1 Meredith Younghein Energy Division Local RA Requirements for Demand Response Resources: Staff Proposal.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

PG&Es 2009 Participating Load Pilot. 2 Overview Regulatory Context Pilot Characteristics Lessons Next Steps.
BAL-002-WECC-1 Contingency Reserves
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
Procurement and Resource Adequacy Briefing August 2, 2006 Molly Sterkel, California Public Utilities Commission.
ROLE OF RPS CALCULATOR IN >33% RPS STATEWIDE TRANSMISSION PLANNING? 1.
California Energy Action Plan Joint Public Meeting Electricity System Reliability Activities California Energy Commission July 17, 2003.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Resource Adequacy, Reliability, Risks and Markets October 9, 2006 Sean Gallagher California Public Utilities Commission Energy Division, Director.
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
What’s Needed for Rational Discussion of Resource Adequacy: A Framework and Some Facts * presented by Kevin Woodruff, Principal, Woodruff Expert Services,
Status Report: Resource Adequacy (RA) and Long Term Procurement Planning (LTPP) CPUC Energy Division Molly Tirpak Sterkel cpuc.ca.gov; Tel:
David Howarth MRW & Associates Oakland, California 1 JUST THE FACTS: RESOURCE PLANNING AND PROCUREMENT INDEPENDENT ENERGY PRODUCERS ANNUAL.
Transmission Congestion on the Delmarva Peninsula December 17, 2003 PA
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
1 R : LTPP Track II Workshop – Operating Flexibility Modeling Results Patrick Young Analyst, Generation & Transmission Planning California Public.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
1 Connecting the Dots Edward Randolph Director, Energy Division California Public Utilities Commission Date (example: April 26, 2012)
SOUTHERN CALIFORNIA EDISON SM Local Capacity Requirements (LCR) RFO for New Resources and Other SCE Solicitations Stu Hemphill September 26, 2013.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
California Energy Commission Options for Developing Contingency Mitigation Measures 2015 Integrated Energy Policy Report UC Irvine Campus, Irvine, California.
California ISO – Internal Use Only Flexible Capacity Requirement CPUC RA Workshop March 30, 2012 Mark Rothleder Executive Director Market Analysis and.
Reliability Demand Response Product February 25, 2011
Benefits of a Multi-year Resource Adequacy Program May 20, 2014 Karl Meeusen, Ph.D., Market Design and Regulatory Policy Lead Market and Infrastructure.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
Resource Adequacy for Distributed Generation January 27, :15 am to 12 noon Energy Division staff discussion Megha Lakhchaura.
ISO Comparison – CAISO Alex Lee (ERCOT)
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
GHG, Renewables, and Reliability IEP ANNUAL MEETING SEPTEMBER 29, 2015 Carrie Bentley Resero Consulting
Measurement & Verification at the Wholesale Market Level David Kathan FERC NAESB DSM/EE Business Practices Washington, DC April 11, 2007 The author’s views.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
1 PNW Regional Contingency Resources Resource Adequacy Technical Committee April 6 th, 2011.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Utility Procurement: What’s Next? IEP 2015 Annual Conference
An Overview of Demand Response in California July 2011.
1 California Energy Commission April 27, 2015 Valerie Winn Chief, State Agency Relations Contingency Planning and Diablo Canyon Power Plant.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
2015 IEPR Lead Commissioner Workshop Southern California Reliability University of California, Irvine August 17, 2015 Tom Doughty Director, State Regulatory.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Regulatory Policy SCE Discussion on the Relationship Between NQC and EFC.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Regulatory Affairs Demand Response and Local RA Criteria Discussion
RA workshop presentation Karl Meeusen, Ph.D. Senior Advisor – Infrastructure Policy CPUC Resource Adequacy Workshop February 18, 2016.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Long Term Study Task Force Update Seeking Software Solutions: Analysis of Future System Operational Reliability Requirements.
April 5, 2016 CPUC. JDRP Proposal  Flexible RA Attributes and requirements should be unbundled from the underlying system RA and Local RA attributes.
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
Shir Consultants Regulation and Market Monitoring in Electricity Markets Dariush Shirmohammadi Shir.
Energy: Challenges with Becoming More Sustainable © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Robb Anderson Director.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
CPUC Supply-side Procurement Processes
Asia-Pacific Energy Regulatory Forum
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Mike Jaske California Energy Commission
Recommendations for Finalizing RGGI Model Rule
Grid Integration of Intermittent Resources
Resource Adequacy Demand Forecast Coincidence Adjustments
Demand resource emergency energy measurement and verification
Presentation transcript:

