METODOLOGI SIX SIGMA PERTEMUAN 11 ANALYZE PHASE OLEH: EMELIA SARI.

Slides:



Advertisements
Similar presentations
Demystifying 6.
Advertisements

Business Process Management and Modeling. Two Key Aspects Tools for Today: Utilize effective methods to gather information and model workflows Tools for.
March 14, 2012 Lynne Hall.  Best Practice Committee looks at all Core Measure Data ◦ HF-1 Discharge Instructions is one of the lowest measure in Georgia.
Lean Six Sigma Project Presentation Template
CI Basics Super Sponsor DMAIC The Value Stream 6σ6σ.
METODOLOGI SIX SIGMA PERTEMUAN 9 ( Perhitungan Statistik) OLEH: EMELIA SARI.
METODOLOGI SIX SIGMA PERTEMUAN 5 MEASURE PHASE OLEH: EMELIA SARI.
Certified Business Process Professional (CBPP®)
Data Collection Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
IE673Session 5 - Process Management1 Process Management.
Presented By The University of Texas-School of Public Health
Project Storyboard Template
Chapter 10 Quality Improvement.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
1 An Introduction to Lean and Six Sigma for AHQ by ASQ Kelly Roggenkamp April 22, 2010.
SOFTWARE PROJECT MANAGEMENT Project Quality Management Dr. Ahmet TÜMAY, PMP.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
Overview of Lean Six Sigma
Overview of DMAIC A Systematic Framework for Problem Solving
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Managing Project Quality
What is Business Analysis Planning & Monitoring?
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
METODOLOGI SIX SIGMA PERTEMUAN 12 IMPROVE PHASE OLEH: EMELIA SARI.
SIX SIGMA-  PROCESS IMPROVEMENT TECHNIQUE. Business Goal :- To ultimately transform all transactions into monetary gains through customer's satisfaction.
Tools for Process Improvement
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
Value Analysis/ Flow Analysis
Software Inspections. Defect Removal Efficiency The number of defects found prior to releasing a product divided by The number of defects found prior.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Welcome to Lean Six Sigma Green Belt Training
Nyttige implementeringsværktøjer Praktiske eksempler fra Lean Six Sigma Bo Maach-Møller.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Continuous Improvement Story Cover Page The cover page is the title page Rapid Process Improvement Story Template O Graphics are optional This CI Story.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Process Characteristics
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
DMAIC 1. (Define, Measure, Analyze, Improve and Control) is a process for continual improvement. It is a systematic and fact based approach to plan, sequence.
Project Quality Management.  Define project quality management.  Describe quality planning and its relationship to project scope management.  Discuss.
Chapter 11 TQM & Quality Tools. Management 3620Chapter 11 TQM and Quality Tools11-2 Total Quality Management A philosophy that involves everyone in an.
OM7a -1TQM and Quality Tools Chapter 11 TQM & Quality Tools.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 12 Multiple.
Chapter 16 Managing costs and quality
Traditional Economic Model of Quality of Conformance
METODOLOGI SIX SIGMA PERTEMUAN 13 CONTROL PHASE
Green Belt – SIX SIGMA OPERATIONAL Intro to Analyze Phase.
CSE SW Metrics and Quality Engineering Copyright © , Dennis J. Frailey, All Rights Reserved CSE8314M11 8/20/2001Slide 1 SMU CSE 8314 /
Copyright , Dennis J. Frailey CSE Software Measurement and Quality Engineering CSE8314 M00 - Version 7.09 SMU CSE 8314 Software Measurement.
CSE SW Measurement and Quality Engineering Copyright © , Dennis J. Frailey, All Rights Reserved CSE8314M11 version 5.09Slide 1 SMU CSE.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
Overview Definition Measurements of process capability control
Lean Six Sigma Road Map Improvement Process Road Map
LEAN SIX SIGMA PROJECT TEMPLATE
Quality Certification
OPS/571 Operations Management
Quality Management Six Sigma
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
The 7 Basic Quality Tools ~ The DMAIC Process
Chapter 10 Quality Improvement.
Correlation A measure of the strength of the linear association between two numerical variables.
Measure Phase Wrap Up and Action Items
QMS, ISO and Six Sigma It’s all related…..
Presentation transcript:

METODOLOGI SIX SIGMA PERTEMUAN 11 ANALYZE PHASE OLEH: EMELIA SARI

Overview During the Measure Phase, the Six Sigma team collects significant amounts of data in order to measure the current performance of the process and identify the process critical X’s and Y’s. The objective of the Analyze Phase is to confirm the hypotheses, or educated guesses, made during the Measure Phase as to the root causes of the problems. Only after the team has moved beyond symptoms of the problem to the true root cause can they develop effective solutions in the Improve Phase

The Analyze Phase involves statistical analysis of collected data A statistical approach to decision making involves moving from data to information to knowledge Through the measure and analyze tools, data become information with which hypotheses can be made. Information becomes knowledge when it is successfully used to make decisions and the lessons learned from the process are completed

Statistical tools move us from data to knowledge by helping us make decisions under uncertainty. Decision making must be based on objective facts and knowledge and statistics is the science that brings clarity to what is otherwise meaningless data

Statistical Approach to Decision Making

The team should exit the Analyze Phase with a clear understanding of the root causes of the problems that prevent the process from meeting the customer CTQs identified in the Define and Measure Phases.

PROCESS ANALYSIS

Analyzing the process maps developed in the Measure Phase is one of the first steps in the Analyze Phase. This involves identifying – Value added vs. non-value-added activities – Direct customer contact steps – Sources of process delays – The impact of policies on process performance

Value Added vs. Non Value Added Activities The goal in value-added analysis is to identify the value-added steps vs. the non value-added steps and eliminate as many non-value-added steps as feasible. An activity is adding value if it meets the following three criteria: – The customer is willing to pay for it – Inputs are transformed into outputs – It is done right the first time (no rework)

Direct customer contact steps

Process Delays After the value-added analysis is completed and the customer contact points identified, the total work time of the process compared to the total process cycle time needs to be determined. Work time is defined as the amount of time that something is actually being done to the process step, whether value added or nonvalue added.

Process Delays (2) The cycle time is measured from the beginning of the process, usually the customer request, to the completion point, which is usually when the customer request is fulfilled. The difference between work time and cycle time is the delay time Only 10 to 20% of the total cycle time is work time — the other 80 to 90% is idle time

Sources of Delays and, Thus, Potential Areas for Improvement May Include the following: Approvals, especially multiple levels of approvals. Any hand-off situation, because hand-offs create queues and queues mean delays. Bottlenecks, because bottlenecks create queues. Defects, because defects create rework, which adds time to the process, thus delaying completion.

Sources of Delays and, Thus, Potential Areas for Improvement May Include the following: (2) Inspections or appraisal activities. Unclear operational definitions. Unambiguous instructions through operational definitions are needed to ensure that everyone involved in the process has the same interpretation of the work to be accomplished. Unclear accountability for the work. If everyone is responsible, no one is responsible.

The impact of policies on process performance

Choosing an Appropriate Statistical Test.

Tools for Analyzing Relationships Among Variables Scatter plots Correlation coefficient (r) Coefficient of determination (r2) Regression analysis.

Examples of Scatter Plots Indicating Direction and Strength of the Relationship Between Y and X.

Summary The Six Sigma team should exit the Analyze Phase with a clear understanding of the root causes of the problems associated with transforming the critical X’s into critical Y’s. Identification of the critical X’s starts in the Measure Phase through various measure tools and techniques. The Improve Phase focuses on improving the critical X inputs and the processes that transform the inputs into outputs. Summarizing the measurement and analysis findings at the end of the Analyze Phase will also provide the team with clearer direction on precisely what root cause problems need to be solved in the Improve Phase.

Terima Kasih