High Speed Two Ltd responsible for developing and promoting the UK’s new high speed rail network Safe Sustainable Integrated Reliable
HS2: a strategic transformation Phase One Stations: Euston Old Oak Common Birmingham Interchange Birmingham Curzon Street Phase Two Stations: East Midlands Hub Sheffield Leeds Manchester Piccadilly Manchester Airport
Timeline
Phase One key construction statistics 230km ROUTE LENGTH 46km TUNNELS 74km CUTTINGS 128 mt EXCAVATED MATERIAL (90% TO BE RE USED) 145 STRUCTURES OVER BRIDGES 152 STRUCTURES UNDER BRIDGES 31 MAIN COMPOUNDS FOR CONSTRUCTION 299 SATELLITE COMPOUNDS
Phase One Carbon Footprint (2016)
HS2 Sustainability Policy “Minimise the carbon footprint of HS2 as far as practicable and deliver low carbon long distance journeys.” HS2 Sustainability Policy
Integrating carbon into project delivery LEADERSHIP AND GOVERNANCE CULTURE AND COMMUNICATION INNOVATION AND STANDARDS PROCUREMENT
Leadership Phase One construction carbon footprint by source (2015)
Infrastructure Carbon Review
HS2 Carbon Minimisation Hierarchy Most favourable option AVOID REDUCE LOW CARBON ENERGY SEQUESTER Least favourable option
SUPPLY CHAIN ENGAGEMENT Communication PUBLIC REPORTING SUPPLY CHAIN ENGAGEMENT INDUSTRY NETWORKS INNOVATION PROGRAMME
Innovation and standards PAS 2080 BREEAM Infrastructure Low carbon concrete Off-site manufacture
What do we want from the supply chain?
Thank you HS2 Supply Chain Team: SCC@HS2. org. uk www. gov Thank you HS2 Supply Chain Team: SCC@HS2.org.uk www.gov.uk/government/publications/hs2-supplier-guide