1 Meredith Younghein Energy Division Local RA Requirements for Demand Response Resources: Staff Proposal

Maintaining current requirements for 2017 procurement proposal for 20 minute response time requirement was considered in 2015, and rejected Procurement direction for 2017 DR programs already developed in DR proceeding DR “Bifurcation” is underway. Large quantities of supply-side DR is located in local areas and therefore have been given a Local RA value. Response times of DR programs vary, based on required notification times for DR participants, and whether or not the DR is automated. Examples of the fastest responding DR programs are the Base-Interruptible program (BIP) and the A/C Cycling program. 2

Relevant CPUC Decisions D (2012 LTPP Track 4-SoCalReliability) discussed the issue of “fast responding” DR resources at length –defined as resources that can respond in 30 minutes. –record establishes that DR with potential to be activated in 30 minutes or less after a contingency event should be counted as “addressing the first contingency to prepare for the second contingency” in procurement resulting from this decision. –This implies that such DR should be counted to meet local capacity requirements for long term procurement purposes LTPP “Assumptions and Scenarios” ruling mentions the 20 minute DR response time by saying that DR resources “may need to respond in 20 minutes” to deal with a contingency event. 3

Recent Ruling on DRAM (E-4754, 1/27/16) Demand Reponse Auction Mechanism year 2 procurement Contracts would be executed in late May and submitted to the CPUC for approval in mid-June Deliveries :1/ /2017.

 All RTOs/ISOs are subject to NERC BAL-002 and TOP-001 to 004.  No other ISO/RTO requires DR to be dispatchable with 20-minutes notification in order to qualify as a Local Capacity Resource.  The requirement is upon the system operator, not upon any resource.  CAISO is singling out storage and DR as “uniquely” use limited.  CAISO is stating that resources with adequate energy for frequent dispatches are exempt.

 Local Capacity Requirements are determined in the LTPP based upon the single most severe contingency: ◦ Southern California, that is an N-1-1 event, sequential loss of 2 major transmission corridors. ◦ Determine if there is sufficient capacity in the local areas  Resource adequacy determines the operational requirements of resources to meet local, system and flexible capacity needs (MOO).

 Reliability Services Initiative (RSI) ◦ Conditionally approved by FERC ◦ Establishes MOO for DR resources for system and local capacity purposes ◦ FRACMOO established a MOO for DR flexible capacity resources  PRR 854 creates a 20-minute notification for resources that do not have sufficient energy for frequent dispatch.  JDRPs, along with others, protested and appealed PRR 854 on process and substance.

 Process ◦ Significant operational change for DR that was not discussed in a stakeholder process  Failure to appreciate the CAISO’s concerns  Failure to present other solutions.  Substance ◦ Inconsistent with CPUC RA requirements ◦ CAISO has not demonstrated why frequent energy dispatch is a necessary component for a resource being exempted from the 20-minute notification  A significant percentage of generators cannot change their dispatch instructions in 20 minutes ◦ N-1-1event is not a frequent occurrence, unless the CAISO is using some other definition of contingency.

 Due to lack of process, no other proposals were considered. ◦ In the event of a contingency, use-limited resources will be required to be dispatchable within 20- minutes notification. ◦ In non-contingency conditions, use-limited resources will respond to normal market dispatch instructions.  CAISO’s proposal is disruptive to DR market integration.