Chapter 23 Flexible Budgets and Standard Cost Systems Demonstration Problems © 2016 Pearson Education, Inc.23-1.

Slides:



Advertisements
Similar presentations
Using Budgets for Planning and Coordination
Advertisements

Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
CHAPTER 15 Cost Analysis for Control. McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc., All Rights Reserved Decision Making Strategic, Operational,
Cost Analysis for Control
Cost Accounting Horngreen, Datar, Foster Flexible Budgets, Variances, and Management Control: I Session 7.
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 23.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
1-1.
Flexible Budgets and Standard Cost Systems
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
VARIANCE ANALYSIS 1 LECTURE 8.
Copyright © 2003 Pearson Education Canada Inc. Slide 7-76 Chapter 7 Flexible Budgets, Variances and Management Control: I.
Copyright © 2003 Pearson Education Canada Inc. Slide 7-91 Chapter 8 Flexible Budgets, Variances, and Management Control: II.
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
Chapter 17 – Additional Topics in Variance Analysis
Chapter 10 The Use of Budgets for Cost Control and Performance Evaluation.
Financial and Managerial Accounting
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems
ACCT 2302 Fundamentals of Accounting II Spring 2011 Lecture 14 Professor Jeff Yu.
Chapter 21 Flexible Budgets and Standard Costing.
1 Module 22 Standard Costs and Variance Analysis.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Deluxe Linens Deluxe Linens makes high-end sheets which they sell to major retail stores and on their website. The budgeted costs for materials and direct.
IES 342 Industrial Cost Analysis & Control | Dr. Karndee Prichanont, SIIT 1 The Flexible Budget and Standard Costing Chapter 13 Objectives: Develop and.
Copyright © 2008 Prentice Hall All rights reserved 11-1 Flexible Budgets and Standard Costs Chapter 11.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Performance Evaluation
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
© 2012 Pearson Prentice Hall. All rights reserved. Using Budgets for Planning and Coordination Chapter 10.
Chapter 16 Fundamentals of Variance Analysis.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
ACC 202 Daphne Sanchez Lois Andersson.  About: Who, What, When, Where, Why & How  Identifying  Cost Variance Computation  Materials Cost Variance.
1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 11.
Chapter 22. Prepare a flexible budget for the income statement.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Chapter 17 Overhead Cost Management Flexible Budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
9-1 Larry’s Lawn Service provides lawn care in a planned community where all lawns are approximately the same size. At the end of May, Larry prepared his.
Variance analysis 1 、 Basic variances 2 、 The reasons for variances 3 、 Operating statements 4 、 Investing variances 5 、 Materials mix and yield variances.
Managerial accounting
Performance Evaluation
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
STANDARD COSTS AND VARIANCE ANALYSIS FOR DECISION MAKING
Managerial accounting
Performance Evaluation Using Variances from Standard Costs
© 2017 by McGraw-Hill Education
Variance Analysis–A Tool for Cost Control and Performance Evaluation
Power Notes Chapter 21 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
AMIS 3300 Chapter 9.
© 2017 by McGraw-Hill Education
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Flexible Budgets, Variances, and Management Control: I
Presentation transcript:

Chapter 23 Flexible Budgets and Standard Cost Systems Demonstration Problems © 2016 Pearson Education, Inc.23-1

E23-15 © 2016 Pearson Education, Inc.23-2 Safe Now sells its main product, ergonomic mouse pads, for $13 each. Its variable cost is $5.30 per pad. Fixed costs are $220,000 per month for volumes up to 65,000 pads. Above 65,000 pads, monthly fixed costs are $275,000. Prepare a monthly flexible budget for the product, showing sales revenue, variable costs, fixed costs, and operating income for volume levels of 35,000, 55,000, and 269,500 pads.

E23-15 © 2016 Pearson Education, Inc.23-3

E23-15 © 2016 Pearson Education, Inc.23-4 Budget Amount Per Unit×Units=Total Budget Amount $13.00×35,000=$455,000

E23-15 © 2016 Pearson Education, Inc.23-5 Budget Amount Per Unit×Units=Total Budget Amount $5.30×35,000=$185,500

E23-15 © 2016 Pearson Education, Inc.23-6

E23-15 © 2016 Pearson Education, Inc.23-7

E23-15 © 2016 Pearson Education, Inc.23-8

E23-15 © 2016 Pearson Education, Inc.23-9 Budget Amount Per Unit×Units=Total Budget Amount $13.00×55,000=$715,000

E23-15 © 2016 Pearson Education, Inc Budget Amount Per Unit×Units=Total Budget Amount $5.30×55,000=$291,500

