25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.

Slides:



Advertisements
Similar presentations
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 6” Origami Module and Front End Electronics 6 th Open Meeting of the.
Network Storage and Appliance Box Build By: Cubatic Engineering 01/09/2015.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Noise and Capacitor M.Friedl, R.Thalmeier, H.Yin (HEPHY Vienna) 24 September 2015.
Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
The Mechanical Structure for the SVD Upgrade
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
The Belle II Silicon Vertex Detector assembly and mechanics
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Comments on ladder structure 5 Feb Toru Tsuboyama.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
L5 Assembly 10 Sept C. Irmler (HEPHY Vienna) 8 th Belle II VXD Workshop OS5.905.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
QCG Report Francesco Forti University and INFN, Pisa.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Status & schedule of ladder parts production Oct. 2, 2014 Koji Hara (KEK)
Mechanics Status VXD Mechanics Meeting F.Buchsteiner (HEPHY Vienna) 07 September 2015.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Mechanical QA of DSSD 2013/2/5 The University of Tokyo High Energy physics Aihara-lab Nobuhiro Shimizu 1.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Mechanical robustness & associated tension at the DSSD slant part connection Mar-5 th 2013 B2GM KEK S. Uozumi (KNU), T. Tsuboyama, N. Sato (KEK)
SVD Summary Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 6 February 2013.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
BM&N STS ladders assembly in VLHEP
Florian Buchsteiner (HEPHY Vienna)
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
SVD Electronics Constraints
ATLAS pixel module assembly flow
Markus Friedl (HEPHY Vienna)
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Katsuro Nakamura Sep. 10, 2015 VXD meeting
Ladder Assembly All tools and jigs produced Glue dispensing works
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
Module/Ladder Assembly
Comments to the SVD4 structure
Class B Ladder assembly
SVD group organization, schedule, milestones
C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna
Presentation transcript:

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting

Introduction Overview of the assembly procedure for a Layer 6 ladder. Drawings and slides without HEPHY header are taken from Y. Onuki’s talk, presented at the 14 th B2GM in March 2013 Procedure recently IPMU Pictures from test assembly and new ideas added Modification of some jigs and steps is in progress C. Irmler (HEPHY), Y. Onuki (IPMU)25th April 20132

Ladder Assembly – Organization  Sharing of production:  L3: Melbourne – 7 + spares (2 sensors each)  L4: Tata (at IPMU) – 10 + spares (3 sensors each)  L5: HEPHY Vienna – 12 + spares (4 sensors each)  L6: Tokyo (IPMU) – 16 + spares (5 sensors each)  Contract between Tata and IPMU is being prepared  Interest of Italian groups (ex-SuperB) to join ladder assembly 25th April 2013M.Friedl (HEPHY Vienna)3

Ladder 6 with Origami Readout Challenging procedure, several jigs needed for assembly Master drawings & jigs prepared by Y.Onuki C. Irmler (HEPHY), Y. Onuki (IPMU)25th April 20134

SVD ladder assembly flow Forward assembly Backward assembly Origami Backward Forward Glue forward and backward sensors onto ribs Place DSSDs (rectangle, trapezoidal) onto assembly bench and align them Origami assembly Attach Origami sensors to ribs Origami PA gluing time ←parallel (independent each other) ←parallel (multiple sets of jigs) Common Procedure 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)5

Common Proc.01: Placing DSSD stopper test Table 3D B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)6

Common Proc.02: Placing DSSD test Table 3D B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)7

Common Proc.03: Removing DSSD stopper test Table 3D B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)8

Common Proc.04: Aligning PA1 and PA2. Dispensing glue. test Table 3D B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)9

Common Proc.05: Gluing PA1 and PA2 test Table 3D B PA jigs will be modified! 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)10

Common Proc.06: Wire bonding after removing PA1 and PA2-jig test Table B 3D Mechanical QA: Visual inspection of bonding wires. 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)11

Common Proc.07: Assembly bench w/ FW&BW mount bracket 3D Table B Calibrate coordinate system according to ladder mount position BW ladder mount = Origin 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)12

Common Proc.08: Placing DSSD(-z) test 3D Table B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)13

Common Proc.09: Placing DSSD(CE) test 3D Table B Repeating Common Proc th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)14

Repeating Common Proc.01-6 Common Proc.10: Placing DSSD(+z) test 3D Table B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)15

Common Proc.11: Removing Alignment-jig test 3D Table B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)16

Common Proc.12: Replacing FW part. test 3D Table B Screw hole to fix the hybrid board In this procedure, only replacing FW part. The other jigs never move. FW jig very close to sensor  damage of edge possible Should be done before Common Proc. 08! 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)17

Common Proc.13: Placing FW DSSD and FW hybrid board test 3D Table B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)18

Common Proc.14: Replacing BW part test 3D Table B BW jig very close to sensor  damage of edge possible Should be done before Common Proc. 08! 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)19

Common Proc.15: Placing BW DSSD and BW hybrid board test 3D Table B Screw hole to fix the hybrid board 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)20

Common Proc.16: Placing XYZθ-stage. Aligning DSSD(BW). test 3D Table B The detail of this procedure can be seen in the slide of Shimizu at Wetzlar 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)21

Common Proc.17:Placing XYZθ-stage. Aligning DSSD(-z). test 3D Table B The detail of this procedure can be seen in the slide of Shimizu at Wetzlar 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)22

Common Proc.18:Placing XYZθ-stage. Aligning DSSD(CE). test 3D Table B The detail of this procedure can be seen in the slide of Shimizu at Wetzlar 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)23

Common Proc.19:Placing XYZθ-stage. Aligning DSSD(+z). test 3D Table B The detail of this procedure can be seen in the slide of Shimizu at Wetzlar 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)24

Common Proc.20:Placing XYZθ-stage. Aligning DSSD(FW). test 3D Table B The detail of this procedure can be seen in the slide of Shimizu at Wetzlar 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)25

Common Proc.21: Removing XYZθ-stage test 3D Table B Mechanical QA: Inspection of alignment of DSSDs w/ the coordinate measuring machine. The detail of the procedure can be seen in the slide of Shimizu at Wetzlar 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)26

Independent BW and FW part assembly Baseline procedure –Full ladder is assembled at one site –Sensors can be aligned before hybrids are attached. Independent assembly of BW, FW and Origami parts –Origami assembly unchanged –Pre-assembled FW and BW modules has to be attached –Can we alignment complete BW and FW modules? –xy θ-stage needs to be modified in order to align sensor + hybrid at once The following assembly procedures of BW and FW modules have to be modified, too C. Irmler (HEPHY), Y. Onuki (IPMU)25th April

SVD ladder assembly flow Forward assembly Backward assembly Origami Backward Forward Glue forward and backward sensors onto ribs Place DSSDs (rectangle, trapezoidal) onto assembly bench and align them Origami assembly Attach Origami sensors to ribs Origami PA gluing time ←parallel (independent each other) ←parallel (multiple sets of jigs) 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)28

FW&BWProc.01 : Aligning PF2 and PB2 test 3D Table B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 29

FW&BWProc.02 : Placing PF2-jig and PB2-jig. Vacuum chucking. test 3D Table B PF2-jig PB2-jig PB2 and PF2-jigs have individual vacuum chambers and thus joints. One to fix the DSSD and the second for the PF(B)2. Two joints 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 30

FW&BWProc.03 : Picking up the jigs. Dispensing glue. test Table B 3D Glue(Yellow) 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 31

FW&BWProc.04 : Placing again and gluing PF2 and PB2 test 3D Table B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 32

FW&BWProc.05 : Removing PB2-jig and PF2-jig test 3D Table B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 33

FW&BWProc.06 : Lifting up the assembly-bench test 3D Table B There are grooves for vacuum tubes at the FW and BW FW BW 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 34

FW&BWProc.07 : Wire bonding after picked up the F(B)W parts. test Table B 3D Mechanical QA: Visual inspection of bonding wires Electrical QA: Readout test with APVDAQ After the screwing the hybrid board, We can plug the connector. 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 35

FW&BWProc.08 : Lifting up the assembly-bench test Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 36

FW&BWProc.09 : Returning the FW and BW part. test Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 37

FW&BWProc.10 : Placing PF2-jig and PB2-jig again. test Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 38

FW&BWProc.11 : Picking up the BW and FW parts. test Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 39

