3 Old Dominion University Lake Gaston Project Field Trip November 1, 2014 Thomas M. Leahy, P.E. Director of Public Utilities.

Slides:



Advertisements
Similar presentations
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Advertisements

Managing Development in the Coastal Zone: Federal Policy Session Name: Managing Development in the Coastal Zone: Federal Policy Coastal Hazards Management.
THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
Water Quality Trading Claire Schary Water Quality Trading Coordinator U.S. Environmental Protection Agency, Region 10, Seattle, WA Region 10, Seattle,
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
Desalination & Clean Water Technology Industry-Government Forum August 23, 2012 Roger Bailey Public Utilities Director.
LNG USA 2005 IQPC Houston, Texas November 9, 2005 Bruce F. Kiely Baker Botts L.L.P. Washington, D.C.
Deborah M. Smith United States Magistrate Judge District of Alaska LAWS AND LAW ENFORCEMENT RELATED TO FRESHWATER ECOSYSTEMS Second Asian Judges Symposium.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
North Texas Municipal Water District’s Proposed Lower Bois d’Arc Creek Reservoir Presented by: Jim Parks.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
“Insert” then choose “Picture” – select your picture. Right click your picture and “Send to back”. The world’s leading sustainability consultancy Legislation.
Water Allocation and Protection of the Environment: Is a Collaborative Approach Possible? William E. Cox Professor of Civil Engineering Virginia Tech.
Presented by: Kevin J. Spencer, P.G. R.W. Harden and Associates, Inc. Benefits and Challenges of Developing Brackish Groundwater Supplies WATER Supply.
Compensatory Mitigation in Coastal Louisiana Keith Lovell, Administrator Office of Coastal Management Department of Natural Resources 10/03/121.
The NC Water Allocation Study : a report for city and county attorneys.
Presented by Ralf Topper, CPG 30 th Colorado Water Workshop July 28, 2005.
MassDOT P3 Project Overview. MassDOT Project Mobility.
Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Lay-out of Proposed Scheme. Positives – Well located for integration into both NMBM Potable and Industrial supply infrastructure Can supplement either.
February 26, 2003 Presentation in Clarksville, Virginia to the Bi-State Commission Overview of and Interlink of John H. Kerr, Philpott, and Private Hydropower.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
San Diego County Water Issues 2010 Update Maritime Business and Technology Summit November 16, 2010 Seawater Desalination for San Diego.
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Fish and Wildlife : Regulatory Framework and Challenges Cherise M. Oram STOEL RIVES LLP Hydrovision 2008 Ocean/Tidal/Stream Power Track 7D “Environmental.
Interdistrict Transfers of Water and Local Sources First Land Resources and Regulatory Committee November 3, 2005 Land Resources and Regulatory Committee.
Environmental Decision Making SC.912.L Why have environmental laws?  To regulate activities that are harmful to the environment. a. E.g., Clean.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
Seacoast Utility Authority Water Use Permit Steven Memberg, Section Leader Water Use Regulation Division, Water Supply Department January 26, 2009.
Texas Innovation Water 2010 Seawater Desalination What is the benefit to the State from implementing the Brownsville Seawater Demonstration Project?
June 10, 2008 Board of County Commissioners B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Transmittal Hearing.
By: Amanda, Rakkir, Rebecca, and Franklin. Executive order U.S army Corps Engineers Environmental Protection Agency (EPA) Section 401 of the Clean.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
PROJECT PLAN: The Nature Conservancy Corps of Engineers ICPRB Presentation Potomac Watershed Roundtable January 9, 2009.
Water Supply Orange County Presented by Kirby B. Green Executive Director St. Johns River Water Management District January 27, 2009.
High Altitude View of ACF Regional Water Plans.
National Environmental Policy Act Environmental Engineer US Army Garrison.
Date: November 12, 2014 Presented by CAW at the California Coastal Commission hearing T E S T S L A N T W E L L P R O J E C T.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
Tom Reeder Division of Water Resources.  SGWASA = South Granville Water & Sewer Auth.  Provides water & sewer service to south Granville County, Stem,
Climate Change Threat Sea-Level Rise 1. Potential Impacts from Sea-Level Rise How might our community be impacted by sea-level rise? 2.
Date: December 17, 2014 Presented by CAW at the California State Lands Commission hearing T E S T S L A N T W E L L P R O J E C T.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
The Future of Sustainable Water Initiatives in North Carolina PENC Engineering Leadership Conference Tuesday, December 2, 2013 Donald L. Safrit, P.E.,
Thursday, October 8, Kevin D. Johnson Stoel Rives LLP Thursday, October 8, 2015 Environmental and Regulatory.
Assemblymember Adrin Nazarian
PLANNED POTABLE REUSE: URBAN WATER INSTITUTE’S SPRING WATER CONFERENCE
Ten Reasons to Use South Carolina’s Surface Water Quantity Models
Department of Environmental Quality
Using Models to Explore Options for Middle Oconee River Management
Michigan Dept. of Environmental Quality Water Resources Division
WATER POLICY And Management in AlabamA
National Environmental Policy Act of 1969 (NEPA)
North Carolina Division of Water Resources
CP-TXT Water Supply Facilities Work Plan Amendment
Water Law and Management
Carlsbad and Huntington Beach Seawater Desalination Facilities
How the GWRS Overcame the “Yuck” Factor
Presentation transcript:

3 Old Dominion University Lake Gaston Project Field Trip November 1, 2014 Thomas M. Leahy, P.E. Director of Public Utilities

North Carolina & Virginia Discharge 15 inches/yr Discharge 15 inches/yr No structural water shortages except in the coastal plain No structural water shortages except in the coastal plain In the coastal plain, topography and wetlands preclude new reservoirs In the coastal plain, topography and wetlands preclude new reservoirs Coastal plain aquifers are over-stressed Coastal plain aquifers are over-stressed SE Virginia is a major metropolitan region in the coastal plain – much of water is interbasin transfer SE Virginia is a major metropolitan region in the coastal plain – much of water is interbasin transfer

The City of Virginia Beach, VA Virginia Beach is the largest City in the state, but it had no water supply Virginia Beach is the largest City in the state, but it had no water supply Dependent upon Norfolk for surplus supply Dependent upon Norfolk for surplus supply Surplus was in adequate since 1976 Surplus was in adequate since 1976 The City restricted water often, including five consecutive years: The City restricted water often, including five consecutive years: In 1982, Virginia Beach decided to pursue the Lake Gaston Water Transfer In 1982, Virginia Beach decided to pursue the Lake Gaston Water Transfer

The Lake Gaston Water Transfer 60 MGD from the Roanoke River Basin

The Lake Gaston Water Transfer 76 mile, 60-inch Diameter Pipeline

The Lake Gaston Water Transfer: Roanoke River Basin to Virginia Beach Average flow in Roanoke River – 8,000 cfs Average flow in Roanoke River – 8,000 cfs Lowest monthly and yearly flow (regulated by upstream dams)– 2,000 cfs Lowest monthly and yearly flow (regulated by upstream dams)– 2,000 cfs 60 mgd (93 cfs) is 4.7% of drought flows 60 mgd (93 cfs) is 4.7% of drought flows Transfer does not reduce minimum daily flows which are regulated by mandated releases from downstream dams Transfer does not reduce minimum daily flows which are regulated by mandated releases from downstream dams Transfer does increase the duration of low flows during drought periods Transfer does increase the duration of low flows during drought periods

Permits for Water Projects Federal Permits Federal Permits Corps of Engineers: Rivers and Harbors Act and Clean Water Act Corps of Engineers: Rivers and Harbors Act and Clean Water Act Federal Energy Regulatory Commission Federal Energy Regulatory Commission Coastal Zone Management Act (NOAA) Coastal Zone Management Act (NOAA) State Permits State Permits DEQ: Clean Water Act 401 Certification DEQ: Clean Water Act 401 Certification DEQ: VA Water Protection Permit (instream flow) DEQ: VA Water Protection Permit (instream flow) DEQ: NPDES/VPDES DEQ: NPDES/VPDES Local Permits (Zoning, CUP, Local Consent) Local Permits (Zoning, CUP, Local Consent)

