The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.

Slides:



Advertisements
Similar presentations
Roles & Responsibilities in Construction Management
Advertisements

Delivering Successful Facility Projects It Starts and Ends with You!
TQM Study in Royal Commission of Jubail CEM 515. Purpose of the royal commission Is to develop, construct and maintain the infrastructure of Jubail-2:
Contract CloseOut.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Close Out of a Construction Project, …the Hardest Part. PASBO 49th Conference Clinic Table March 12, 2004 Richard A. Bernardini, PE Vice President.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
CTC-470 Construction Administration Project Management Concepts.
Project Closeout Issues A Review of Critical Tasks Required During the Closeout Process.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Project Close Out CTC-470.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Conditions of the Contract for Construction
ESTIMATING By Laith Jacob.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Activation, Transition & Closeout – Step 7 June 2015 Final PD Training FMD WUSM 6/15/15 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Readiness Stephen Sawch, Assistant Director for Construction Management Conventional Facilities.
Manage Deliverables - Construction – Step 6
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Construction Administration & Project Acceptance Welcome Scott Kirchner, Altus Architectural Studio Jon Hilton, Farris Engineering Jason Studt, JE Dunn.
Standards of Practice Course
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
THE ECONOMICS OF RE-CREATING EDUCATIONAL ENVIRONMENTS HOW TO ACHIEVE HIGH PERFORMANCE SCHOOLS.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
1 RMS Training RMS BASICS May Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
Scoping a Commissioning Job in Terms of Contractor Involvement ???
1 RMS Training RMS BASICS April Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Agency Construction Management :CM NOT AT-RISK
Construction Eng 221 Project Management and Administration.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
1 RMS Training RMS BASICS July Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
McDonough Bolyard Peck 1 CEFPI’s 81’st Annual International Conference PROJECT QUALITY MANAGEMENT by Edward M. Kopp and James Yatzeck.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Quicx developed by Chinook Systems Inc. David Wampler, Software Manager Wanda Lenkewich, Owner 2014 buidlingSMART Challenge107-Jan-14.
CONSTRUCTION ADMINISTRATION Quality Control, Responsibility & Liability TQC Presentation 01/17/08.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
CONTRACT DOCUMENTS & CONSTRUCTION
Document Handover Training Session
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Administrator of Construction Todd Wilson Senior Project Manager
Early Regulatory Agency Involvement and Health Care Facility Performance Success State of Wisconsin Department of Health Services Division of Quality Assurance.
The Nuts & Bolts of Servicing a 221(d)(4) Construction Loan
Presentation transcript:

The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C

CM Manual - Living Document A work in progress. A resource for document control. To fill your site-specific needs. 2

CM MANUAL – TABLE OF CONTENTS 8 Sections 1.Document Control 2.Mobilization and Start-up 3.Contract Administration 4.Quality Management 5. Safety 6. Schedule Management 7. Risk Management 8. Project Closeout & Turnover Glossary Appendix 3

Section 2 Mobilization & Start-Up Pre-construction Conference Substitution Requests Permits Insurance Certificates Performance and Payment Bonds Site Office Site Management Plan Meeting Schedule / Calendar Partnering Early Submittals Establish Risk Management Process Establish Project Controls Systems Establish Communication Plan 4

Section Mobilization – Pre-Construction Conference Purpose – Inform all participants CM Role – Facilitate meeting 5

Section Mobilization – Substitution Request Material –Submittal process Subcontractor –Approval process 6

Section Mobilization & Start-Up - Permits Responsibility Payment Display NEPA compliance Environmental issues Right of way Limits and boundaries 7

Section Mobilization – Insurance Certificates Types –Builder’s Risk –General Liability –Worker’s Compensation –Professional Liability (when required) Owner-Controlled Insurance Program (OCIP) 8

Section Mobilization – Bonds Types –Performance Bonds –Payment Bonds 9

Section Mobilization – Site Office Requirements in Division 1 Office set-up checklist –Office Set-up ChecklistOffice Set-up Checklist 10

Section Mobilization – Site Management Plan Parking Safe access and egress –Regulatory requirements Site signage Temporary and permanent utilities –Application –Requirements –Payment –Coordination 11

Section Start-up – Meeting Schedule / Calendar Attendance Format Schedule Coordination 12

Section Start-up – Partnering Attendance Format Schedule Coordination Payment “Partnering is used to establish a collaborative solution – oriented process for the project. It does not replace contractual obligations” 13

Section Start-up – Early Submittals Safety Plan QC Plan Schedule of Values Submittal Schedule Long-lead materials Initial Progress Schedule 14

Section Start-up – Risk Management Process Section 7 in CM Manual Potential issues and how they will be handled – CM ManualCM Manual “Applying Risk Management to Project Performance” 15

Section Start-up – Project Control Systems SOW for CM role Structured filing system (or PM software) Document Control System Daily reporting procedure (including photos) Schedule of meetings and invitees 16

Section Start-up – Communication Plan Routing of paperwork Distribution Archiving parameters “It is important that the CM clearly understands their role and level of authority with regards to representing the owner” 17

Section 8 Project Closeout & Turnover Section 8 Project Closeout and Turnover 18

Section 8 Project Closeout & Turnover Project Closeout Punchlists Permits and Final Inspections Certificate of Substantial Completion Certificate of Final Completion Beneficial Occupancy As-built Drawings Training 19

Section 8 Project Closeout and Turnover Turnover O&M Manuals Attic Stock Warranties Building Turnover / Move-in Follow-on Contractors Furniture Fixtures and Equipment Project Record Archiving Project Closeout – Final Pay, Retainage Release 20

Section Project Closeout - Punchlists Contractor notification – Initiates process – Notifies work is substantially complete CM and designer –Issue punchlist with SC Certificate Punchlists – Deficiency Log - SampleSample 21

Section Project Closeout–Permits & Final Inspections Final Inspections by trades and AJUs Temporary CO (TCO) Certificate of Occupancy (CO) Other forms 22

Section Closeout–Certificate of Substantial Completion Issued by the Designer CM provides to the contractor along with punchlist Warranties began 23

Section Closeout–Certificate of Final Completion Issued by the Designer Punchlist has been completed 24

Section Project Closeout–Beneficial Occupancy Notice date Take photos CM coordinates any work within the occupied space 25

Section Project Closeout–As-built drawings As-built along with payment applications Final as-built upon project completion 26

Section – 8.10 Project Closeout O&M Manual requirements Training –Schedule –Document Attic Stock Warranties 27

Section – 8.13 Building Turnover & Move-in Coordination with contractor and –Moving crews –Follow-on contractors –Furniture, fixtures and equipment (FF&E) –LEED Enhanced Cx 28

Section – 8.15 Project Turnover–Records & Closeout Project Records Archiving Project Closeout –Final Pay –Retainage Release –Release of Liens 29

Glossary In the Glossary you will find the definitions to 154 commonly used terms in the construction industry. Arranged alphabetically from A/E to Work 30

Appendix A Project Controls specification that outlines the basic requirements for the: Preconstruction Conference Progress Meetings Preinstallation Meetings Submittal Procedures The Contractors CPM Construction Schedule 31

Questions

Lessons Learned

Thank you!