E23-15 © 2016 Pearson Education, Inc.23-11

E23-15 © 2016 Pearson Education, Inc.23-12

E23-15 © 2016 Pearson Education, Inc.23-13

E23-15 © 2016 Pearson Education, Inc Budget Amount Per Unit×Units=Total Budget Amount $13.00×80,000=$1,040,000

E23-15 © 2016 Pearson Education, Inc Budget Amount Per Unit×Units=Total Budget Amount $5.30×80,000=$424,000

E23-15 © 2016 Pearson Education, Inc.23-16

E23-15 © 2016 Pearson Education, Inc.23-17

E23-15 © 2016 Pearson Education, Inc.23-18

E23-19 © 2016 Pearson Education, Inc Pro Fender, which uses a standard cost system, manufactured 20,000 boat fenders during 2016, using 146,000 square feet of extruded vinyl purchased at $1.05 per square foot. Production required 410 direct labor hours that cost $15.00 per hour. The direct materials standard was seven square feet of vinyl per fender, at a standard cost of $1.10 per square foot. The labor standard was direct labor hour per fender, at a standard cost of $14.00 per hour. Compute the cost and efficiency variances for direct materials and direct labor. Does the pattern of variances suggest Pro Fender’s managers have been making trade-offs? Explain.

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct materials:

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct materials:

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct materials:

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct materials:

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct materials:

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct materials: * 7 sq. feet per fender × 20,000 fenders = 140,000 standard sq. feet

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct materials: * 7 sq. feet per fender × 20,000 fenders = 140,000 standard sq. feet

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct labor:

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct labor:

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct labor:

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct labor:

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct labor:

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct labor: * DLHr per fender × 20,000 fenders = 520 standard DLHr

E23-19 © 2016 Pearson Education, Inc Cost and efficiency variances for direct labor: * DLHr per fender × 20,000 fenders = 520 standard DLHr

E23-19 © 2016 Pearson Education, Inc Does the pattern of variances suggest Pro Fender’s managers have been making trade-offs? Explain.

E23-19 © 2016 Pearson Education, Inc Does the pattern of variances suggest Pro Fender’s managers have been making trade-offs? Explain. There may be trade-offs between the direct materials cost variance and the direct materials efficiency variance. Decisions made by the purchasing manager may affect the direct materials efficiency variance for the production manager. Pro Fender’s purchasing manager may have purchased lower quality (less expensive) direct materials, leading to the $7,300 favorable direct materials cost variance (the $1.05 actual direct materials cost per square foot was less than the $1.10 direct materials standard cost per square foot for the 146,000 square feet actually purchased).

E23-19 © 2016 Pearson Education, Inc Does the pattern of variances suggest Pro Fender’s managers have been making trade-offs? Explain. Lower quality direct materials would likely have contributed to the $6,600 unfavorable direct materials efficiency variance (the 146,000 square feet actually used was greater than the 140,000 square feet allowed for actual production of 20,000 fenders at the $1.10 direct materials standard cost per square foot). However, the total direct materials variance was $700 favorable (the $7,300 favorable direct materials cost variance minus the $6,600unfavorable direct materials efficiency variance), indicating that the savings from lower quality (less expensive) direct materials outweighed the less efficient usage of direct materials in production.

E23-19 © 2016 Pearson Education, Inc Does the pattern of variances suggest Pro Fender’s managers have been making trade-offs? Explain. There may be trade-offs between the direct labor cost variance and the direct labor efficiency variance. Decisions made by the human resources manager may affect the direct labor efficiency variance for the production manager. Pro Fender’s human resources managers may have hired more skilled (higher paid) direct labor workers, leading to the $410 unfavorable direct labor cost variance (the $15 actual direct labor cost per direct labor hour was greater than the $14 direct labor standard cost per direct labor hour).

E23-19 © 2016 Pearson Education, Inc Does the pattern of variances suggest Pro Fender’s managers have been making trade-offs? Explain. Hiring more skilled direct labor workers would likely have contributed to the $1,540 favorable direct labor efficiency variance (410 direct labor hours actually used was less than the 520 direct labor hours allowed for actual production of 20,000 fenders). However, the total direct labor variance was $1,130 favorable (the $1,540 favorable direct labor efficiency variance minus the $410 unfavorable direct labor cost variance), indicating that the more efficient use of direct labor in production outweighed the higher cost of hiring more skilled direct labor workers.

End of Chapter 23 © 2016 Pearson Education, Inc.23-39