-Systems Acquisition Operations & Support Sustainment 65-80% of the Life Cycle Cost Design For Sustainment Sustain The Design Life Cycle Management Continuum One Set of LCM Metrics Throughout the System Life Cycle

4 Single KPP: Materiel Availability Mandatory KSAs: Materiel Reliability Ownership Cost To achieve mission success, Combatant Commander needs: Requisite number of operational end items capable of performing the mission when needed Confidence that systems will perform the mission and return home safely without failure Ownership Cost provides balance; solutions cannot result in availability and reliability “at any cost.” New Metrics for Better Life Cycle Capability

5 JROC Warfighter Requirements Available Resources “RISK” Fund Reliability Today for Lower Life Cycle Cost $ Trade Availability/Reliability Desired Capability The Design/Build Life Cycle Challenge

6 Align Metrics, Resources and Outcomes Throughout Life Cycle CJCSI National Security Strategy Defense Planning Guidance Strategic Planning Guidance Materiel Availability Materiel Reliability Ownership Cost Mean Down Time B A Concept Refinement System Development & Demonstration Production & Deployment Systems Acquisition C FRP Decision Review LRIP/IOT&E Design Readiness Review Technology Development ( Program Initiation ) Concept Decision Pre-Systems Acquisition Operations & Support Sustainment Integrate Dollar Resources for LCSM Design For Sustainment Sustain the Design 65-80% of the Life Cycle Cost

7 Warfighter Requirements Available Resources “RISK” Fund Other Priorities $ Sustain at Designed Operational Availability ?? (95% / 85% / 80% / 75% / 70%) ?? Ops Tempo The Life Cycle Sustainment Challenge

8 Life Cycle Management Enablers Materiel Availability Materiel Reliability Ownership Cost Mean Down Time PERFORMANCE BASED LOGISTICS Corrosion Prevention; IUID/SIM; Technical Data/IETM; CBM + (Prognostics & Diagnostics, RCM); RFID; Continuous Process Improvement (CPI); Title 10 Requirements (50/50, Partnering); Depot Maintenance; DMSMS/Obsolesence; Training; Integrated Supply Chain Management (SCM); Predictive Modeling; Long Term Performance Based Agreements “Enablers”

9 Performance-Based Logistics: Enabling Life Cycle Sustainment Product Support Integrator Warfighter/Force Provider Weapon System Manager Visibility into cost/risk decisions across life cycle AcquisitionSustainment Disposal Provide Continuous, Reliable, Affordable Support per PBA Agreement Ensure System is Sustained at Optimum Level per PBA Agreement INDUSTRY/ORGANIC Buys Performance As a Package PM

10 Spectrum of Support Opportunities Contractor Support CONTRACTOR ORGANIC More OrganicMore Commercial Traditional Organic Support Environment Contractor Responsible For Majority of Support Public/Private Partnering Opportunities MIX Organic Support Few DoD support workloads are “All” organic or “All” contract – it’s a MIX PBL support strategies are no different – only the basis of the agreement The challenge in developing your strategy is to find that right “mix” based on Business Case Analysis (BCA) PBL is NOT Outsourcing!! Government Responsibility Government Risk Contractor Responsibility Government Risk

11 Warfighter Requirements Available Funding “RISK” Flexibility $ Specified Operational Availability (Organic / Contract / Partnership) O p s Tempo The PBL Challenge

12 The Way Ahead?

13 Life Cycle Management Way Ahead Establish Outcomes: Materiel Availability Materiel Reliability Ownership Cost Mean Down Time Expand APB to LCPB Expand AS to LCS Include in Policy (e.g., DoD 5000, 4151, & CJCSI 3170) Note: APB=Acquisition Program Baseline LCPB=Life Cycle Program Baseline AS=Acquisition Strategy LCS=Life Cycle Strategy FMR=Financial Management Regulation Define Outcome Metrics/ Goals Align Resources to Outcomes Track Outcome Performance (Governance) Establish Pilot Program to Align Resources to Readiness Create/Use Predictive Modeling Tools Update FMR Assess Attainment of Outcomes:  DAES Reviews  DAMIR Reporting  OIPTs  DABs Address Major Changes in Outcome Metrics (15%/25%) Update LCPB Every 5 Years Concept Acquisition Sustainment Retirement

14 We Need Your Help! What are Your Answers??

15 BACK-UPS

16 PBL Example T-700 Engine Variant Engine Repair ACAT N/A Fleet Density 438 Repaired YTD Fielded 1978 Fielding Schedule N/A Support Strategy Partnership Key Characteristics PSI Organic: CCAD (AMCOM) PSP(s) CCAD General Electric Metrics 1. Reduce Repair Turnaround Time (RTAT) 2. Increase Time on Wing RTAT Reduced 69% (from 261 to 76 days) Time On Wing Increased 260% (from 512 to 825 Hours) Shaft Horsepower improved 51% Time-Test-cell yield increased from 40% to 90% GE-CCAD Partnership

17 PBL Example Common Ground Station (CGS) Variant AN/TSQ-179A(V)2 ACAT III Fleet Density 102 Fielded 2001 Fielding Schedule Completed Support Strategy Organic Supply & Maintenance Key Characteristics Cost Avoidance of $1.8 Million/Year PSI Organic: TYAD PSP(s) CECOM DLA General Dynamics Metrics 1. Operational Availability (Ao) 2. Ownership costs Performance Rqmt = 75% Ao Since implementing PBL, the Ao Rate exceeds 96% AMC-DLA PBA AMC’s Tobyhanna Depot is the PSI