Issues with Reactive Testing and the NDCRC S. Looney QMWG, 11/5/2012.

Slides:



Advertisements
Similar presentations
Testing Workshop: Reactive Capability Testing
Advertisements

DSWG Update to WMS May 17, DSWG Goals Update.
Discussion of MOD Comparison to ERCOT Requirements Luminant OWG, May 21,
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
NERC LTRA Update / CDR Capacity Counting Issues
A Partial Interim Report To WMS Guidance on Implementing Protocol Implementation Plan (PIP) 102 Reactive Power Task Force.
Resource Asset Registration Form Version 5.0 / 5.1 Changes for WGRs QMWG Presentation - July 9, 2012.
Frequency Control Turbine Governor Droop NERC Requirement
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Audit & Compliance Tips Jagan Mandavilli Senior Compliance Engineer.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
RARF QnA Session April 17, Resource Registration Process and Schedule Final RARF forms sent during week of April 7 –New Resources should get blank.
Protocol Revision Subcommittee Tom Burke July 2, 2013.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
RDWG – MP Online Data Entry – Project Priority List / Update July 30, 2013 Troy Anderson.
Workshop: Reactive Power Testing:
April 23 rd OWG UFLS Survey & Power Factor Review.
QSE/RE Transmission Facilities Outage Coordination Workshop.
Generator Test Data, Generator Capability Curve, and NPRR 366 Terms March 14, 2012 Mike Noth & Bracy Nesbit 1.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
RARF Frequently Asked Questions from Resource Entities Ed Geer RARF Workshop III 8/29/2013.
Integration Update 1 External Interfaces & Integration October 14, 2008 Brian Brandaw.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
NPRR 219 & Outage Scheduler Enhancement Workshop April 28, 2014.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
Resource Asset Registration Form Version 5.1 Update July 12, 2012.
Lead from the front Texas Nodal 1 Registration and RARF Update to TPTF August 27, 2007.
NPRRs NPRR 681 Clarifications to Dynamic Ratings. This Nodal Protocol Revision Request (NPRR) adds clarification for Dynamic Ratings provided via ICCP.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
Optimizing Deployment of CCGT Duct Firing Capacity in the Nodal Market Josh Clevenger Brazos Electric Cooperative.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
October 14, 2015 LRIS v2 / Self-scheduled Third party DR Provider Data Submission Proposal Carl L Raish.
1 Submitting a RARF Art Deller, P.E. Supervisor, Model Administration New Generation Workshop November 4, 2014.
By Tony Hudson SSWG Chairman.  12DSA cases were recently completed per the procedures approved by ROS in March  The purpose of this presentation.
Nov 5, RRGRR 007 Adding Solar Registration Inputs The RDWG met on October 20, and has completed it’s review of RRGRR 007 with the revised Impact.
ERS Update – DSWG Presentation September 21, 2012.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
Distributed Generation Registration June 30, 2008.
Steady-State Working Group: Resource Modeling Discussion Wes Woitt September 27 th, 2011.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Review of Integration of the Requirements of MOD Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Resource Registration Update Dana Showalter Patrick Coon May 5, 2008.
SGR issues associated with ICCP. 2 ICCP handbook update Split Generation Resources Split Generation Resources are modeled separately by each.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
RARF QnA Session November 1, General Information EDS 4-1 RARF due on Friday, November 9, This includes pink, blue, white cells. (Also should.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Next Steps on Reserve Discount Factor and 2016 Ancillary Service Methodology ERCOT Staff Date 02/25/2016.
October 29, 2012 RARF Workshop 2 ERCOT RARF Data Request Issues Jay Teixeira Manager, Model Administration.
QSE Managers Working Group Meeting Notes 9 October, 2008 Report to WMS 22 October, 2008 David Detelich - Chairperson.
Lead from the front Texas Nodal 1 Texas Nodal Ancillary Service Qualification Self-Certification approach ROS Discussion March 16,
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Wind Operations Task Force Overview for ROS Jan 2009 mtg: WOTF is continuing work on issues #1a/b/c, 1d, 3e, and 5. The WOTF makes no recommendation to.
Ajay Pappu Resource Integration Department ERCOT Generator Frequency Relay Settings Survey Dec 2013.
Reactive Power Task Force
Oncor Electric Delivery Company LLC
Presentation transcript:

Issues with Reactive Testing and the NDCRC S. Looney QMWG, 11/5/2012

NDCRC Issues Under the Data Points section, 12 points are required to define the reactive capability curve. The RARF accepts 9 points only. This leads to confusion when comparing curves. Under Test Reactive Capability section, the Net Dependable Generation value is not well defined.

NDCRC Issues, cont. Under the Submittal Information section, the QSE identity is populating the Resource Entity field. The user must have a Resource Digital Cert and it populates the Resource Entity field with the user’s name even though the user is a QSE. When entering Reactive Test data, the system does not accept positive and negative values as applicable. For a Lagging VAR test, the form will not allow negative VAR values and on a Leading VAR test, the form will not allow positive values for VARs. There are 5 approved Turbine Governor Speed Test forms in the Operating Guides, only 3 in the NDCRC. Recommend that Resource Entities, instead of QSEs, be required to submit the Reactive Tests, requires revision to Op Guides (9)

Issues with Reactive Testing Only allowed to submit 1 CURL on the RARF Actual CURL’s are ambient temperature and system voltage dependent ERCOT has rejected tests which do not match the one submitted CURL when the testing conditions varied from the conditions of the submitted CURL. In that instance, ERCOT requested submittal of a new RARF to resolve the discrepancy. This occurs most often on air-cooled generators (combustion turbines) Recommend Protocol or Operating Guide change to process to allow submittal of more than one CURL on the RARF, perhaps up to 4 seasonal CURLs to reflect ambient and system conditions Get ERCOT to recognize that tested CURLs may be different from what is shown in the RARF