National Environmental Policy Act - NEPA Any agency with approval jurisdiction must conduct public interest/environmental review Any agency with approval jurisdiction must conduct public interest/environmental review If the Environmental Assessment (EA) results in a FONSI – then approval may issue If the Environmental Assessment (EA) results in a FONSI – then approval may issue If the project might harm the human or natural environment, a more detailed Environmental Impact Statement (EIS) including an analysis of need and alternatives will be prepared If the project might harm the human or natural environment, a more detailed Environmental Impact Statement (EIS) including an analysis of need and alternatives will be prepared If the EIS concludes that the project is not needed, there is a better alternative, or has unacceptable impacts, the agency can reject or modify the applicant’s proposal If the EIS concludes that the project is not needed, there is a better alternative, or has unacceptable impacts, the agency can reject or modify the applicant’s proposal

VA Beach Evaluation of Alternatives New reservoirs: Would not pass the environmental reviews – wetlands, irreversible habitat losses, etc New reservoirs: Would not pass the environmental reviews – wetlands, irreversible habitat losses, etc Particularly in the Coastal Plain Particularly in the Coastal Plain Regional Groundwater Aquifer: could not provide sufficient quantities long-term Regional Groundwater Aquifer: could not provide sufficient quantities long-term Seawater Desalting: Too expensive (at that time) Seawater Desalting: Too expensive (at that time) Wastewater Reuse: Not feasible (at that time) Wastewater Reuse: Not feasible (at that time) Alternatives to the Gaston pipeline were the subject of extensive regulatory and legal debate Alternatives to the Gaston pipeline were the subject of extensive regulatory and legal debate History supports regulatory decisions at that time, but if project were attempted today, desalting and/or potable reuse would be more viable History supports regulatory decisions at that time, but if project were attempted today, desalting and/or potable reuse would be more viable

Lake Gaston Project Permits and Environmental Studies Corps of Engineers, FERC, NOAA Corps of Engineers, FERC, NOAA 1983 – 1995: Three EA’s, two EIS’, one CZMA Review (similar to EIS) 1983 – 1995: Three EA’s, two EIS’, one CZMA Review (similar to EIS) Three District Court rulings, two Appellate Court rulings, two refusals by Supreme Court to grant an appeal Three District Court rulings, two Appellate Court rulings, two refusals by Supreme Court to grant an appeal Every study and every ruling upheld the need for the project and that the project was the best overall alternative – but took 15 years Every study and every ruling upheld the need for the project and that the project was the best overall alternative – but took 15 years

Cost of Lake Gaston Water Transfer vs Desalination SourceDate LG Water Transfer Seawater Desalination Desal/LG Ratio US Army Corps of Engineers 1984$1.26/kgal$3.90/kgal3.1 Virginia Beach 1986$1.16/kgal$3.83/kgal3.2 Federal Regulatory Energy Commission 1995 $1.153 B 50-yr NPV 50-yr NPV $3.673 B 50-yr NPV 50-yr NPV3.2 Virginia Beach 1998$2.79/kgal$5.69/kgal2.0 Virginia Beach Consultant 2004 $307 M 25-yr NPV $632 M 25-yr NPV 2.1

But the times, they are a’changing Gaston Water: $ $3:00/1000 gallons Gaston Water: $ $3:00/1000 gallons Seawater Desalination Seawater Desalination Carlsbad/San Diego: 50 mgd, $6.00/1000 gallons Carlsbad/San Diego: 50 mgd, $6.00/1000 gallons Huntington Beach: 50 mgd, $4.40/1000 gallons Huntington Beach: 50 mgd, $4.40/1000 gallons Tel Aviv, Israel: 165 mgd, $2.00/1000 gallons Tel Aviv, Israel: 165 mgd, $2.00/1000 gallons Potable Wastewater Reuse - OCWD Potable Wastewater Reuse - OCWD Microfiltration, Reverse Osmosis, UV/H Microfiltration, Reverse Osmosis, UV/H Direct injection into water supply aquifers (30% of total recharge to the aquifer) Direct injection into water supply aquifers (30% of total recharge to the aquifer) 70 mgd, $2.61/1000 gallons 70 mgd, $2.61/1000 gallons

VA Coastal Plain Aquifer Cross-Section McFarland & Bruce, 2006

About 60% of Sea Level Rise May Be Due to Land Subsidence

Groundwater Withdrawals From Deep Aquifers May Be Causing Most (or all) of Land Subsidence

Largest Groundwater Permits

QUESTIONS?