FW&BWProc.12 : Placing PF1 and PB1. Dispensing glue on them. test Table B 3D There are alignment holes on the surface 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 40

FW&BWProc.13 : Gluing PF1 and PB1. test Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 41

FW&BWProc.14 : Removing the jigs test Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 42

FW&BWProc.15 : Placing PF2-jig and PB2-jig again. test Table B 3D The after, clipping rubbers for each hybridboard to fix the hybridboard to the PF(B)2-jigs. Rubber 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 43

FW&BWProc.16 : Picking up the parts. Wire-bonding. test Table B 3D Mechanical QA: Visual inspection of bonding wires Electrical QA: Readout test with APVDAQ 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 44

FW&BWProc.17 : Returning the PF2,PB2-jigs test Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Not tested yet! 45

FW&BWProc.18 : Placing Slant-jig and Backward-jig. Table B 3D Backward-jig Slant-jig 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)46

FW&BWProc.19 : Picking up the slant hybrid board. Table B 3D Picking up hybrid board with thin wire. 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)47

FW&BWProc.20 : Moving the X-stages Table B 3D Moving the X-stage to the edge of hybrid board 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)48

FW&BWProc.21 : Clamping the edge of hybridboard test Table B 3D Clamping the edge of hybrid board with screw Clamping screw 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)49

FW&BWProc.22 : Picking up the Slant-jig and Backward- jig. test Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)50

FW&BWProc.23 : test Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) Place jigs at a secure location 51

SVD ladder assembly flow Forward assembly Backward assembly Origami Backward Forward Glue forward and backward sensors onto ribs Place DSSDs (rectangle, trapezoidal) onto assembly bench and align them Origami assembly Attach Origami sensors to ribs Origami PA gluing time ←parallel (independent each other) ←parallel (multiple sets of jigs) 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)52

Gluing ribs Proc.01 : Placing the FW and BW parts test Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)53

Gluing ribs Proc.02 : Placing the bridge and screwing Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)54

Gluing ribs Proc.03 : Placing the supports Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)55

Gluing ribs Proc.04 : Placing the ribs Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)56

Gluing ribs Proc.05 : Placing the stopper pins Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)57

Gluing ribs Proc.06 : Moving the boards to the position. Table B 3D Moving the hybrid boards to the proper positions. 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)58

Gluing ribs Proc.07 : Dispensing glue on the ribs Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)59

Gluing ribs Proc.08 : Placing the Slant-jig and Backward-jig Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)60

Gluing ribs Proc.09 : Gluing and connecting the board on the MB. Table B 3D The jigs will stop at the proper Z position. 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)61

Gluing ribs Proc.10 : Picking up the Slant-jig and Bacward-jig Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)62

Placing Slant and BW parts Precision of pins poor Original Idea: –Angle of slanted sensor is defined by slant jig, 2 pins and linear bushings –Not precise enough –Fragile setup Possible solution: –Use two wedge shaped jigs to determine angle –Allows to use high precision pins –Needs to be verified C. Irmler (HEPHY), Y. Onuki (IPMU)25th April

Gluing ribs Proc.11 : Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)64

SVD ladder assembly flow Forward assembly Backward assembly Origami Backward Forward Glue forward and backward sensors onto ribs Place DSSDs (rectangle, trapezoidal) onto assembly bench and align them Origami assembly Attach Origami sensors to ribs Origami PA gluing time ←parallel (independent each other) ←parallel (multiple sets of jigs) Common Procedure 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)65

OrigamiProc.01 : Preparing the Assembly-bench Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)66

OrigamiProc.02 : Placing the dummy FW and BW DSSD Table B 3D Dummy DSSDs are just used for making flat Z surface. 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)67

OrigamiProc.03 : Preparing the AIREX-jig Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)68

OrigamiProc.04 : Placing the AIREX stopper Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)69

OrigamiProc.05 : Placing the AIREX Table B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)70

OrigamiProc.06 : Removing AIREX stopper. Dispensing glue Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)71

OrigamiProc.07 : Gluing AIREX Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)72

OrigamiProc.08 : Removing AIREX-jig Table B 3D Dummy BW-DSSD is not glued with the AIREX 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)73

OrigamiProc.09 : Preparing the Origami-alignment- jig Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)74

