TOWN OF TRUCKEE GLENSHIRE PROJECTS SUMMER 2016 AND 2017 Scott Mathot Assistant Engineer April 13, 2016.

Slides:



Advertisements
Similar presentations
Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows.
Advertisements

4 Process Mapped and documented current conditions and trail use patterns Community outreach Seven initial public meetings were held at locations.
The Virginia Capital Trail
Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding.
COMPLETE STREETS ROCHESTER, MINNESOTA September 28, 2011 Mitzi A. Baker, AICP Active Living Rochester Rochester-Olmsted Planning Department.
Titusville to Edgewater Bike Loop PD&E Study
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Santa Maria River Bridges Widening. Project Location.
Capital Improvement Program City of Warren, Ohio April 2012.
Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM Presented.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Contact: Beth Morris
1 Feel free to contact us at
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
1 Arizona State Parks Heritage Fund FY $ 5,900,000 FY $10,000,000 FY $10,000,000 FY $10,000,000 FY $10,000,000 FY.
SHARING AND CARING. OUR COMMITMENT TO OUR COMMUNITY Our mission for community involvement is to assist and support individuals and organizations to help.
February 10, 2015 Martin Lang, MPA Deputy Director of Field Operations.
 FRLP Proposed Boundary Line Adjustment: Confluence Virginia What life have you if you have not life together? There is no life.
ALL ROADS LEAD TO HATTIESBURG State of the City 2007 Presented by Mayor Johnny L. DuPree, Ph.D.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
Heavy Construction Association March 20, 2013 Robert Sharon, Director of Community Services Kit Woods, P. Eng., Manager of Environmental Services Allan.
Project IDAgencyTitleRelevant Project ComponentCompletion Date LAE0332City of Long BeachLong Beach Park & Ride LotPRL with 400 parking spacesJune, 2014.
Warwick Boulevard Townhall Meeting May 21, 2007 Thomas A. Druhot, P.E. VDOT Hampton Roads District Peninsula Area Construction Engineer.
PYRAMID LAKE PAIUTE TRIBE BIG BEND RV PARK
Town Council President: John Weingardt Town Manager : Scott Fadness Director of Public Works: Eric Pethtel Assistant Director of Public Works: Rick Farnham.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
Project Name County: X (Cuyahoga District #) Photo Type (All-purpose, Mountain Bike, Bike Lanes, etc.— pavement must be dedicated for non- motorized use.)
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Bluff-Residential Carver CornerDowntown HNI Campus.
Public Input Meeting April 16, Meeting Schedule Housekeeping Meeting Schedule – Open House – 6:00-6:30 pm – Presentation – 6:30-7:00 pm – Q&A –
2016 Mill and Overlay Project
Scranton/Carter Road Reconstruction
CITY OF NORFOLK, NEBRASKA
Sheldon (Maple to Library) Preferred Design Meeting
General Road Construction Information
Multiplication table. x
Titusville Community SWOT Analysis
Project Overview Multimodal improvements to 22.5 miles of I-66
PUBLIC VISIONING PORTAL RESULTS
Rapid transit in Waterloo Region?
Capital Improvement Program
Transportation Projects
North Main Street Intersection Improvements at Route 460 Bypass
Responsibilities and FUNDING
CH 42 & TH 13 Construction Update
St. Johns River-to-Sea Loop Trail Summit
Promoting Walking in Bermondsey
District 4 Community Park Meeting Nov
Grant Funding for Outdoor Recreation through DCR
PLUM CREEK PARKWAY WIDENING AND PLUM CREEK PARKWAY/GILBERT STREET ROUNDABOUT PROJECT DESIGN APRIL 3, 2018.
5 × 7 = × 7 = 70 9 × 7 = CONNECTIONS IN 7 × TABLE
5 × 8 = 40 4 × 8 = 32 9 × 8 = CONNECTIONS IN 8 × TABLE
Rapid transit in Waterloo Region?
4 × 6 = 24 8 × 6 = 48 7 × 6 = CONNECTIONS IN 6 × TABLE
5 × 6 = 30 2 × 6 = 12 7 × 6 = CONNECTIONS IN 6 × TABLE
Acquisition Details: Owners: James E Joyce Sr. Revocable Intervivos Trust and Gloria A Joyce Revocable Intervivos Trust Location: Section 27, Town of.
10 × 8 = 80 5 × 8 = 40 6 × 8 = CONNECTIONS IN 8 × TABLE MULTIPLICATION.
3 × 12 = 36 6 × 12 = 72 7 × 12 = CONNECTIONS IN 12 × TABLE
Saddlerock Trailhead Prepared for: Prepared by:.
5 × 12 = × 12 = × 12 = CONNECTIONS IN 12 × TABLE MULTIPLICATION.
Monterey County Project Report for Measure X Expenditures
Lecture Traffic Engineering Assistant Lecturer: Areej Muhy
Dover Farms Warrant Petition
5 × 9 = 45 6 × 9 = 54 7 × 9 = CONNECTIONS IN 9 × TABLE
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
3 × 7 = 21 6 × 7 = 42 7 × 7 = CONNECTIONS IN 7 × TABLE
Welcome to Kindergarten Kindergarten FIELD TRIP
Presentation transcript:

TOWN OF TRUCKEE GLENSHIRE PROJECTS SUMMER 2016 AND 2017 Scott Mathot Assistant Engineer April 13, 2016

Town Projects in Glenshire  Implement/Construct multiple projects in Glenshire over the next two summers  Town annually completes slurry seal application to Glenshire streets on a tri- annual basis  Important projects coming to Glenshire in the next two years!

2016 Slurry Seal Program

2016 Paving and Drainage

Glenshire Drive from Wiltshire Lane to Town Limit Dorchester Drive from Waterloo Circle to Glenshire Drive

Truckee River Legacy Trail Glenshire Trailhead (2016)  Construct 33 space trailhead parking facility  Provide amenities such as:  Trail Access  Picnic Tables  Trash/Recycling Enclosure  Pet Waste Bag Dispenser  Interpretive Exhibit

2017 Glenshire Drive/Dorchester Drive Widening Project  Widen Glenshire Drive from Berkshire Circle to Wiltshire Lane  Widen Dorchester Drive from Glenshire Drive to Waterloo Circle  Both roads will be widened, reconstructed, and repaved to provide Class 2 bike lanes through Glenshire

2017 Glenshire Drive/Dorchester Drive Widening Project

Questions about Town projects?  Feel free to contact: Scott Mathot, Assistant Engineer O: C: