IIFC Instrumentation R&D for Project X at BARC C.K. Pithawa, T.S. Ananthkrishnan, Gopal Joshi – BARC Manfred Wendt – Fermilab.

Slides:



Advertisements
Similar presentations
Electric Bus Management System
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Project Management Tips Rick Rozzelle – Moderator Cathy Rinehart–Kansas Jim McMahon–Louisiana Deb Holdren - Georgia.
J-1 Next Steps Jordan Dentz. J-2 Assignments 1. Establish core continuous improvement team (April 21) 2. Current state value stream map (draft April 28;
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
Calice Meeting DESY 13/2/07David Ward Guidelines for CALICE presentations Recently approved by the Steering Committee.
Centers for IBM e-Business Innovation :: Chicago © 2005 IBM Corporation IBM Project October 2005.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Development plan and quality plan for your Project
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
HEPiX Orsay 27 th April 2001 Alan Silverman HEPiX Large Cluster SIG Report Alan Silverman 27 th April 2001 HEPiX 2001, Orsay.
INTERNET2 COLLABORATIVE INNOVATION PROGRAM DEVELOPMENT Florence D. Hudson Senior Vice President and Chief Innovation.
*All other brands and names are the property of their respective owners. Slide 1 ® UDIG Driver Test Suite Rob Mills Barry Feild
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
CIS 499 Senior Seminar Introduction to IT project management.
Do it pro bono. Annual Report Service Grant. do it pro bono. 2 Outline What is an Annual Report Service Grant? Why do an Annual Report Service Grant?
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Controls & LLRF ILC Controls Telecon September 20, 2006 John Carwardine 1.Reports from ESRF Meetings 2.Misc. Items 3.Participant “Radar” Items.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
PROJECT LIFECYCLE.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Systems Development AIMS 2710 R. Nakatsu. Overview Two philosophies of systems development –Systems Development Life Cycle (SDLC) –Prototyping Alternative.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Middle Fork Project Relicensing Process Plan April 25, 2006.
Quality Assurance at CMM Level 2 Copyright, 2000 © Jerzy R. Nawrocki Requirements.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Follow-up to SFT Review (2009/2010) Priorities and Organization for 2011 and 2012.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Group B Summary IIFC Rich Stanek October 28, 2010.
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Group B Summary IIFC Rich Stanek October 28, 2010.
ITIL Project Change Management Workshop 7 February 2007
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
September 20, 2005Margaret Votava1 ILC Controls Planning.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
Summary Instrumentation & Controls WG Wim Blokland Jim Patrick Manfred Wendt Project X Collaboration Meeting September 12, 2009.
DAE-Fermilab Collaboration on Instrumentation and Control Gopal Joshi Electronics Division, BARC Visits - Gopal Joshi to Fermilab Manfred Wendt, Peter.
BUS 611 Week 4 Assignment Integrated Project Management To purchase this material link
PRG 420 Week 2 Learning Team Quality Control Sheet To purchase this material click below link Week-2-Learning-Team-Quality-Control-Sheet.
EDL 510 Week 6 Learning Team Global Service Learning Project Proposal To purchase this material click below link
STAYER BUS 599 Week 8 Project Deliverable 4 Business Plan Draft Check this A+ tutorial guideline at
BSHS 382 Week 3 Learning Team Research Proposal Check this A+ tutorial guideline at 382-Week-3-Learning-Team-Research-Proposal.
How to write an effective RFP
ILC Beam Instrumentation – Introduction Remarks –
ATF/TTF Instrumentation March 19, 2007 Last report: January 22, 2007
WP5: Dissemination, studies, web portal and tools
LCG Operations Centres
CSE 498, Collaborative Design
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Lancaster ISD 2015 Bond Program Update
Creating Communications with a Team
Joint Application Development (JAD)
Status of the ESS High Power RF Systems
CEN 5011 Advanced Software Engineering
Now Buy Best External Door Hardware from Doorhardware
SDLC (Software Development Life Cycle) Role Play
Presentation transcript:

IIFC Instrumentation R&D for Project X at BARC C.K. Pithawa, T.S. Ananthkrishnan, Gopal Joshi – BARC Manfred Wendt – Fermilab

BARC Collaboration Proposed Project X instrumentation R&D activities: –LLRF system –BPM system –RF interlock system First steps to initiate the collaboration –Fermilab needs to transfer technical information to BARC Presentations, write-ups, schematics, layouts, etc. –Inform Fermilab colleagues about the collaboration details Manfred has to inform his team, and other Fermilab colleaegues. –Draft R&D scope and deliverables Propose HINS as test bed –Visit of C.K. Pithawa at Fermilab to strengthen the contacts (2-4 days) Meeting with Brian Chase (LLRF), Peter Prieto (RF protection), Charlie Briegel (Controls), and many others. Finalize plans and scope for BPM, RF protection & LLRF systems. Draft of a schedule

BARC Collaboration Next steps… –Fermilab needs to define specifications and requirements for all three projects. Requirement Specification of BPM, scope of work and deliverables, including calibration and test set-up for the BPM and time schedule to be jointly worked out. The application software requirements and interface details will be discussed later with colleagues at Fermilab. –Visit of a senior BARC engineer to Fermilab(?), ~1 week Workout details on the R&D deliverables for all three projects. At the end of this visit we need to have a detailed plan, including schedule, requirements, deliverables, etc. –Send 1-2 young BARC engineers for 3-6 month to Fermilab Work as member of the Fermilab instrumentation team Receive detailed technical information, get used to tools, procedures, tricks, hands-on activities, trouble-shooting, and the day-to-day engineering struggle. Finalized all definitions and interfaces on the R&D deliverables.

BARC Collaboration Opens questions –BARC want to initiate the collaboration on all three systems simultaneously! It might be preferable to start with one activity, e.g. a BPM system for HINS?! –Should we send a senior BARC engineer for 1-2 weeks? –BARC proposed participation in development of the Global Project X Control System. Fermilab would respond later. At this moment Fermilab would limit control activities to drivers, interfaces, ACNet-in-a Box, etc.