OrigamiProc.10 : Placing Origami(CE). Wire-binding APV25 Table B 3D Mechanical QA: Visual inspection of bonding wires Electrical QA: Readout test with APVDAQ Origami(CE) can be aligned by alignment holes 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) alignment holes 75

OrigamiProc.11 : Placing Origami(CE)-jig. Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)76

OrigamiProc.12 : Dispensing glue. Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)77

OrigamiProc.13 : Gluing Origami(CE) Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)78

OrigamiProc.14 : Removing Origami(CE)-jig Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)79

OrigamiProc.15 : Preparing the Origami-alignment- jig Table B 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)80

OrigamiProc.16 : Placing Origami(-z). Wire-binding APV25 Table B 3D Mechanical QA: Visual inspection of bonding wires Electrical QA: Readout test with APVDAQ Origami(-z) can be aligned with the alignment holes Alignment hole Alignment holes 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)81

OrigamiProc.17 : Placing Origami(-z)-jig Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)82

OrigamiProc.18 : Dispensing glue Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)83

OrigamiProc.19 : Gluing Origami(-z) Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)84

OrigamiProc.20 : Gluing Origami(-z) Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)85

OrigamiProc.21 : Placing Airex(+z) Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)86

OrigamiProc.22 : Preparing the Origami-alignment- jig Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)87

OrigamiProc.23 : Placing Origami(+z). Wire-binding APV25 Table B 3D Alignment hole Mechanical QA: Visual inspection of bonding wires Electrical QA: Readout test with APVDAQ Origami(+z) can be aligned with the alignment holes 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)88

OrigamiProc.24 : Placing Origami(+z)-jig Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)89

OrigamiProc.25 : Dispensing glue Table B 3D For Origami(+z) AIREXFor slant AIREX 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)90

OrigamiProc.26 : Gluing Origami(+z) Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)91

OrigamiProc.27 : Removing Origami(+z)-jig.DSSD wire- bond Table B 3D Mechanical QA: Visual inspection of bonding wires Electrical QA: Readout test with APVDAQ 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)92

OrigamiProc.28 : Wrapping PAs Table B 3D Wrapping and gluing as usual way. 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)93

SVD ladder assembly flow Forward assembly Backward assembly Origami Backward Forward Glue forward and backward sensors onto ribs Place DSSDs (rectangle, trapezoidal) onto assembly bench and align them Origami assembly Attach Origami sensors to ribs Origami PA gluing time ←parallel (independent each other) ←parallel (multiple sets of jigs) Common Procedure Final procedure 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)94

Final Proc.01 : Preparing the Origami part 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)95

Final Proc.02 : Lifting up the assembly-bench Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)96

Final Proc.03 : Dispensing the glue on the BW dummy DSSD Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)97

Final Proc.04 : Placing down the assembly-bench Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)98

Final Proc.05 : Lifting up again. Glues are stamped on BW. Table B 3D Stamped glue From backside view 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU) We dispensed the glue directly onto the BW sensor 99

Final Proc.06 : Replacing the Ribs+FW+BW parts. Dispensing glue. Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)100

Final Proc.07 : Placing the Assembly-bench Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)101

Final Proc.08 : Gluing the Origami and Ribs. Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)102

Final Proc.09 : Placing down the bench. Dispensing glue. Table B 3D Dispensing glue some spots on the backside of Origami(+z) 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)103

Final Proc.10 : Gluing the Origami(+z) Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)104

Final Proc.11 : Attaching the rods at the rib support. Table B 3D M3 screw holes The rods act like a bumper and handles. 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)105

Final Proc.12 : Pulling up the support with rods. Table B 3D 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)106

Final Proc.13 : Finish. Table B 3D Mechanical QA: Inspection of alignment of DSSDs w/ the coordinate machine. Thermal cycle test(not all, sampling) Electrical QA: Readout test with APVDAQ Source test 25th April 2013C. Irmler (HEPHY), Y. Onuki (IPMU)107

The Final Layer 6 Dummy Ladder The ladder is still mounted on the rib jig Cooling pipe already attached C. Irmler (HEPHY), Y. Onuki (IPMU)25th April

C. Irmler (HEPHY), Y. Onuki (IPMU)25th April 2013 Thank you 109