- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December 2011- D. Orecchini – P.

Slides:



Advertisements
Similar presentations
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Advertisements

CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
2035 Series. Common Components The design of the 2035 Series valve includes many proven components for assured reliability. These items include: –Same.
TP4-ENERSOL-TD/PV double function
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
AIDA Infrastructure for very forward calorimeters Design proposal Mechanical support structure Designers:In collaboration with: Eric DavidFrancois-Xavier.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
TRT Leak Repair Anatoli Romaniouk, EC leak tests Side C Side A 2.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Concept Design for LBNF Far detector (LAr single phase)
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
CAD CAM. 2 and 3 Dimensional CAD: Using 2-dimensional CAD software, designers can create accurate, scaled drawings of parts and assemblies for designs.
XXXIX PANDA COLLABORATION MEETING GSI-DECEMBER 2011 B. GIRAUDO / D. ORECCHINI CENTRAL SUPPORT FRAME STRUCTURAL ANALYSIS FIRST APPROACH AND PRELIMINARY.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
PANDA Target Pipe Meeting Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Target Pipe Meeting February 2013.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
DESIGN STUDY November 28 th - 30 th 2005First EURISOL Design Study TOWN MEETING High Power RF Amplifiers Development at LNL Fabio Scarpa - INFN LNL.
1)– CENTRAL TRACKER INTEGRATED ITEMS: > Central Tracker, “Assembly & Insertion Auxiliary Structure”. > “CSF”- Central Tracker Support Frame (In collaboration.
- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -
EC: 7 DISK concept Preliminary considerations
STT gas system a possible implementation
The design of a photodetector unit of a new Shashlyk EM
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
“CENTRAL SUPPORT FRAME” -
We started last December: 32 channels prototype “Julich like” to:
STRAW TRACKER SYSTEM CAD STATUS :
MECHANICAL FRAME OF THE MVD
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
new straw end plug: D=10.6 mm straws support frame Levan option
Hcal Geometry and Assembly
Status and Progress of NSW HUB and Extension
Enrique Calvo Alamillo DAEGU
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Status of the Mechanics at Ciemat.
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
Mini-drawers, FE-ASIC , Integrator
Some proposals on HV circuits realization for segmented straw detector
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
SIT AND FTD DESIGN FOR ILD
Integration and IR Hall
CAD CAM.
Presentation transcript:

- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P. Gianotti

INFN-LNF - SPAS -STRAW MODULES INTEGRATION- - “STRAW DOUBLE-LAYER” INTEGRATION SOLUTION - - “STRAW MODULE”. - BACKWARD”SUPPORT END-PLATE ”. - “ELECTRONIC CARD” - “STRAW MODULE” SUPPORT EQUIPMENT. - FRONT PICTORIAL VIEW- - HIGH VOLTAGE DISTRIBUTION CARD. INFN-LNF-SPAS- December D. Orecchini – P. Gianotti

INFN-LNF - SPAS -STRAW MODULES INTEGRATION- - “STRAW DOUBLE-LAYER” INTEGRATION SOLUTION - - “STRAW MODULE”. - BACKWARD”SUPPORT END-PLATE ”. - “ELECTRONIC CARD” - “STRAW MODULE” SUPPORT EQUIPMENT. - REAR PICTORIAL VIEW - - HIGH VOLTAGE DISTRIBUTION CARD. INFN-LNF-SPAS- December D. Orecchini – P. Gianotti

INFN-LNF - SPAS -STRAW MODULES INTEGRATION- -“STRAW DOUBLE-LAYER” INTEGRATION SOLUTION - - FRONT VIEW - - TOP VIEW THE SHOWN DIMENSION S ARE THOSE CHOSEN FOR THE PROTOTYPE. - OBIOUSLY THEY COULD BE CHANGED IF THE ELECTRONICS REQUIRE MORE OR DIFFERENT SPACE. - HIGH VOLTAGE DISTRIBUTION CARD. - “ELECTRONIC CARD” INFN-LNF-SPAS- December D. Orecchini – P. Gianotti

INFN-LNF - SPAS -STRAW MODULES INTEGRATION- - STEP_1, ASSEMBLING OF: STRAW MODULE – 1° PART OF “SUPPORT EQUIPMENT”. - “STRAW MODULE”. - CONNECTION PARTS OF THE “SUPPORT EQUIPMENT”. - PRE–ASSEMBLED - - ASSEMBLED - - HIGH VOLTAGE DISTRIBUTION CARD. - STRAW FRAME. INFN-LNF-SPAS- December D. Orecchini – P. Gianotti

INFN-LNF - SPAS -STRAW MODULES INTEGRATION- - 1° PART “SUPPORT EQUIPMENT” : HOW IS IT DONE ? - “LEFT” AND “RIGHT” CONNECTION PARTS. -OBTAINED BY INJECTION MOLDING. -MATERIAL: ABS OR SIMILAR. - PLASTIC MINI-SCREW 2mm DIAMETER. - STRAW FRAME. -ASSEMBLING DETAIL. - NOTE: ELEMENTS OF COUPLING ARE: -1) EMBOSSED ELEMENTS MADE ON THE “SUPPORT PARTS”; -2) MILLING POCKETS MADE ON THE “STRAW- FRAME”. - COUPLING BETWEEN THEM ENSURE THE CORRECT GEOMETRIC INTERFACE.

INFN-LNF - SPAS -STRAW MODULES INTEGRATION- - STEP_1: ASSEMBLING STRAW MODULE – 1° PART OF “SUPPORT EQUIPMENT” -THE SHOWN SOLUTION IS BASED ON A “JULICH IDEA” (SEE THE PHOTO) DEVELOPED TO FIND AN OVERALL INTEGRATION. - STRAW FRAME. - CONECTION PARTS OF THE “SUPPORT EQUIPMENT”. - PLASTIC MINI-SCREW 2mm DIAMETER. INFN-LNF-SPAS- December D. Orecchini – P. Gianotti

INFN-LNF - SPAS -STRAW MODULES INTEGRATION- - STEP_2: ASSEMBLING “GAS MANIFOLD “ - 2° PART OF “SUPPORT EQUIPMENT” - - “UP” AND “DOWN” GAS PIPES -MATERIAL: STEEL, 4mm DIAMETER. - AGAIN, THE SHOWN SOLUTION IS BASED ON A “JULICH IDEA” (SEE THE PHOTO) DEVELOPED TO FIND AN OVERALL INTEGRATION. -FIXING PART OF “GAS PIPES”. INFN-LNF-SPAS- December D. Orecchini – P. Gianotti

INFN-LNF - SPAS -STRAW MODULES INTEGRATION- -“UP” AND “DOWN” GAS PIPE, ARE CONNECTED WITH THE SINGLE STRAW TUBE. -THE “UP-PIPE” IS CONNECTED WITH THE ”DOWN-PIPE”. - STEP_3°: “CONNECTION OF GAS SYSTEM -THE ASSEMBLED “STRAW MODULE” IS READY TO BE MOUNTED IN THE “SUPPORT STRCTURE”. INFN-LNF-SPAS- December D. Orecchini – P. Gianotti

INFN-LNF - SPAS -STRAW MODULES INTEGRATION- - FINAL STEP: INTEGRATION “STRAW MODULE” – SUPPORT STRUCTURE - -“STRAW MODULE” INSERTION IN THE “SUPPORT STRUCTURE”.-“STRAW MODULE” FIXED ON THE “SUPPORT STRUCTURE”. -“ELECTRONIC CARD” POSITIONED ON THE “SUPPORT STRUCTURE”. -“ELECTRONIC CARD” FIXED ON THE “SUPPORT STRUCTURE”. INFN-LNF-SPAS- December D. Orecchini – P. Gianotti

INFN-LNF - SPAS -STRAW MODULES INTEGRATION- - SKEWED ANGLE: 2.89° - TYPICAL “SKEWED STRAW DOUBLE-LAYER” INTEGRATION SOLUTION - - PICTORIAL VIEW- -THE TWO CONNECTION PARTS OF THE “SUPPORT EQUIPMENT” MUST BE REALIZED WITH DIFFERENT LENGTHS, AND WITH THE INTERFACE SIDE WITH THE “STRAWS FRAME” WITH A “SKEWED ANGLE”. INFN-LNF-SPAS- December D. Orecchini – P. Gianotti L1 L2

INFN-LNF - SPAS -STRAW MODULES INTEGRATION- - STEREOLITHOGRAPHY PROTOTYPE ASSEMBLED ON THE “SUPPORT STRUCTURE PROTOTYTPE”. INFN-LNF-SPAS- December D. Orecchini – P. Gianotti

- CONCLUSIONS - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P. Gianotti -THE SHOWED “ASSEMBLING PROCEDURE” CAN BE ADOPTED ALSO ON THE FORWARD SIDE OF THE “SUPPORT STRUCTURE”. THE ONLY DIFFERENCE IS THAT, THE “UP” AND “DOWN” GAS MANIFOLD WILL BE CONNECTEND WITH THE MAIN “IN” AND “OUT” GAS PIPES. -THE SHOWED “ASSEMBLING PROCEDURE”, WITH SOME MODIFICATIONS, CAN BE ADOPTED ALSO WITH A “QUAD STRAW MODULE” SOLUTION. -THIS SOLUTION REDUCES AT MINIMUM THE NUMBER OF DIFFERENT OBJECTS THAT WILL BE REALIZED WITH INJECTION MOLDING. WE WILL HAVE 2 SERIES OF SUPPORTS : A “RIGHT SERIES”, AND A “LEFT SERIES”. - FOR THE SUPPORTS OF THE SKEWED MODULES THIS KIND OF OPTIMIZATION, PROBABLY, WILL NOT BE POSSIBLE. - IN CASE OF ADOPTION OF THE PROPOSED SOLUTIONS, ITS NECESSARY TO DEVELOP A DISCUSSION ABOUT DETAILS (DIMENSIONS, GAS-PIPES, CONNECTORS, ETC….) WITH “STRAWS - PEOPLE” AND WITH THE “ELECTRONICS DEVELOPERS”.

CENTRAL SUPPORT FRAME NEW GEOMETRY AFTER THE LAST FEM ANALYSIS (presented in this meeting, in the mechanical session) THE “CSF” HAS BEEN CHANGED: - THE DIMENSIONS AND THE EXTERNAL GEOMETRY ARE STILL THE SAME; - ALL THE INTERNAL “LIGTHNING WINDOWS” HAVE BEEN CLOSED. - CENTRAL SUPPORT FRAME STRUCTURAL ANALYSIS - GSI-DECEMBER 2011: B. GIRAUDO / D. 0RECCHINI CENTRAL SUPPORT FRAME OLD GEOMETRY - JUST TO REMEMBER ………..-