Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
NEES Project Management Workshop June 16 June 18 1 Segment 2.
1 LaCrosse PMI Chapter Meeting A discussion about the Introduction of PM within your business 4/20/2011 Jim Strong Mayo Clinic DLMP PMO Director.
Project Scope Management
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
© 2008 by Prentice Hall 1 Chapter 2. © 2008 by Prentice Hall 2 Project – a planned undertaking of related activities to reach an objective that has a.
Project Management Session 7
Chapter 3: The Project Management Process Groups
By Saurabh Sardesai October 2014.
1 Practical use of six-sigma for the IATA Fuel Program Tom Fodor Assistant Director E&M.
Six Steps to a Better WBS Presented by 41 Bloomfield Street Lexington, MA USA © 2011 Project Management Partners.
Project Management and Scheduling
Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name.
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Roles and Responsibilities QMS Infrastructure. All Rights Reserved, Juran Institute, Inc Performance System.v1 1.PPT Learning Objectives 1.Become.
Advanced Project Management Project Plan Templates
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Systems Analysis and Design in a Changing World, 6th Edition
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Project Management Process Overview
Edward B. Farkas, Managing Director, Project Management Practice
Z26/GI03: Project Management Tutorial: What to include in your presentation Graham Collins.
Project Management Life Cycle Katy Koenen 05/07/2013.
WEEK 3 Introduction to Project Management. Agenda Review – Any questions from last week Phase 2: Planning ◦ Project Plans & Deliverables.
Produced by: 5 Keys Proven to Enhance Worker Performance E.J. (Ted) Lister Lister Management Inc.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
PLANNING AND SCHEDULING
The Project Plan IT Project Management COSC
Task: Copyright © 2003 PM tec, Inc; D. Sankey; D. Padelford. All rights reserved. 1 Fast Start For Projects  Electric Dipole Moment Project Facilitator:
Produced by: Operations Turnaround Leadership and Integrated Turnaround Planning A. Bobby Singh, President Project Assurance, Houston, Texas.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Basic of Project and Project Management Presentation.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
SacProNet An Overview of Project Management Techniques.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
Ch 4 - Learning Objectives Scope Management You should be able to: n Discuss the relationship between scope and project failure n Describe how strategic.
Produced by: KPI’s for Measuring & Controlling STO Projects E.J. (Ted) Lister Lister Management Inc.
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
1 Advanced Project Management Project Plan Templates Ghazala Amin.
Develop Project Charter
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
XLIX Engineering Design Firm © 2010 ENGR/ETGR Definition of Project 1 A project is “…a combination of human and non-human resources pulled together.
Project Management Process
Recent trends in IT projects – Globalization, outsourcing, and virtual teams Project management process groups – Initiating, planning, executing, monitoring.
State of Georgia Release Management Training
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
1 STO Navigator™ - 3 Day Best-Practices Seminar Copyright© Shutdowns, Turnarounds and Outages Presentation Agenda Day One Introduction.
Copyright© 2008 all right reserved 1 Establish an Effective Turnaround Management Process World-Class Future Vision.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
#atpconf What’s in Your Program Toolbox?. #atpconf Presenters ■ Jessi Mielke  Certification Program Manager  Esri ■ Lisa O’Leary, Ph.D.  Senior Psychometrician.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
Creating a Work Breakdown Structure with Microsoft Project.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
MAINTENANCE PLANNING AND SCHEDULING
Project Management Chapter 11.
Presentation transcript:

Agenda Ej Lister – President & CEO – STOnavigator™ inc. Managing Contractors, Logistics and Resources while reducing risk of congestion, and meeting all 3 KPI’s for the Execution Phase: Safety, Quality, Wrench-time 7 Keys to Successful Shutdowns Turnarounds & Outages Reliability Asset Management Team (RAMT) Key Performance Indicators (KPI’s) Achieving Zero Incidents Achieving Zero Re-work Achieving 60% wrench-time STO Stakeholder Strategies (Steering Committee) STO Project Controls (Cost/Planning/Scheduling/Logistics/Execution) Receiving accurate field updates Using Shift-Reports and not Look-a-heads Measuring Success Ej Lister – President & CEO – STOnavigator™ inc.

7 Keys to successful Shutdowns Turnarounds & Outages Asset Management Only through effective Asset Management and Risk/Cost Benefit Analysis can the Workscope and Budget for a STO project be managed and controlled… Methodology Only with a formal process, supported by technology and best-practices can a STO project be planned, executed and controlled efficiently… Organization A competent STO Manager, supported by a Stakeholder Steering Committee and a Project Controls Team is essential in establishing, and achieving the STO Key Performance Indicators (KPI’s)… Strategic Planning How each Stakeholder intends to add value—to meet the STO KPI’s—needs to be established, communicated and practiced as an integrated strategy… Planning & Scheduling Detailed Planned Job Packages (PJP’s) must be created with input from all Stakeholders, prior to Dynamic Schedule Management by the Project Controls what-if Team… Execution Management Executing according to the Plan to meet Safety, Quality and Wrench-time Performance Targets, while providing accurate and timely status updates from the field to produce a new Plan… Lessons-Learned Continuous Improvement is the last, but not least, key to successful Shutdowns, Turnarounds & Outages by capturing Lessons-learned… 2

The Reliability Asset Management Team Production Operations Technical/Engineering Maintenance Assigns the STO Project Manager STO Project Controls Coordinator STO Stakeholder Steering Committee STO Planning/Scheduling/Logistics Manager STO Planning/Scheduling/Logistics Team 3

Key Performance Indicators Key Performance Indicators and Targets are established by the STO Stakeholder Steering Committee with the STO Project Manager’s support Strategic Planning and Planning & Scheduling efforts must all focus on achieving the KPI Targets If you focus on Safety, Quality and Wrench-time, you’ll have the lowest cost, shortest duration STO project

STO Stakeholder Strategies (Steering Committee) Purpose Establish Stakeholder Strategies to achieve KPI Targets Establish Orientation/Communication Documents Tools/Information Stakeholder Strategy Document Best-practices Lessons-learned Procedure Schedule a Stakeholder Strategy Workshop Complete the Strategy Document Template Issue for review and approval Schedule Tasks on the Milestone Schedule (as applicable) Add items to the Action Items List (as applicable) Add items to the SWOT Report (as required) Orientation/communication Add all applicable policies, procedures, guidelines and information to the Orientation Package It does not good to create a Permit Strategy if you don’t inform Contractors where to receive a Permit… 5

STO Project Controls (Cost/Planning/Scheduling/Logistics/Execution/Dashboards) War Room Functional Team Representatives work together in a War Room setting Data Management and Document Control Communication Centre Cost Budget Control and Cost Management Planning Planned Job Package (PJP) Development Scheduling Dynamic Schedule Management (DSM) Weekly Milestone Schedule Daily Shift Reports Logistics Logistics Management Execution Contractor and Resource Management Work Management Dashboards Performance Dashboards report in Real-Time 6

Dynamic Schedule Management (DSM) Programming Programming is a function of establishing codes and parameters for the Scheduling Software to Schedule (verb) to produce a Plan (noun) Programming is done during the Strategic Planning Phase Scheduling Primarily done by the Scheduling Software, not by a Scheduler Majority of Scheduling is done during the Execution Phase Producing a Plan The Scheduling Software generates a Plan based on Programming, Priority, Resource Availability, Time-constraints by Work Breakdown Structure and Activity Codes 7

Dynamic Schedule Management (DSM) Activity Code Example Risk Grid 8

Shift Reports versus Look-a-head Schedules The Shift Report is generated by WBS after a new plan has been scheduled by Project Controls using Dynamic Schedule Management The Shift Report is printed on a different color paper each day The Shift Report can be copied in black& white for distribution to Contractors, Vendors, Coordinators, etc. Only the colored copy of the Shift Report is returned to the War Room for updating and progressing Updates are done, and new Shift Reports are created, between the hours of 03h00 - 05h00 each day The Shift Report is generated with a 12-hour look-a-head – NO MORE Using look-a-head schedules (bar charts) is a dangerous method, resulting in congestion, high risk, inefficiencies, etc. 9

Measuring Success Data Dashboards Reports 10

Thank you for participating – Questions? End of Session 5 Managing Contractors, Logistics and Resources while reducing risk of congestion, and meeting all 3 KPI’s for the Execution Phase (Safety, Quality, Wrench-time) Thank you for participating – Questions? 11